An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PT SEPOETIH DAYA PRIMA PLTU 2X7 MW LAMPUNG TENGAH

  2. PT SDP - OVERVIEW

  3. PT. SEPOETIH DAYA PRIMA DATA TEKNIS – MAIN EQUIPMENT

  4. PT. SEPOETIH DAYA PRIMA • STEAM BOILER : • Manufacture : Wuxi Huaguang • Type : Single Drum • Model : XG-40/3.82-M • Quantity : 2 Unit • Rated Capacity at MCR : 40 T/H • Rated Steam Pressure : 3.82 Mpa • Rated Steam Temperature : 450 ᵒC • Hot Air Temperature : 120 ᵒC • Flue Gas Air Temperature : 160 ᵒC • Design of Efficiency of Boiler : 81.1% • Feed Water Temp of Inlet : 150 ᵒC • Fuel Consumption : 7.209 kg/h STEAM BOILER

  5. PT. SEPOETIH DAYA PRIMA • STEAM TURBINE : • Manufacture : QindaoJianeng Steam Turbine. Type : Single shaft and full condensing Model : N7-3.43 Quantity : 2 Unit Rated Speed : 3,000 RPM Critical Speed : 1,848 RPM Rated Steam Inlet Pressure : 3.43MPa Rated Steam Inlet Temperature: 435 C Main Steam Flow (Rated) : 35.1~39 TPH Number of Stage Extraction : 3 Boiler Feed Water Temp : 150 C Cooling Water Temp Normal : 30C, Max 33 C Guaranteed Steam Consumption : ≤ 5.01kg/kWh Turbine

  6. PT. SEPOETIH DAYA PRIMA • GENERATOR • Manufacture : Jinan Power • Type : QFW-7.5-2 • Quantity : 2 Unit • Average power output : 7 MW • Speed : 3,000 RPM • Voltage : 6,300 V / 6.3 Kv • Frequency : 50 Hz • Power Factor : 0.8 • Excitation Mode : Brushless Generator

  7. PT. SEPOETIH DAYA PRIMA Condenser

  8. PT. SEPOETIH DAYA PRIMA Cooling Tower

  9. PT. SEPOETIH DAYA PRIMA DCS : Siemen SPPA – T3000 Control Room

  10. PT. SEPOETIH DAYA PRIMA O & M by Team SDP Since January 2016

  11. TUJUAN PELAKSANAAN O&M

  12. OPERATION & MAINTENANCE (O&M) Note : SejakJanuari 2016 hinggasaatini, kegiatan O&M PLTU Lampung Tengah telahdilakukanolehPT SepoetihDaya Prima.

  13. STRUKTUR ORGANISASI – Team SDP

  14. STRUKTUR ORGANISASI – Tim SDP Jumlah Karyawan 63 Orang

  15. ZONING AREA PLTU : ZonaBolier & Coal Handling :Zona WTP & WWTP : Zona Turbine

  16. ZONA BOILER & COAL HANDLING DCS Operator Boiler (2 Orang) Site OperatorBoiler dan Coal Handling (2Orang)

  17. ZONA TURBINE DCS Operator Turbine (2 Orang ) Server + Panel Logic Control DCS Site OperatorTurbine (1 Orang) Condenser Steam Turbine

  18. ZONA WTP & WWTP Intake Pump House Waste Water Treatment Plant Water Treatment Plant Laboratory – Sampling System WTP, RO dan WWTP Operator 2 Orang

  19. PT. SEPOETIH DAYA PRIMA PeningkatanKualitas SDM

  20. SERTIFIKASI KOMPETENSI O&M PEMBEKALAN & UJI KOMPETENSI O&M - JUNI 2016

  21. SERTIFIKASI KOMPETENSI O&M

  22. PT. SEPOETIH DAYA PRIMA Problematika & Solusi pelaksanaan O & M

  23. 1. OTOMATISASI SISTEM TIMBANGAN Problem : Pencatatansuplaibatubaraygtidakakurat. Solusi : OtomatisasiSistemtimbangan (Nov 2015), ygbertujuan : Kontrol & recording otomatis/real time. Pencatatanberatbatubara yang dikirim supplier, dengansistemTimbanganotomatis. 3. Database supplier, rekapharian, bulanan CCTV 1 1. Pemasangan CCTV padaTimbanganTrukBatubara CCTV 2 CCTV 3

  24. OTOMATISASI SISTEM TIMBANGAN 2. Koneksi CCTV pada Laptop dan HP secara real time TampilanGambar CCTV di Laptop TampilanGambar CCTV di HP

  25. OTOMATISASI SISTEM TIMBANGAN 3. OtomatisasiPencatatanTimbanganTrukBatubara 2. TiketMasuk 3. Scan Barcode 4. TandaTerima 5. File Server 1. Input plat nomortruk & supplier

  26. OTOMATISASI SISTEM TIMBANGAN 4. Software/Program PencatatandanLaporanTimbanganTrukbatubara Pencatatan Database Suplier PencatatanTrukKeluar PencatatanTrukMasuk RekapPenerimaan per Suplier Historical PO RekapHarianPenerimaan

  27. PT. SEPOETIH DAYA PRIMA Kunjungan– Kunjungan ke PLTU 2x7 MW Lampung Tengah

  28. 1. SITE VISIT - PLN REG KALIMANTAN (16/07/2016)

  29. 2. SITE VISIT - PUSDIKLAT PLN SURALAYA (23/02/2017)

  30. 3. SITE VISIT - PJB SERVICES (10/08/2017)

  31. 4. SITE VISIT - PLN PAPUA (29/08/2017)

  32. 5. SITE VISIT - PLN KALIMANTAN (18/09/2017)

  33. 6. SITE VISIT - INDONESIA POWER & PJB (18/09/2017)

  34. TERIMA KASIH • PENYESUAIAN TARIF KOMPONEN B & D PENYESUAIAN TARIF KOMPONEN B & D