ONILE CONTINEOUS EMISSION MONITORING SYSTEM A Presentation by

ONILE CONTINEOUS EMISSION MONITORING SYSTEM A Presentation by JHARKHAND STATE POLLUTION CONTROL BOARD On 25 TH June, 2019. WHY CEMS. As per the 1st Revised Guideline for CEMS, August 2018, CEMS is to Installed at –

allshouse
Download Presentation

ONILE CONTINEOUS EMISSION MONITORING SYSTEM A Presentation by

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ONILE CONTINEOUS EMISSION MONITORING SYSTEM A Presentation by JHARKHAND STATE POLLUTION CONTROL BOARD On 25TH June, 2019

  2. WHY CEMS • As per the 1st Revised Guideline for CEMS, August 2018, CEMS is to Installed at – • All the 17 categories of highly polluting industries along with Bio Medical Waste Incinerators and Hazardous Waste Incinerators. • Installation of online PM10 Analyzer for major air polluting industries including Railway Sidings, Coal/ Iron ore/ Bauxite mines/ Hard Coke units has been made mandatory. http://jspcb.nic.in/upload/5bd05a060aaefUpdated%20list%20of%2017%20Cat.%20of%20highly%20polluting%20Ind.%20and%20calibration%20.pdf

  3. PARAMETER SPECIFIC EMISSION STANDARD: ONLINE Refer : http://jsac.jharkhand.gov.in/pollution/

  4. PARAMETER SPECIFIC EMISSION STANDARD: ONLINE Refer : http://cpcb.nic.in/ocems1/

  5. REASONS FOR DATA UNAVAILABILITY

  6. CAUSES FOR DATA UNAVAILABILITY • Selection of Technology • Correct installation of CEMS (Isokinetic sampling points) • Quality Assurance and control • Calibration Requirement • Data Handling System

  7. ACTION TAKEN BY JSPCB • Minimum 85% shall be transmitted to JSPCB otherwise JSPCB may issue Show Cause notice, requiring immediate feedback on corrective action. • Environmental Compensation shall be implied on the industries by JSPCB if they fail to take stringent actions for the compliance of faulty data/irregularity of data within period of 1 month.

  8. SELECTION OF AN ANALYSER • Based on temperature and moisture content in the stack. • Dew point of sample gas and corrosive gases. • Dust content in stack • Range and maintenance of analyzer

  9. CALIBRATION OF CEMS • The continuous Particulate Matter monitoring system (PM-CEMS) shall be calibrated at different operational loads against isokinetic sampling method at the time of installation. • Calibration shall be done once in 06 months by empaneled laboratories by CPCB using standard reference methods and at a frequency specified. Refer: http://cpcb.nic.in/ocems1/

  10. CALIBRATION OF CEMS • For Gaseous Parameters:- The instruments/ analyzers shall be calibrated with respect to their functioning, drift, linearity detection limit, output, operating temperature and other relevant parameters before installation • The industries shall ensure tamper-proof operation of CEMS devices Refer: http://cpcb.nic.in/ocems1/

  11. WAYS TO DEAL WITH EXCESSES EMISSIONS • Average emission for initial 30 minutes shall not be considered during the plant start-up or batch process. • Values recorded during calibration/ preventive maintenance shall not be considered for Exceedance. • Incase of Exceedance value, SPCB may issue Show Cause notice, requiring immediate feedback on corrective action.

  12. WAYS TO DEAL WITH EXCESSES EMISSIONS • If, the emission quality continuously exceeds the prescribed norms by 10% of standard and for duration of 1 hour then • Industry shall immediately inform the SPCB about the control measures initiated by them. • Incase of failure, closer of its operation.

  13. CEMS DATA FOR REGULATORY ACTIONS • Data performance : How much data received at server • Performance: How much and for how long the value exceeded • Generation of Performance Report & Identify the defaulters • Action Framework: Action taken as per Guidelines

  14. ACTION FRAMEWORK BY JSPCB

  15. How could CEMS be made effective? DATA GENERATION Industry sends well-calibrated data, with high uptime DATA APPLICATION ROs take measures on industries as per protocol using CEMS Data. DATA ANALYSIS Data quality checked Summarized to ROs in an actionable manner - High instantaneous emissions - Clear weekly summaries