1 / 6

IMSS Meeting

IMSS Meeting. IETF-60 August 2, 2004 Elizabeth Rodriguez, Chair. Agenda. IMSS Meeting: Monday, August 2nd, 7:30-8:30 7:30 Administrativa 7:40 Fibre Channel Fabric Address Manager MIB Formerly Fibre Channel Domain Manager MIB)

analisar
Download Presentation

IMSS Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMSS Meeting IETF-60 August 2, 2004 Elizabeth Rodriguez, Chair

  2. Agenda • IMSS Meeting: Monday, August 2nd, 7:30-8:30 • 7:30 Administrativa • 7:40 Fibre Channel Fabric Address Manager MIB • Formerly Fibre Channel Domain Manager MIB) • http://www.ietf.org/internet-drafts/draft-desanti-fc-domain-manager-02.txt • 7:50 Fibre Channel Name Server MIB • http://www.ietf.org/internet-drafts/draft-desanti-fc-name-server-02.txt • 8:00 Open Mike • 8:25 meeting complete

  3. Note Well • Any submission to the IETF intended by the Contributor for publication as all or part of an IETF Internet-Draft or RFC and any statement made within the context of an IETF activity is considered an "IETF Contribution". Such statements include oral statements in IETF sessions, as well as written and electronic communications made at any time or place, which are addressed to:-the IETF plenary session,-any IETF working group or portion thereof,-the IESG or any member thereof on behalf of the IESG,-the IAB or any member thereof on behalf of the IAB,-any IETF mailing list, including the IETF list itself, any working group or design team list, or any other list functioning under IETF auspices,-the RFC Editor or the Internet-Drafts functionAll IETF Contributions are subject to the rules of RFC 3667 and RFC 3668. Statements made outside of an IETF session, mailing list or other function, that are clearly not intended to be input to an IETF activity, group or function, are not IETF Contributions in the context of this notice. • Please consult RFC 3667 for details.

  4. IMSS and T11 • Fibre Channel standards are developed and maintained by INCITS T11 Technical Committee. • T11 does not have the expertise to develop MIBs. • Since the MIBs are for FC, this group is working closely with T11 to insure that they are technically (FC) correct, while following the guidelines set forth by the IETF for MIBs.

  5. IMSS and T11: Cooperative Strategy • Coordinate activities between IMSS and T11.5 • Ensure timeliness to other work. • Follow latest IETF directions and take advantage of IETF expertise. • T11.5 has approved a process for this. • T11 starts an internal project, complete with letter ballot, for each MIB targeted for this WG. • The drafts posted as individual submissions to IETF. • Once T11.5 is in agreement that the draft is technically accurate, control transferred to IMSS WG • The document becomes an official WG draft

  6. IMSS Milestones • Goals and Milestones: • Done Submit IPv6 over Fibre Channel draft to IESG for consideration as Proposed Standard RFC 3831 • Aug 04   Work with T11.5 to determine what additional MIB modules are needed Storage Management Routing Information MIB (SM-RTM) • Oct 04   Submit Fibre Channel Domain Manager MIB to IESG for consideration as Proposed Standard Renamed Fibre Channel Fabric Address Manager MIB Will be voted on this week by T11. • Oct 04   Submit Fibre Channel Name Server MIB to IESG for consideration as Proposed Standard Undergoing comment resolution. Should be voted on by next IETF mtg • Jan 05   Submit Extensions for Fibre Channel Interfaces MIB to IESG for consideration as Proposed Standard On Hold • Jan 05   Review working group charter and determine what additional work, if any, should be undertaken by working group

More Related