1 / 8

Manufacturing Process

These all manufacturing process, are the steps through which raw materials are transformed into a final product. ... These materials are then modified through manufacturing processes to become the required part.

30028
Download Presentation

Manufacturing Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PURCHASE. IQC. PRODUCTION PLANNING &Control. PRODUCTION. OQC. WAREHOUSING. LOGISTICS. AFTER SALES SERVICE.

  2. Needs Analysis Purchase Requisition to PurchaseOrder Purchase Order Review and Approval Requests forProposal Negotiation andApproval Shipping and Receiving Three-Way Matching Invoice Approval andPayment Focus on vendor collaboration and communication

  3. Testing and analysis Physical properties testing andmeasurement. Mechanical propertiestesting Regulatorytesting Verifying the component data form (CDF) and other documentation

  4. Forecast the demand of yourproduct. Determine potential options forproduction. choose the option for production that use the combination of resources moreeffectively. Monitor andcontrol. Ensure cost-efficient productionprocess. Minimize productiontime. Coordinate with departments about production, to ensure things are on the same page Ensure the right man is assigned the rightwork

  5. ProductionLine. Assembly. Testing. Packaging. Planningof semi-finishedgoods. Maintain ContinuousFlow Effective Fixed PositionManufacturing

  6. checking the finished with packaging, using AQL samplingplan. pick out a defective products, parts, components or material, keep themin defective piles, and send back to rework.

  7. Receiving ofFinished Goods. Put-Away Procedure. Value- Adding Storage Picking Packing Dispatching

  8. THANK YOU Visit More https://www.erdglobal.com/

More Related