An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Clean Development MechanismProjects utilizing Carbon Credits Africa Carbon Forum, Nairobi, March 2010 Radhika Bharat, Senior Investment Officer, Private Sector Infrastructure Development

  2. Madagascar Project Cost EUR 14 mn ADB loan EUR 6 mn ADB roles Project Structuring Long-term Lender Benefits Independent power project (IPP) Expand the supply for electricity Reduce generation cost Long-term socio economic benefits The 15MW Sahanivotry Small Hydroelectric Power Project, a catalyst for Power Sector in Madagascar

  3. Project costs Project Cost USD 26 mn ADB loan USD 9 mn ADB roles Project Structuring Long-term Lender Benefits Independent power project (IPP) Connection of rural population Reduce generation cost Long-term socio economic benefits The 9MW Buseruka Small Hydroelectric Power Project, a catalyst for Power Sector in Uganda

  4. Project Cost EUR 300 mn ADB loan EUR 100 mn ADB roles Mandated Lead Arranger for financing from DFIs and Commercial sources Project Structuring Long-term Lender Notable features: Project is 300MW, with a capacity factor of 55% Project will supply up to 20% of Kenya’s total installed power Kenyan- Dutch project developer, JDA signed with UK based firm Carbon credits to be shared between the Government and project sponsor. Lake Turkana Wind Farm in Marsabit District, near Lake Turkana in north-western part of Kenya

  5. THANK YOU h.cheikhrouhou@afdb.org y.arfaoui@afdb.org r.bharat@afdb.org