An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Output Based Limit 2/14/06 Goals: 1. Credit for Hg removal from coal washing, other pre-combustion processes 2. Provide flexibility 3. Mercury cuts consistent with the Governors proposal 4. Encourage efficiency Illinois Environmental Protection Agency / Bureau of Air

  2. (Output Based Limit – cont.) Coal Washing Credit • See Handout – “Coal Washing Credit Example” 0.0060 lbs Hg/GWh Lower Boundary - any standard above gives some credit for coal washing under example case.

  3. (Output Based Limit – cont.) Consistent Hg Cuts • 702 lbs Hg/yr = 90% Control • IL Gross Electric Output for Coal-fired EGU’s = 84 TWh/yr • 702 lbs Hg/(84 TWh x 1000 GWh/TWh) = 0.0084 lbs Hg/GWh 0.0084 lbs Hg/GWh Upper Boundary Note: 702 lbs/yr by 2012 well below CAMR budget of 1,258 lbs/yr by 2018

  4. (Output Based Limit – cont.) Setting the Standard 90% [Range:0.0060 lbs Hg/GWh - 0.0084 lbs Hg/GWh] 0.0080 lbs Hg/GWhgross = Goals 75% [0.0080/(1-.90) = X/(1-.75)] 0.020 lbs Hg/GWhgross

  5. Temporary Technology Based Extension IF: • Acceptable Control Configuration • Appropriate Optimization Techniques • Compliance Plan THEN: • Semi-Automatic Extension (minimal IEPA review/discretion) • Required Interim Control Efficiency • Further Optimization Required • 2nd Extension more Difficult