1 / 17

SULAIR Technical Services All Staff Meeting

SULAIR Technical Services All Staff Meeting. March 23, 2011 Catherine Tierney. Technical Services -All Staff Meeting. Announcements Metadata Special Projects status WEST (Western Regional Storage Trust) GSB-South Building planning status. Announcements.

afra
Download Presentation

SULAIR Technical Services All Staff Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SULAIR Technical ServicesAll Staff Meeting March 23, 2011 Catherine Tierney Technical Services Meeting

  2. Technical Services -All Staff Meeting • Announcements • Metadata Special Projects status • WEST (Western Regional Storage Trust) • GSB-South Building planning status Technical Services Meeting

  3. Announcements • Kate Contakos, Head of Preservation • New SULAIR Home Page – coming in fall • Drupal for TS Departments’ Web Sites • Page Mill Road – staff moves Technical Services Meeting

  4. Technical Services Meeting

  5. Technical Services Meeting

  6. Technical Services Meeting

  7. Announcements • Kate Contakos, Head of Preservation • New SULAIR Home Page – coming in fall • Drupal for TS Departments’ Web Sites • Page Mill Road – staff moves 23 March 2011 Technical Services Meeting Technical Services Meeting 7

  8. 1450 Page Mill Road (PMR) • Preservation Department Units: Conservation Lab, Repair Unit • DLSS: Media Reformatting (audio & video) • LOCKSS • SU Press • NEW Special Collections: Archives processing, Rare Book cataloging, processing projects Technical Services Meeting

  9. Analyze SAL3 sets “Post-Marcadia” backlog cleanup Hoover transfers SAL Dewey problems Heading cleanup (Authority records) GovDocs cleanups Slavic cleanup projects SearchWorks data cleanups Ebook record loading Esoteric language backlog Serials record cleanup from projects Metadata Projects Phase 1 Technical Services Meeting

  10. Metadata Projects Phase 1 Items Newly Cataloged: 78,000 Updated Bib Records: 156,000 Maintenance Transactions: 161,000 Technical Services Meeting

  11. Metadata Projects Phase 2 • Green Library – barcoding “completion” • More SAL3 sets to analyze title by title • OCLC “unresolved” records from data cleanup • More Slavic cataloging backlog • More Serials cataloging cleanups • Catalog pockets of odd collections in SAL • Old German dissertations, International dissertations Technical Services Meeting

  12. Western Regional Storage Trust (WEST) • Goal: Develop a shared retrospective print journal repository program among research libraries in the West • Preserve the scholarly print record • Provide access to archived materials, when needed • Create opportunities to reallocate physical space Technical Services Meeting

  13. Western Regional Storage Trust (WEST) • Volumes stored in SAL3-like space • Cleanliness, temperature & humidity control • Security (i.e., not open stacks) • “Validation” at volume level or issue level • Depending on amount of duplication and of risk (as defined by WEST) • Condition assessment for one category of risk • If needed by others: • Photocopy, scan, fax • Lending across libraries for IN-HOUSE USE Technical Services Meeting

  14. GSB-South Building • Question: Does it make sense to relocate all programs and staff in Meyer Library to the soon-to-be vacated Business School building, GSB-South? • General fit? = yes, all of it probably can fit • More specific design and cost = study in process (due in May) • NOT A DONE DEAL. School of Ed also doing an assessment of fit • Decision in 6 months or so. The game is afoot. Technical Services Meeting

  15. GSB-South Building • Meyer programs to fit: • East Asia Library and its collections (Meyer 4 and mezzanine) • Technical Service operations on Meyer 3 • ESP (including Systems Team) from Meyer 3 • DLSS (most of it) from Meyer 1, 2 & 3 • Academic Computing Services from Meyer 1 & 2 Technical Services Meeting

  16. GSB-South Building • GSB – 4 (complex) floors plus basement; poor situations for elevators and loading dock • Advocating for TS - flexibility • All our operations on one floor • Close to Systems and much of DLSS (same floor) • Very open floor plan • Remove most office walls • Furniture options to anticipate future work styles • Isolate the noisier activities (restrooms, lunch room, conference rooms, etc.) Technical Services Meeting

  17. GSB-South Building • Current state of planning • Architects met with Department Heads for overview of our objectives – workflow efficiencies, flexibility for future, synergies • TS adjacencies sketched by Tech Service heads • This Friday, architects respond with detailed adjacencies draft within the space (4th floor) • To departments to discuss • Lesser challenges than those of Academic Computing and East Asia Library Technical Services Meeting

More Related