1 / 35

Atlantic LNG Trinidad Train 4 Project Benchmark Subcontractor Safety Performance Through Leadership and Ownership

BECHTEL INTERNATIONAL INC. CASE STUDY. Atlantic LNG Trinidad Train 4 Project Benchmark Subcontractor Safety Performance Through Leadership and Ownership. Presented by Tom Hill DaCosta Kirton Geoff Cislo. PRE - 1996. PRESENT. OBJECTIVES.

aimon
Download Presentation

Atlantic LNG Trinidad Train 4 Project Benchmark Subcontractor Safety Performance Through Leadership and Ownership

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BECHTEL INTERNATIONAL INC. CASE STUDY Atlantic LNG Trinidad Train 4 ProjectBenchmark Subcontractor Safety PerformanceThroughLeadership and Ownership • Presented by • Tom Hill • DaCosta Kirton • Geoff Cislo PRE - 1996 PRESENT

  2. OBJECTIVES 1. Agree that world class Safety Performance is possible in countries that do not have world class safety regulations 2. Validate the importance of strong leadership skills in implementing a zero accident program 3. It is possible to overcome cultural / social stereotypes that can negatively affect Safety Performance

  3. OBJECTIVES 4.Concur that continuous Safety improvement requires management /supervision to be “on the field" making it happen not in the stands cheering 5. You canimplement a People Based Safety program that works, in a culture with no previous experience

  4. BACKGROUND - British control in the 19th century. - Independence in 1962. - One of the most prosperous in the Caribbean thanks largely to petroleum and natural gas production and processing. - Located in the Caribbean between the Caribbean Sea and the North Atlantic Ocean and is northeast of Venezuela. TRINIDAD & TOBAGO

  5. TRINIDAD & TOBAGO • It covers a total area of 5128 sq km and is slightly smaller than Delaware. • 590,000 Trinbagonians make up the Labour force - Trinidad & Tobago has a population of 1,275,700 persons: • 40.3% consist of East Indian • 39.5% consist of of African • 18.4% consist of a Mixed origin • 0.6% consist of Caucasian • 1.2% consist of Chinese and other races.

  6. Safety and Health, Goals and Targets, and Expectations TRINIDAD TRAIN 4 PROJECT GOALS SAFETY & HEALTH: • Achieve zero incidents by providing a work environment where Safety Performance is optimized and risks are managed to prevent accidents during Plant Construction and Operation. LNG PRODUCTION: • Meet or exceed Trinidad Train 4 Project performance guarantees and availability. SCHEDULE: • Achieve takeover of the facilities on or before the schedule completion : • Train 4 TBD • Tank 4 TBD • Obtain full commitment from all contractor personnel, subcontractors and project team. COST: • Reduce Project Costs for all Stakeholders. QUALITY: • Design, engineer, procure, construct, commission and bring into operation an LNG plant that meets or exceeds project requirements and industry standards that will produce LNG safely and cost effectively throughout the design life of the plant. WORKING RELATIONSHIPS: • Create and maintain mutual relationships characterized by open communication, trust, honesty and commitment to shared goals. ENVIRONMENTAL: • Design, construct and operate a plant in conformance with current Government of Trinidad & Tobago standards and international environmental guidelines and practices consistent with the LNG industry both in Trinidad & Tobago and worldwide. • Establish or reinforce environmental policies that make positive social and economic impacts on the surrounding areas. • Secure all permits & licenses from regulating authorities in a timely manner to meet project schedule • Project Goals - Achieve ZERO incidents by providing a work environment where Safety Performance is optimized and risks are managed to prevent accidents during plant Construction and Operation. • MEETING / EXCEEDING CUSTOMER EXPECTATIONS VIDEO

  7. Safety and Health, Goals and Targets • Project Performance Measurement Values RECORDABLE LTA • Developed by customer and included in contract • Basis for rewarding performance as part of Incentive program • Threshold value = Upper Boundary value that must not be exceeded to earn incentive payment.

  8. Safety and Health, Goals and Targets • Target Value = Midpoint value required to earn the incentive payment. • Stretch Value = Lower Boundary value required to earn the incentive payment.

  9. EXISTING CONDITIONS /FACTORS AFFECTING SAFETY PERFORMANCE • TRINIDAD AND TOBAGO HAS NO CURRENT ES&H REGULATIONS • Proposed 2003 Draft HSE Bill still to be signed. • TRINIDAD AND TOBAGO COST OF ACCIDENTS 1976-1998 • Direct Cost = US$ 25,000,000 (Source: National Insurance Board) • Indirect Cost = US$ 100,000,000 • Total Cost = US$ 125,000,000

  10. CII ZERO INJURY TECHNIQUES IMPLEMENTED WORKING RELATIONSHIPS • MANAGEMENT COMMITMENT - Working Relationship - Resources - Transfer of Technology - Accept Ownership of Safety Process - Incident investigation - Zero Accident Team (HSE Governance Committee) GOALS: • Create and maintain mutual relationships characterized by open communication, trust, honesty and commitment to shared goals. STRATEGIES: • Conduct a survey (minimum every 3 - 6 months) in Site, Houston, Port of Spain and key interfaces . • If survey result less than 85% , conduct a follow up teambuilding session. • If survey result greater than 85%, have a team celebration. • Provide Bechtel/ALNG/ Phillips Leadership Training to assist in developing a high performance team. TARGETS: • Survey results: Threshold 75% ; Target 85% ; Stretch 100% VIDEO

  11. CII ZERO INJURY TECHNIQUES IMPLEMENTED SAFETY & HEALTH GOAL: • Achieve zero incidents by providing a work environment where Safety Performance is optimized and risks are managed to prevent accidents during Plant Construction and Operation. STRATEGIES: • Implement an effective behaviour based Safety and Health Program. • Fully comply with Atlantic LNG Safety and Health requirements. • Raise the level of Safety Awareness. • Control exposure to risks. • Increase management involvement in the safety process. • Perform Quarterly Safety & Health Management Audits. • Conduct Weekly Safety Inspections/Assessment. • Provide New Hire Orientation for 100% of the workforce. • Provide Job Safety Analysis training ( 100% of supervisory staff). • Conduct Environmental Awareness training ( 100% of workforce). • Conduct Random Drug Screening ( 1% of workforce). • Conduct Joint Emergency Evacuation/ Exercises ( 1 per Quarter). • RISK REDUCTION METHOD - Pre-project and Pre-planning - Training and Education - Accident-Incident Management - Drug Alcohol Program - People Based Safety - Audits / Inspections VIDEO

  12. CII ZERO INJURY TECHNIQUES IMPLEMENTED • RECOGNITION AND REWARDS -Attendance Incentive - Safety Incentive - Fringe Incentive - (S.H.O.T) Safe Habits Observation Team Incentive - Contractor Performance Incentive • SUSTAINABILITY -Customer Satisfaction -Future work

  13. Safety Performance Summary 1st August 2002 – 30th June 2005 Days without LTA OSHA Recordables Lost Time Accident (LTA) Manhours without LTA Manhours without OSHA Recordables Lost workdays Start of construction : 1st August 2002 Manpower on site: 3,300 workers TRAIN 4 RECORDABLE LTA

  14. Subcontractor Safety Performance (Project to Date)

  15. Subcontractor Safety Performance (Project to Date )

  16. NO. OF RESPONDERS / GROUP

  17. NO. OF RESPONDERS / GROUP

  18. Project Management Team Commitment / Ownership -Leadership role in ES&H -Positive Working relationships with customers and subcontractors -Work Execution Philosophy: for us (Bechtel) to be successful, we have to make our Subcontractors successful

  19. Project Management Team Commitment / Ownership - Mandatory attendance at plan of the day and Tool box meetings - Provide resources and staffing level of one (1 ) Safety Representative / 50 workers minimum - Bechtel, Customer, Subcontractor Weekly Management Safety Walk downs per area - Increased Management attendance / participation via Specially prepared “Monday Management Safety Talk” VIDEO Bechtel International Inc. Atlantic LNG Expansion Projects Job Nos.: 24560 Environmental, Safety & Health Department • (4th July 2005) • The Train 4 Project has worked 10,444,057 hours as of 25th June 2005 without a lost time injury. The last recordable was on the 23rd May 2005. We have had ten (10) OSHA Recordable to date. • Please pay attention to the following: • Permits – Application for work permits must be turned into Bechtel Safety Department at least 24 hrs in advance. • Access – The ISBL is becoming a parking lot for personal cars. Please do not park in the process areas. • Lockout / tag out – Reminder, all persons involved in working on systems must perform visual checks (for tags and locks). • Valves/Cables – Tags on valves and other equipment are being removed, anyone caught removing tags will face disciplinary action. • Color code – The color code for this quarter (July – September) is BLUE Monday Management Safety Talk

  20. Project Management Team Commitment / Ownership - Zero Accident Team is the HSE Governance Committee • Mission Statement – A committee of your Company's most Senior Management personnel who meet twice monthly to hold discussions on providing guidance, assistance and leadership to all employees on the jobsite on the Project’s Safety and Health Program

  21. RISK REDUCTION METHODS • RAISING LEVEL OF SAFETY AWARENESS Naming on Plot Plan and Drawing the Permanent Plant Roads/Streets with a Safety Related Name : -Zero Tolerance -Safe Way blvd -Done Done Road -Hard Hat Lane -Toe Board Alley - Walk the Talk VIDEO

  22. RISK REDUCTION METHODS • TRANSFER OF TECHNOLOGY • OSHA 10 hours training to craft apprentice • Teaching evening classes on / off jobsite • Advisor to Emergency Management Authority • EX-Chairman of Safety Council of Trinidad and Tobago – South West Chapter • Permanent Representative on Non- Governmental Organization Area Hospital VIDEO

  23. RISK REDUCTION METHODS ROAD SAFETY AWARENESS

  24. RISK REDUCTION – AUDIT INSPECTIONS • QUARTERLY INSPECTION ON RIGGING / LIFTING EQUIPMENT -Colour code by quarter -Fluorescent paint/tape -Security tie/seals on heavy use rigging 1st QUARTER 4th QUARTER 2nd QUARTER 3rd QUARTER

  25. RISK REDUCTION – TRAINING AND EDUCATION • REDESIGNED ORIENTATION / PROCESS - To provide information on Safety, Quality, Industrial Relations, Timekeeping, Health, security, ISPS, Badging -Increased attention and Interest

  26. RISK REDUCTION – PEOPLE BASED SAFETY • INNOVATIVE APPROACH ON IMPLEMTATION PROCESS - STAGE 1 – 100% BECHTEL NON MANUAL - STAGE 2 – 50% BECHTEL / SUBCONTRACTOR NONMANUAL - STAGE 3 – 100% CRAFT - CROSS CRAFT CONTROL - PRE-ACCEPTANCE ENVIRONMENT

  27. RISK REDUCTION – ACCIDENT MANAGEMENT • INCIDENT INVESTIGATION - Integrated Investigation Team for High /potential Incidents Investigation with Bechtel, customer, subcontractor - Management trained in how to perform Root Cause Analysis from start of project and retrained as construction progressed.

  28. RISK REDUCTION –DRUG AND ALCOHOL PROGRAM

  29. RISK REDUCTION – TRAINING AND EDUCATION • ZERO TOLERANCE ON FALL PROTECTION VIOLATION -100% of Workers required to work in elevated areas must attend and pass the Bechtel 5(five) hour Fall Protection Workshop - Consequences for not tying off -100% Tie-Off Matrix -Vertical Anchor Points using wire rope loops

  30. RISK REDUCTION – TRAINING AND EDUCATION • ESTABLISH MINIMUM REQUIREMENTS for ES&H PERSONNEL -5 Years Experience - OSHA 30 hours construction Safety course - Blood Borne Pathogen Training - CPR / FIRST AID (current)

  31. RISK REDUCTION – TRAINING AND EDUCATION • CREATED SUPPLY TO MEET DEMAND -ES&H Assistants Training Program to provide Trained Personnel for future work. Off project poaching created demand -Mentoring -Training and development -Transfer of Technology

  32. RISK REDUCTION – INITIATIVES -TO REDUCE THE NUMBER OF NEAR MISS AND FIRST AID INCIDENTS BY 75% FOR THE NEXT MILLION HOURS WORKED

  33. REDUCTION METHODS -AGGRESSIVE MEDICAL CASE MANAGEMENT -OCCUPATIONAL HEALTH NURSES AND EMTS - EMPLOYEES CAN GET EXTRA SICK LEAVE DAYS EASILY - IMPLEMENTED RETURN TO WORK POLICY - All WORKERS MUST BE SEEN BY NURSE BEFORE SEEKING OFFSITE MEDICAL ASSISTANCE.

  34. RECOGNITION / REWARDS -Subcontractors Companies receive a Certificate of Completion and a “Write- Up” in the local Newspaper. - Gifts and Achievement certificates at Million Man hours Milestone 1,3,5,7,10 and completion of the project. - Workers receive incentives for attendance, working safe, and making observation as members of PBS

  35. CII ZERO INJURY TECHNIQUES IMPLEMENTED • SUSTAINABILITY -The project has received an “A” rating in ES&H Compliance from our customer - Assist in winning other LNG Work in other companies PRE - 1996 PRESENT