1 / 15

Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012

Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 . Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos. first light / first flight. first flight in spring 2014 from Timmins (48°34' N, 81°22' W) CNES campaign starts March 1st 2014

alena
Download Presentation

Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction of theEUSO-BALLOON 9th Progress MeetingNaples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter vonBallmoos EUSO-BALLOON, 9th progress Meeting 2012

  2. first light / first flight first flight in spring 2014 from Timmins (48°34' N, 81°22' W) CNES campaign starts March 1st 2014 => EUSO BALLOON is to be flight-ready in Timmins by end of february flight scenarios have been elaborated by Jean Evrard for the december flight review => we can make it, but must stay on tight schedule

  3. Timmins

  4. Timmins EUSO-BALLOON, 5th progress Meeting 2012

  5. the lenght of the astronomical night at Timmins (48°34' N, 81°22' W)

  6. EUSO-BALLOON Dashboard 9.11.2012meet dec DR PDM - MAPMT  - EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC  - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, testsDP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture - Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses - manufacturing on track AIT/AIV - planning started IRCAM - position on gondola, safety constraints Documents - 1st versions for dec DR have been read by Pascale

  7. EUSO-BALLOON Dashboard 12.10.2012meet dec DR PDM - MAPMT : Gain measured - EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC : brazing process suspected - EC Proto E waiting for Matra - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board under tests in Corea, expected at LAL mid-Nov - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, testsDP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W ? Architecture - Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses - manufacturing on track AIT/AIV - planning started IRCAM - position on gondola, safety constraints, Documents - very little is written up for the december DR

  8. EUSO-BALLOON Dashboard 9.11.2012meet dec DR PDM - MAPMT  - EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC  - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, testsDP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture - Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses - manufacturing on track AIT/AIV - planning started IRCAM - position on gondola, safety constraints Documents - 1st versions for dec DR have been read by Pascale

  9. Since the last progress meetingAPC Paris, October the 12th • The electrical prototype has been received by LAL (beforepotting) • EC ASIC cardhas been sucessfullytested (before data transmission tests) • Wefixed the design of PWP • The delivery of 19 missingMAPMTs+ UV filterson going (december 2012) • Cockroft Walton and switches prototypes have been testedat APC (and a bit modified to beadapted to MAPMTs) • PDM boarddelay : 6 PCBsproduced and partiallytested, deliveryat LAL isscheduled for end of November, we are tryingnow to organize EC-ASIC/PDM Board communication tests • DP tests are undergoingin Naples • Thermal analysis has been done • Thedocumentation iswell-advanced (architecture documents, Technicalspecification for CPU software , PAIE, updates of Phase A documents, ICD, etc.) EUSO-BALLOON, 9th progress Meeting 2012

  10. Since the last progressmeeting (2) • PWP design defined See Hector Prieto’s presentation • Ec_ASICs electrical tests has been done See Pierre B.’s presentation • CW and switches tests has been done See PhGoro.’s presentation • Writing of the electrical architecture Document See Michel’s presentation • Writing of the mechanical architecture Document See Peter’s presentation • Thermal architecture analysis (Document on going) See Gustavo’s presentation • Tests of HK & LVPS communication • Phase A documents actualized See Andrea‘s presentation • Writing of the CPU software Document See Francesco’s presentation EUSO-BALLOON, 9th progress Meeting 2012

  11. Since the last progressmeeting (3) • Interfaces Control Document has been defined and commenced See Sylvie’s presentation • PAIE Document (about integration) well advanced See Sylvie’s presentation • Verification matrix to the technical requirements has been defined See Guillaume’s presentation • List of the steering committee’s actions See Guillaume’s presentation EUSO-BALLOON, 9th progress Meeting 2012

  12. The work to bedone • Ending the work on the interfaces and writing the related documentation (mechanics I/F, cables, pinoutassignment, etc.) • Ending the communication tests • Performing the HK / LVPS Boardscommunication tests beforemid-december • Performing the CCB / PDM Board communication tests beforemid-december • Organizing and performing the EC-ASIC / PDM Board communication tests beforemid-december • Defining the software specifications • Testingon the EC electricalprototype before end afterpotting • Writing the last versions of the documents EUSO-BALLOON, 9th progress Meeting 2012

  13. Questions and Problems • Expected progresses on PDM board ‘stand alone’ tests • Expected progresses on PDM board / Ec-ASIC communication tests • Expectedprogresses on PDM board/ CCB communication tests EUSO-BALLOON, 9th progress Meeting 2012

  14. The Goal of this meeting • Discussing the last programmatic aspects before CDR Review • Discussing the expectation of the different documents written for the CDR Review • Listing actions EUSO-BALLOON, 9th progress Meeting 2012