An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US LHC Accelerator Research Program bnl - fnal- lbnl - slac LARPAccelerator Systems:Progress Highlights and Goals of the Meeting Vladimir Shiltsev

  2. Events since Port Jeff • LTVAC formed at Port Jeff (10/25/06) • Executive Committee (10/31/06) • LTV lab-LARP parity, LARP focus on juniors • US-CERN meeting (11/13/06): • PJAS status to LTV  to be further investigated • 5-yr plan and new tasks prioritization • DoE mini-Review in Dec’06: • “… it is clear that LARP is developing exceedingly well, and its managers and membership should be congratulated for their outstanding progress and achievements” • FY’07 CR troubles (RHIC Run 7 off/on Mar’07) • FY’07 semi-annual report to DoE (03/25/07) LARP Collaboration Meeting

  3. Accelerator Systems Budget 2304k$ out of 3611k$=64% half-way thru FY07 Instrum 77% Commiss 64% Collimat 54% Physics 48% LARP Collaboration Meeting

  4. This meeting and beyond • At the meeting we are to hear (among all) about financial issues and needs of all the tasks • LARP AS contingency 200k$ - to be distributed after the meeting • Initial planning for FY’08 to take place at the meeting • Input on hard deliverable schedules • LTVAC, L2 tasks • New initiatives • To be finalized after the meeting • “gang of 5+1” • exec committee • DoE Review June 5-6 at FNAL LARP Collaboration Meeting

  5. Instrumentation: Schottky 4 tanks installed at Point 4 of LHC, baked, vacuum tested Electronics shipped to CERN US team at CERN to commission in May LARP Collaboration Meeting

  6. Instrumentation: Tune&Coupling FB Success at RHIC and Tevatron Success at SPS Apr’06 Oct’06 Oct’06: successful Final Design Review of at BNL Now: LHC system test at RHIC, Q’, later – LHC 450 GeV eng run LARP Collaboration Meeting

  7. Instrumentation: Luminosity Monitors Two LUMINOSITY detectors under construction LUMI Prototype to be compared to RHIC ZDC Now: RHIC Run 7 with gold to test of complete system Later: integration at LHC LARP Collaboration Meeting

  8. Collimation: Rotating Collimators Significant design improvement 200mm collimator brazed 200mm Cu mandrel w/ coil after brazing 960 mm Cu mandrel …will hear more progress at the meeting LARP Collaboration Meeting

  9. wires (2.5m long) with strong-back (-profile)7 support points Physics: BBLR wires – ready for RHIC test 2 wires installed in RHIC Yellow and Blue rings Now: wire commissioning and experiments Code benchmarking LARP Collaboration Meeting

  10. Commissioning • 5 hardware commissioners now at CERN • LTVAC identified / qualified LARP members from Accel Systems to spend >~3 mos. at LHC • All labs, incl. CERN, represented • All areas of Accel Sys represented • At the Collab Mtg: • Endorsements plans, remainder of FY07 • Provide recommendations (first pass) for travels in FY08 to L0/L1 • Visit LHC@FNAL (opened in Feb) ! LARP Collaboration Meeting

  11. LHC@FNAL LARP Collaboration Meeting

  12. LARP AS : Focus on Junior Physicists • They are active in all tasks: • Rama Calaga (Toohig Fellow), Mei Bai (Commiss.), Guillaume Robert-Demolaize (Collim. , 1/2 by RHIC), Natalia Prado de Abreu (Physics, 1/2 by RHIC), Yun Luo (Commiss) – at BNL • Ryoichi Miyamoto (AC dipole), Andreas Jansson (Schottky), H.J.Kim (IR), Arden Warner (Commiss) - at Fermilab • Jean-Francois Beche (Lumi) – at Berkeley • We are actively looking for new ones: • Toohig Fellows • 1 Research Associate for Lumi (Wainer Vandelli, Piza) • 1 RA for Rotating Collimator (Javier Resta Lopez) • 2 from SLAC to take part in commissioning LARP Collaboration Meeting

  13. Collaboration/Coordination with CERN • Remarkable progress in 2006: • closer contacts established • “driving forces on both sides” model: • Luminosity monitors: A.RATTI and R.JONES • Schottky detectors: R.PASQUINELLI and F.CASPERS • Tune & Coupling FB: P.CAMERON and R.JONES • AC Dipole: S.KOPP and H.SCHMICKLER • HW Commissioning: M.LAMM and R.BAILEY • Beam Commissioning: M.SYPHERS and M.LAMONT • Collimation: T.MARKIEWICZ & R.ASSMANN LARP Collaboration Meeting

  14. Collaboration with CERN in FY07 • Better coordination of all activities in FY07: • H.Schmickler/AB in LARP LTV Advisory Committee • O.Bruning/AB to be liaison to LARP IR,e-cloud work • J.P.Koutchouk/AT to be liaison to LARP beam-beam compensation projects (long-range & head-on lenses) • More collaborative work: • Even more visible LARP presence at CERN for • Installation and commissioning of LARP instruments • Participation in the next round of SPS studies • 2 more Hardware/IR Commissioners to come • First LARP Beam Commissioners - later in 2007 • Joint eCloud Clearing workshop @CERN (Mar’07) • Joint LHC beam-beam&IR workshop at SLAC, Jun’07 • Org’d by A.Chao & W.Fischer; to review experiments& simulations LARP Collaboration Meeting

  15. FY07 AS Priorities & Goals • Lumi-Monitors: construct, install, start commissioning • Tune&Coupling FB: deliver design, participate in installation and commissioning • Schottky: participate in installation and commissioning • Hardware Commissioning: execute the plan (5-7 people) • Beam Commissioning: develop detailed Long Term Visitors TV plan for FY08+ by ~mid-FY07 • Other tasks: execute Task Sheet’s Plans • “5+1”: develop FY08 plan (incl. new tasks) by ~June’07 Hard Deliverable Hard Deliverable Hard Deliverable LARP Collaboration Meeting

  16. This Meeting • This is “large” meeting to address: • Plan execution, achieved milestones, finances • Expected schedule/cost changes in FY07 • Plans for FY08 and beyond • It is the meeting to report/discuss • Technical achievements, in detail • Difficulties of any kind • Status of collaboration affairs (US labs, CERN) • Very important • Open discussion of new proposals (Thur PM) • Welcome new people joining us • from SLAC • from various Fermilab groups LARP Collaboration Meeting

  17. New Initiatives • Collider Instrumentation • BBQ-based Quadrupole Monitor • Synch light based diagnostics • Physics • LHC Crystal Collimation Scheme • LHC Electron Lenses • Modeling of LLRF Limitations on LHC Performance • LHC Injectors • The Low-Energy Transverse Emittance Project • Super-Ferric Fast Cycling Injector in the SPS Tunnel • LHC injectors Upgrades, space-charge effects LARP Collaboration Meeting

  18. Consideration Process • “Group of 5+1” to meet right after to recommend on support of proposals • General requirements: • Interesting subject, development should push up the state of the accelerator physics and technology in the US • Of interest for LHC • Collaboration of >1 Lab, Universities welcome • Not at expense of current unfinished tasks • Right time and budget scale • Final approval by LARP Executive Committee LARP Collaboration Meeting

  19. Summary: • Remarkable progress since last LARP meeting: • Instrumentation tasks, Hardware commissioning • Rotating collimator design, Beam-beam wires, etc • Greatly improved LARP-CERN communication • Priorities in FY’07: • instrumentation tasks, • commissioning • LTV Advisory Committee started: • focus on junior researchers LARP Collaboration Meeting

  20. Back up slides LARP Collaboration Meeting

  21. AP: New Proposals vs Existing Tasks • Electron cloud (200k$/yr): • very high priority for the LHC, a lot of interest from US projects, now attacking e-p interaction simulations (new territory) • IR Optics and Beam-Beam Simulations (270k$/yr): • Making important contribution to LHC Upgrade work (12 talks in Valencia), plugs US into the LHC Upgrade consideration process as a pratner, develops software tools of particular importance for the LHC and generic importance for US colliders (beam-beam lifetime) • Beam-beam wires (150k$/yr): • Very positive development at CERN (there will be wires, space reserved), effective CERN-LARP collaboration, experiment at RHIC greatly enhances advanced accelerator R&D in the US, little funds after FY’07 LARP Collaboration Meeting

  22. Instrumentation Tasks in FY’07 and FY’08 • Schottky & Luminosity Monitors, Tune Feedback : • Are or will be constructed and installed in FY07 • LARP will support their commissioning (via Commissioning task) in FY’07 and – in larger scale - in FY’08 (including 450 GeV run) • AC Dipole: • Just started, significant design progress expected in FY07  will determine funds needed in FY08 • Being discussed: • Longitudinal Density Monitors, Crab Cavities, ODR monitors • Funds in FY08 will depend on situation with higher priority tasks, e.g., commissioning of existing instruments (TBD after collaboration meeting in April’07) LARP Collaboration Meeting

  23. New Physics Initiatives • Crystal Collimator (~50k$ 1st year): • waiting for Tevatron results with new bent crystal, not much encouragement from CERN, competes with Rotating Collimator for Phase II • Superferric LER or (S)PS (~100k$ 1st yr): • LER is “dead”, Super Ferric (S)PS+ m.b. considered later – depends on CERN plans, no strong inter-Lab team in the US • Hollow electron beam as proton/ion primary collimator (~50-100k$ 1st year): • Some interest at CERN, initial considerations to take place in FY07  technical considerations possible • Electron lens for beam-beam compensation (300 k$ 1st yr, ~600+ k$/yr x 4 yrs): • Preparatory theory work not done, some limited interest at CERN, working collaboration may be formed in FY07 • encouraging TEL results (doubles p-lifetime) • NB: before funding other things, we need complete current commitments (Instruments) as the highest priority LARP Collaboration Meeting

  24. LHC Software at Fermilab (LAFS) • Motivation: make vast Tevatron accelerator controls experience available to the LHC operation team • Goal: to develop a suite of software products to enable Fermilab accelerator physicists to make key contributions to the beam commissioning of the LHC • A modest team (~3-5 FTE’s or 10 people) of computer professionals, operational experts, and accelerator physicists to make a substantial contribution to the LHC • LAFS is part of LHC@FNAL • Head – D.McGinnis – reports to E.Gottschalk • Three groups: • RBA (Role Based Access) – S.Gysin • Sequencer – J.Patrick • SDA – Sequenced Data Acquisition – E.McCrory • Collaborative agreement FNAL/CERN is signed by S.Holmes (last week)  now at CERN • Relationship to LARP : • Complementary: • LARP input via LHC@FNAL Integration Task Force LHC subgroup LARP Collaboration Meeting