1 / 45

Contribution a l’upgrade de D Æ: declenchement EM et applications Arnaud Lucotte

Contribution a l’upgrade de D Æ: declenchement EM et applications Arnaud Lucotte CERN, division PPE.

aqua
Download Presentation

Contribution a l’upgrade de D Æ: declenchement EM et applications Arnaud Lucotte

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contribution a l’upgrade de DÆ: declenchement EM et applications Arnaud Lucotte CERN, division PPE 1. Introduction: Motivations & upgrade pour le Run II2. Detecteurs a pied de gerbe (preshower) Chaine de lecture et declenchement Tests faisceaux 3.Le systeme de declenchement EM Architecture et Contraintes Declenchement e/ de haut/bas pT , J/ e-e+4. Application au Run IIDetection des B  J/ (ee) KS Faisabilite du h  WW*  e jet jet

  2. L’upgrade du TeVatron Fermilab DÆ Booster TeVatron Main Injector • Installation du Main Injector (M.I): • Synchrotron / accelerateur 120-150 GeV • Installation du recycleur (M.I): • Refroidissement / stockage / recyclage des anti-protons •  re-injection d’anti-protons disponibles pour collisions (x 2)

  3. Physique de haut pT au Run II • Quark Top: • (pptt+X)  8.0 pb (Mt=170 GeV) +40% / Run I •  DMt3.0 GeV/c2 , Dsttb/sttb~ 8% ... • Bosons W Z, WW  Z: •  DMW ~40 MeV/ c2 , DGW ~30 MeV/ c2, Sin2W~0.001 • Recherche SUSY /Higgs: • qq  +102 ( 01W 01Z) lll ... • pp  Wh  l bb, pp  Zh  llbb, bb • pp  h(W/Z)  WW(W/Z)  ll (l/ll) ...

  4. L’experience DÆ Muons Torroid Calorimetres Det. a traces Tube a Vide

  5. Scintillateurs Arrieres + Nouvelle Electronique, Trig, DAQ Scintillateur Central Solenoide, Detecteur de Traces Silicon Vertex, Preshowers Fibres Sci. Chambres a derive (Mini-drift) Arrieres Boucliers L’upgrade du detecteur DÆ

  6. Upgrade des Muons PDTs Scintillateur Central (declenchement) A-f Scintillateurs Ar. (Pixels) Boucliers Chambres a derive (MDTs) Arrieres Scintillateur B/C

  7. Detecteurs de Traces / Preshowers • o Detecteur de Vertex (micro-pistes Si) • 6 tonneaux de 4 couches (double/simple face) • 12+4 disques (double-face)  ||3 • 792000 canaux • vertex secondaire: svertex  40 mm (r-f) , 100 mm (r-z) • o Detecteur de traces a Fibres scintillantes • 8 super-couches de doublets de fibres scint. (x,u,v) • 74000 fibres 125 cm h=1.6 o Preshowers: Central ||<1.6 strips / fibres sc. 3840 canaux Arriere 1.5<||<2.5 strips / fibres sc. 16000 cannaux o Solenoide: 2 T h=3

  8. Detecteur de Vertex Detecteur Micro-strip (Si):~792000 cannaux 12 Disques F 6 Barrels 387k canaux sur 4-couches double-face barrel (stereo) 4 disques H 405k canaux sur disques (double face stereo) et disques a grand-z

  9. Detecteur de Vertex • Structure: detecteur a micro-pistes Si • i - Barrels: 6 modules, 4 couches: • - Double Face: couches 1,3 (90o stereo) • couches 2,4 (2o stereo) • - Simple Face: couches 1,3 (modules exterieurs) • ii - Disques Centraux: 12 (2.5 < r < 10 cm) • - 12 wedges double-faces / disque • - pitch 50 & 62.5 mm, ±15.0o stereo • iii- Disques Arrieres : 4 (9.5<r< 20 cm, z=94,126cm) • - 384 single-sided detectors for 4 disks, • - picth 40 mm, ±7.5o stereo

  10. Module FPS+connecteur WLS

  11. Extrusion des scintillateurs

  12. Traking et Preshower • Performance Goals for (Vertex + Tracker+PS): • i - Momentum resolution: • dPT/PT2 = 0.002 (Silicon+Fiber tracker) • ii- High tracking efficiency 95% • -Track reconstruction high |h| < 3 (disks) • iii- Vertex Reconstruction • - primary vertex: svertex = 15-30 mm (r-f) for tt / bb • - secondary vertex: svertex = 40 mm (r-f) , 100 mm (r-z) • iv- Electron/g ID: • - charge signs, Preshower/ Track/CAL at Trigger Level • - off-line particle ID

  13. Upgrade des “Proportional Drift Tubes” (PDT): Garde PDT’s existantes pour |h| < 1 Utilisation de gas (Ar+CH4+CF4) + rapide tps derive: 750ns to 450ns, ie: ~4 crossings a 132ns Remplace electronique Front End operation sans temps mort Scintillateurs a Cosmic Extension couverture sous detecteur Fournit: - declenchement L1 / ID en dehors du toroid, - etiquetage en temps pour muons dans PDT’s Scintillateurs A-F Barrel Compteurs a scintillation - segmentation Dh x Df = 0.2 x 4.5 Fournit: - declenchement L1 - ID avant le toroid (muons de faible pT) - etiquetage en temps - coincidence avec traces (L1, L2) Systeme Muon Central

  14. Systeme Muon Arriere • Forward Tracking (1< |h| < 2): • Remplacement des PDT’s • 3 couches de MDT’s de haute granularite • Utilisation de Gas (CF4+CH4) • ~reduit tps de derive a 40-60 ns • Scintillateurs Arrieres (1< |h| < 2): • 3 Scintillateurs pixel layers (Dh x Df = 0.1 x 4.5o) • Fournit: • etiquetage en temps , match vs traces, ID/declench. L1 • Boucliers autours du tube a vide • Rejette fonds (declenchement)

  15. Compteurs A-f a scintillation

  16. Systeme Muon Central • (a) Compteur “Cosmic Cap” • (b) Compteur “Bottom” (b) (a)

  17. Systeme Muon Arriere • Compteur a Scintillation (pixel) (Couche A)

  18. Systeme Muon Arriere • Mini-Drift Tubes (MDT’s) Assembled MDT Octant

  19. Physique de bas pT au Run II • Physique du B: • sbbar 50 mb (10kHz@1032cm2s-1) avec bb 1/1000 ppb • Violation CP dans le systeme Bd0 : • Oscillations du BS: • Bs0 DS  (DS  )  2000 evts attendus • (~70 fs resolution en temps) • Autres sujets: • Desintegration rares B   • Spectroscopie BC • Baryons b • Selection du J/ : • Mesures de • d/dpTd(ppJ/ • Calibration: • Calorimetre / faible E • (J/,  e-e+)

  20. Impact sur le detecteur DÆ • Adaptation au collisioneur: • Reduction de la duree entre paquets a 396/132 ns: • DAQ: traitements paralleles, pipelines electroniques • Haute luminosite: • Gamme d’acceptance plus elevee (niveaux 1, 2) • Detecteurs resistant aux radiations (det. traces) • Accroissement des capacites du detecteur: • Nouveaux detecteurs traces / champ central (2T): • reconstruction vertex, etiquetage B, traces bas pT • Nouveaux detecteurs pied de gerbe (preshower): • ID electron/photon, declenchement • Amelioration detecteurs a muon: • ID muon, bas pT, declenchement, temps (cosmiques) • Refonte du systeme de declenchement: • Gamme d’acceptance plus large (L1 = 10 kHz) • Inclusion des nouveaux detecteurs & combinaison

  21. Preshower Central (||<1.2 ) • Structure: • Pre-radiateur 2X0 (solenoid + Pb) • 3 couches pistes triangulaires / fibres scint.: • 1 axiale (x) + 2 stereo 20o (u,v) = 1280 x 3 canaux • Objectifs: • Resolution de l’energie du calorimetre • Declenchement & ID particules: • Position : resolution e/ de ~1mm / 500m • ID : etiquetage electron avec PS+trace • L1 & L2 : reduction fonds par facteur 3-5 Front End: PS+traces 4.5o

  22. Preshower Avant (1.5<||< 2.5 ) • Structure: • Couverture : 1.5<|h| < 2.5 • 4 couches de strips triangulaires / fibres scint.: • 4 x stereo 22.5o (u,v) = 14878 canaux • 2 couches(u,v)  Radiateur 2X0 (Pb)  2 couches(u,v) X 16 X 16

  23. Preshower Avant (1.5<||< 2.5 ) • Objectifs: • Particule ID e / p / g (niveau 3 et “off-line”) • fonds dus a: •  avec conversion, hadrons+- et  electron photon • Declenchement • L1 & L2 : reduction fonds par facteur 2-10 •  Position & Energie • Resolution e/ de ~1mm / 500m • Mesure d’energie a 15% suffisante

  24. Lecture des Preshowers • Fibres scintillantes • Fibres (emission vert) •  Resistant Radiation • 10 ans @ 2 1032 •  10m guide-fibres WLS • -> photodetecteur • Amplification du signal: • Photoconverteur(VLPC) • fonctionne a T = 6-13K • - Conversion e • ( ~ 15 p.e / couche / mip ) • - Amplification: 30-40 K • DAQ & Declenchement • Chips digitaux (0/1) •  declenchement rapide •  niveau-1 • Chips analogues (SVXII) •  analogue (energie) •  niveau-2/3 & “offline” VLPC

  25. DAQ / Declenchement des PS • Lecture du signal fibre: • Besoin de deux seuils haut & bas •  calibration, trace: detection MIP (1 MIP  0.9 MeV) •  reconstruction de gerbes (e) de 5 a 60 MIPs • Declenchements et lecture: •  L1: chips SIFT [0/1]  carte trigger (FPGA) •  L2: chips SVX-II [analogue] pre-processeurs Scintillateur SIGNAL GERBE [5-160]fC [0-150]fC Fibres WLS SIFT SVX 0.09 Q Q VLPC SIGNAL MIP SVX SIFT 0.27 Q SIGNAL TRIGGER Logique Trigger (FPGA’ s)

  26. Faisceau test du Preshower • Objectifs: • Test de l’electronique d’acquisition (SVX-II) • Caracterisation des particules e / p • Calibration du detecteur (pe’s / MIP) • Banc d’essai: • faisceaux pions, electrons (50, 70 GeV) • 4 modules testes, chips SVX-II, VLPC +Cryogenie

  27. Faisceau test: Resultats • Electrons: forme de gerbe EM versus MC: • Calib: 1 mip = 143 p.e. EFPS vs EVraie

  28. Declenchement EM a DÆ • Architecture et contraintes • (Re)-definition du niveau 1 (CAL / PS) • Niveau 1 • Niveau 2 • Declenchement EM • Objets de bas pT • Algorithmes de detection de J/ e+e- • Efficacite et taux declenchements • Prospectives Run II: • Selection de B0d  J/(e+e-)Ks • Etude de faisabilite: h WW*  e jet jet

  29. L1CAL Architecture & Contraintes Detecteur Declen. L1 Declench. L2 (4.2s) (100 s) 1 kHz 8 kHz 7 MHz L2Cal CAL FPS CPS L2PS Global L2 L1FT L2CFT CFT L2STT SMT L2 Muon L1 Muon Muon L2FW:Combine objets (e, m, j) L1FW: tours CAL, traces, Muon INITIALEMENT...

  30. L1CAL Architecture & Contraintes Detecteur Declen. L1 Declench. L2 (4.2s) (100 s) 1 kHz 8 kHz 7 MHz L2Cal CAL L1PS / L1FT FPS CPS L2PS Global L2 L2CFT CFT L2STT SMT L2 Muon L1 Muon Muon L2FW:Combine objets (e, m, j) • L1FW: tours CAL, traces, Muon • 128 combinaisons (ORs) possibles • Calorimetre vs Preshower + traces • Calorimetre vs Traces

  31. Declenchement EM central L1 • Detecteurs specifiques: • Calorimetre EM • #tours EM (= 0.20.2) ET > [2.5, 5, 7, 10] GeV • PreShower Central • #gerbes =  strips adjacents  Estrip > 2-5 MIPs • Tracker Central a Fibres • #trajectoires signees / bin pT [1.5-3], [3-5],[5-10], • [10-] GeV/c (couche 8 comme reference) • Declenchement global: • Coincidence par Quadrant: •  1 tour EM + ( 1 gerbe CPS + 1 Trajectoire pT ) L1CAL L1PS L1CFT L1FW

  32. Declenchement EM central L2 • Calorimetre EM •  tours calorimetrique “seed” = L1 •  energie EM totale du depot: • ETEM = ETSEED + ET2nd_max •  fraction EM du depot: • EMF = ETEM/(ETEM+ETHAD) •  isolation du depot: • TISO = ETEM/(ETEM +ETHAD) (33  incluant “seed”) • Preshower L2PS: •  gerbe 3D (u,v,x)  (, ,z) etiquetee e • Det. de Traces •  convertit L1 pT trace pT • (Look Up Table) •  extrapole trace  a EM(3) • Det. de Vertex •  combine traces CFT •  re-ajustement : • pT, , par. impact L2CAL L2PS L2CFT L2CTT

  33. Declenchement EM Avant/Arriere • Calorimetre EM • tours EM (= 0.20.2) ET >[2.5, 5, 7, 10] GeV • PreShower Avant • gerbes =  strips adjacents -Estrip 5-10 MIPs • electron = gerbe PS (u ou v) + MIP (u ou v) • Declenchement global • Coincidence par Quadrant •  1 tour EM + 1 electron (u et v) FPS L1CAL L1PS Pb Electron dans FPS L1FW

  34. Declenchement EM Avant/Arriere • Occupation dans le Preshower: • Interactions / crois. • <#> = 2.1 (Poisson) • @ 2. 1032 cm2s-1 • detection mip: • T>0.3 MIP • occ = 7-10% • detection gerbe: • T > 5 MIPs • occ = 0.5-2.0% Dijet+6mbias

  35. Declenchement Avant • Efficacite: • Taux de fond (QCD dijets): • Rejection pions ( 0  ) • 20-25% de conversions de 0 ‘s avant PS (avant/arr.) • PS+CAL: facteur 2-4 (eleve pour faibles pT ) • Selection des fonds: • ET 10 GeV: 700~Hz (CAL) a 200 Hz (CAL+PS)

  36. Exemples: resultats L1 • Taux d’evenements (2.1032 cm2 s-1) •  128 termes L1 possibles (combinaisons OR / AND ) •  Terme calorimetrique: • terme CEM(#,ET,C=central,N/S=Nord/Sud) •  Match trace / PS : • terme TEL(# electron, pT) •  Match par quadrant: • terme TNQ (neutre) • terme FQN (charge) • Terme declenchement Taux (Hz) Physique • CEM(1,10,C) 200 W, QCD  • CEM(1,7,C)CEQ(1)TNQ(1) 62 QCD  • CEM(1,10,C)TEL(1,5) 3 W, WZ  • CEM(1,10,N/S) 690 W Av/Ar • CEM(1,10,N/S)FQN(1) 400 EM Av/Ar • CEM(1,10,N/S)FPQ(1) 200 W masse Av/Ar

  37. Declenchement J/e-e+ • Caracteristiques du signal: • B  J/Y X : < pT(J/Y) >  0.7 < pTB > avec < pTB > ~ MB • C J/ Y: < pT(J/Y) >  1.5 GeV/c •  Seuil calorimetre tres bas: ET 3.0 GeV • Contraintes de declenchement • Fond Dijet: ~7 MHz @ 1032cm2s-1 •  Tolerance: ~1 kHz au niveau ,~100Hz niveau 2 •  Necessite: • L1: Combinaison Trace + Preshower + Calorimetre •  coincidence CAL/PS par Quadrant • L2: Reconstruction de (h,f), Masses Inv....

  38. Declenchement J/e-e+ (L1) • Efficacite: •  centrale  25-30% •  av/arrie  5-10% •  depend de seuil CAL • ETCAL 2.75-3.0 GeV • Fond dijets: •  Taux: 200-1000 Hz •  controle par • matching /quadrant • seuils EFPS , & ETCAL

  39. Declenchement J/e-e+ (L2) • Efficacite: •  centrale  20-25% •  avant/arriere  4- 8% •  depend de seuil L1 CAL ET • Fonds di-jets: •  Taux: 50-100 Hz: region centrale - avant/arriere •  reduit par Fenetre en Masse • EM isolation • Coincidence TT vs PS •  reductible: utilisation vertex (applique a J/m-m+ ) • 2traces / haut parametre d’impact SB = B/sB

  40. CP violation with B0d-> J/Y KS • Projection pour sin2 (temps integre) • - efficacite reco des traces: 95% • - Dmix 0.47 , Dfond = S(S+B) ~ 0.7 • - eTag D2tag ~ 0.05 •  sin2  13.40  NRECO • Contraintes indirectes: • Sin2=0.75 0.09 • CERN-EP/98-133

  41. Recherche du Higgs • Higgs de masse intermediaire: • Higgs de mH = [140, 180] GeV/c2 • BR(h  W*W*) ~ dominant • Etude de Faisabilite: • pp  gg  h  W*W*  l jet jet •  signal 80 fb (mH = 160 GeV/c2) • Principaux Fonds (physiques): • Wg  l jet jet ~ signal x 25000 ! • WW l jet jet ~ signal x 13 • ttb  bb l jet jet ~ signal x 5

  42. Recherche du Higgs • Analyse: •  preselection • rejette ttb, W+jet •  vraisemblance L • Resultats: •  exclusion a 95% CL • L = 35 fb-1exp. ! •  en combinaison avec • canaux tri-(di-) leptons

  43. Conclusion • Participation a l’upgrade de D0 • Test faisceau du detecteur pied de gerbe FPS: • software / prises de donnees • analyse donnees: gerbe e-, calibration… • Declenchement EM: • simulation L1 pour haut pt e/ (FPS) • simulation L1/L2 pour J/  ee (FPS) • code hardware L1 FPS (FPGA, Altera) • simulation C++ L1FPS, L1CPS haut/bas pt • synthese/maintien liste des declenchements L1 et L2 • Preparation pour le Run II • Selection des evenements Bd  J/(ee) KS • Detection des J/(ee), Bd  J/(ee) Ks(+-) • Observabilite de la violation CP • Recherche du Higgs standard • membre du ”Higgs Working Group” au TeVatron • canal d’etude h  WW* l jet jet

  44. preliminary 68% CL contours Constraining M(Higgs) • mt and mH affect the SM prediction for mW via radiative corrections • measure mW and mt constrain mH • for dmW = 40 MeV and dmt = 2.5 GeV constrain mH to 80% precision • SM predictions for mW • Degrassi etal, PL B418, 209 (1998) • Degrassi, Gambino, Sirlin, PL B394, 188 (1997)

  45. Conclusions

More Related