1 / 1

IT System Upgradation by Highbar technocrat Limited at Thomas Cook India

Thomas Cook (India) Ltd is the leading integrated travel and travel related financial services company in the country offering a broad spectrum of services that include Foreign Exchange, Corporate Travel, MICE, Leisure Travel, Insurance, Visa & Passport services and E-Business since 1881<br>

Highbar
Download Presentation

IT System Upgradation by Highbar technocrat Limited at Thomas Cook India

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highbar Business Efficiency Study Thomas Cook (India) Ltd Hardware, OS Migration & Database Upgradation @ TCIL Client Details Client Name Thomas Cook (India) Ltd, Headquartered in Mumbai, India. Thomas Cook (India) Ltd is the leading integrated travel and travel related financial services company in the country offering a broad spectrum of services that include Foreign Exchange, Corporate Travel, MICE, Leisure Travel, Insurance, Visa & Passport services and E-Business since 1881 Industry Travel & Travel related financial Services Industry No of Employees: Over 2500 Website www.thomascook.in Business Requirements Solutions Offered -Hardware out-of-warranty -Memory shortage -> Management reports not executing -SAN space full -> Migration to new SAN -Major system performance issues -Huge data size -> Database size approx 1.2TB with monthly growth of 20 GB -New hardware sizing -> Hardware change -32 Bit system migrated to 64 Bit system -Non- Unicode system migrated to Unicode system -Database migration from Oracle 10.2 to Oracle 11 -Windows 2003 to Windows 2008 - Duration : About 4 Months Benefits to the Client: - System performance (speed, report execution, etc.) improved by 35 to 40% - Increased memory space allocation -> system problems addressed - Hardware upgrade

More Related