1 / 2

construction site labour camp septic tank cleaning service

It is suggested to build labour colonies or camps close to the project's building location. The building project will take four to five years to complete, and 100 to 200 people will be needed on average and at its busiest times. For this type of work, 45 litres of water are needed daily on average.

Seetharam1
Download Presentation

construction site labour camp septic tank cleaning service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Site Labour Camp Septic Tank Cleaning Services It is suggested to build labour colonies or camps close to the project's building location. The building project will take four to five years to complete, and 100 to 200 people will be needed on average and at its busiest times. For this type of work, 45 litres of water are needed daily on average. Since the majority of the building site is located in an industrial area with a meagre residential water supply, the demand for household water at the site is significant. Sewage from labour camps and colonies is a major source of pollution during the project construction phase, contributing to water contamination of the environment. Each group of 20 persons can have access to one shared lavatory. The sewage from the public restrooms can be collected. Domestic sewage was typically transported by sewage vacuum tankers, which was the most popular method of handling everyday waste. However, this procedure was both time- and money-consuming. The alternative to this is to treat sewage waste on-site. The best option for effectively managing daily sewage waste water is Chemtronics' Decentralised Green STP AD+ Sewage Treatment Plant. Along with the domestic sewers, the labour camp also has cement and sand fragments from the workers' baths and hand washings. Because of this, standard sewage treatment procedures are challenging. For the removal of these contaminants as well, Chemtronics offers a tailored Green STP solution. To prevent a decline in the quality of the receiving water bodies, it is suggested that the sewage be treated before being disposed away. It might also be refused.

  2. Our Services Septic Tank Cleaning Services Residential Septic Tank Cleaning Services Commercial Septic Tank Cleaning Services Construction Site Labour Camp Septic Tank Cleaning Services STP Plant Cleaning Service Our Location: Plot no:25 Niladri Nagar, Injapur, Hayathnagar, Vanasthalipuram, Hyderabad-500070 Telangana, India. Our Phone +91 9866365735, Email:srimanjunathaseptic@gmail.com URL:https://www.srimanjunathaseptictankcleaning.com/construction-site-labour-camp-septic-tank- cleaning-services.html

More Related