1 / 15

Status of the TT2A target experiment 

Status of the TT2A target experiment . A.Fabich CERN AB/ATB ENG/BENE meeting, CERN, 16 th March 2005. Approval Status. APPROVED by the research board CERN 2.Dec.2004: … The proposal was approved by the Research Board, subject to further clarification of the resources …

Download Presentation

Status of the TT2A target experiment 

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the TT2Atarget experiment  A.Fabich CERN AB/ATB ENG/BENE meeting, CERN, 16th March 2005 A.Fabich, CERN AB/ATB

  2. Approval Status • APPROVED by the research board CERN • 2.Dec.2004: … The proposal was approved by the Research Board, subject to further clarification of the resources … • 3.March 2005: fully approved (oral information) • CERN experiment database: http://greybook.cern.ch : nToF11 A.Fabich, CERN AB/ATB

  3. Safety • In close collaboration with Safety Commission (SC) • No obstacles • Hot issues (mercury, activation, …) evaluated • Basic procedures and specifications defined for safe operation A.Fabich, CERN AB/ATB

  4. Target: 1-cm diameter mercury jet, v=20 m/s Proton beam: 24 GeV, <28x1012 ppp, total of 100 pulses Meson capture: 15 Tesla solenoid field (pulsed) Study … proton induced shocks Magneto-fluid-dynamics Secondary particle yield NOMINAL target test A.Fabich, CERN AB/ATB

  5. Pump Motor Secondary Containment Sump Tank Target Module CentrifugalPump w/ Magnetic Coupling Hg Jet Containment Hg Target Jet System V.Graves, ORNL A.Fabich, CERN AB/ATB

  6. Hydraulic Pump, Reservoir, & Flow Control Valve Pump Systems EM centrifugal pump or Hydraulic piston pump A.Fabich, CERN AB/ATB

  7. 15 T pulsed solenoid • 3rd coil production completed • Integration into cryostat starts • Testing scheduled in summer 2005 at MIT P.Titus, MIT A.Fabich, CERN AB/ATB

  8. Solenoid Beam Attenuator Proton Beam Hg Delivery System … on the beam line V.Graves, ORNL A.Fabich, CERN AB/ATB

  9. Cryogenic system • Base line scenario • Final design dependent on performance tests at MIT A.Fabich, CERN AB/ATB

  10. Power supply • Reuse existing CERN power supply • Previously used for extraction towards SPS West Area A.Fabich, CERN AB/ATB

  11. TT2A Periphery PS beam experiment Equipment ISR Control Room Control room A. Fabich A.Fabich, CERN AB/ATB

  12. Primary Containment Hg Jet Z=0 Viewport Secondary Containment Proton Beam Primary Containment A.Fabich, CERN AB/ATB

  13. Optical Diagnostics Retro-reflected design, Optical high speed recording (<1 MHz) e-Drawing - Van Graves, ORNL e-Drawing - Van Graves, ORNL One set of optics per viewport T.Tsang, BNL A.Fabich, CERN AB/ATB

  14. Secondary particle yield • momentum p = 24 GeV/c • 4 bunches within 8 PS buckets at our discretion • tpulse= 0.5-2 microseconds • tbunch=50ns full length, peak-to-peak 250 ns • < 7 TP per bunch, total intensity < 28 TP/pulse • spot size at target: <2 mm r.m.s. Pump-Probe method for cavitation studies A.Fabich, CERN AB/ATB

  15. Time schedule • 2003 • Autumn LOI • 2005 • March nToF11 approved • Spring solenoid construction completed • Summer solenoid tests • Winter construction of Hg system • 2006 • April solenoid test finished • June solenoid shipped to CERN • autumn integrated test at CERN • Dec fully ready for beam • 2007 • April final run at PS start-up Budget: ~2.5 M$ A.Fabich, CERN AB/ATB