PC Hardware and Infrastructure Costs

PC Hardware and Infrastructure Costs. Hierarchical network structure based on different levels of Ethernet. Commodity PCs in midi-towers, rack mounted. PC hardware Dual PIII 600 |MHz, 256 MB memory, 2 x 15 GB disk, INTEL motherboard, Fast ethernet, midi-tower

HarrisCezar
Download Presentation

PC Hardware and Infrastructure Costs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PC Hardware and Infrastructure Costs Bernd Panzer-Steindel, IT/PDP

  2. Hierarchical network structure based on different levels of Ethernet Commodity PCs in midi-towers, rack mounted Bernd Panzer-Steindel, IT/PDP

  3. PC hardware • Dual PIII 600 |MHz, 256 MB memory, 2 x 15 GB disk, INTEL motherboard, • Fast ethernet, midi-tower • ~3000,- SFr in the year 2000 Dual PIII 800 |MHz, 512 MB memory, 1 x 20 GB disk, INTEL motherboard, Fast ethernet, midi-tower  ~3000,- SFr in the year 2001 Bernd Panzer-Steindel, IT/PDP

  4. Network infrastructure Component cost (SFr) cost per PC (SFr) ------------------------------------------------------------------------------------------------------------ 24 port fast Ethernet switch 3200,- 133 ,- 12 port gigabit Ethernet switch (copper) 7000,- 27,- 20 port Cabletron switch 46000,- 9,- 1 port in the Cabletron 2000,- 8,- Ethernet cable 6,- 6,- --------------- * Assumes 100% populated switches 183,- Network infrastructure cost : ~600,- (year 2000) 183,- (year 2001) Bernd Panzer-Steindel, IT/PDP

  5. Installation infrastructure Component cost (SFr) cost per PC (SFr) ------------------------------------------------------------------------------- Metal rack for 40 PCs 3000,- 75,- Electricity network in the rack (cables, fuses, plugs,etc.) 1000,- 25,- Console, remote reset (not yet implemented, min. cost) 200,- Physical installation 2 person-days 20,- (Rack installation (50,-/h) Electricity cabling PC unpacking and install Network cabling) Bernd Panzer-Steindel, IT/PDP

  6. Running costs Component cost (SFr) -------------------------------------------------------------------- Electricity + cooling 73,- per year System administration 2000,- per year (outsourced) Bernd Panzer-Steindel, IT/PDP

  7. Summary Component cost (SFr) cost for 3 years (SFr) -------------------------------------------------------------------------------- PC hardware 3000,- 3000,- Network 183,- 183,- Infrastructure 320,- 320,- Electricity + cooling 73,- 219,- System administration 2000,- 6000,- ------------------------------------------ 5576,- 9722,- Bernd Panzer-Steindel, IT/PDP