1 / 22

Trinity College Universal Design Issues Access

This slide presentation evaluates various permanent and interim solutions for enhancing accessibility to historic buildings at Trinity College. The presentation discusses issues related to cobble reduction, access ramps, entrance modifications, and other accessibility improvements.

arosser
Download Presentation

Trinity College Universal Design Issues Access

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trinity College Universal Design IssuesAccess Cobble Reduction Access to Historic (Protected) Buildings Director of Buildings' Office

  2. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:21 Slide number: 2 Number of objects: 3 Sizes: Slide total: 980.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesAccess Hide Erase Director of Buildings' Office

  3. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:53:50 Slide number: 3 Number of objects: 7 Sizes: Slide total: 2.1 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 10.0 KB Trinity College Universal Design IssuesTemporary/immediate solutions Hide Erase House 39 – Law School Anatomy Building Director of Buildings' Office

  4. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:04 Slide number: 4 Number of objects: 6 Sizes: Slide total: 941.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase Front Square Houses New access ramps Director of Buildings' Office

  5. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:25 Slide number: 5 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - Historic Buildings Hide Erase House 27 Entrance to Catex Director of Buildings' Office

  6. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:54:44 Slide number: 6 Number of objects: 7 Sizes: Slide total: 1.7 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase The Old Library The GMB (Sounder/beacon retrofitted) Director of Buildings' Office

  7. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:04 Slide number: 7 Number of objects: 5 Sizes: Slide total: 1.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions Historic Buildings Hide Erase Cobble Reduction Director of Buildings' Office

  8. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:30 Slide number: 8 Number of objects: 7 Sizes: Slide total: 1.9 MB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - New Buildings Hide Erase SNIAMS (automatic doors) East End 4/5 Director of Buildings' Office

  9. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:55:58 Slide number: 9 Number of objects: 8 Sizes: Slide total: 1.6 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - New Buildings Hide Erase Berkeley Podium (ramp) Ussher Podium (platform lift) Sounder/beacon retrofitted) Director of Buildings' Office

  10. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:16 Slide number: 10 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions - Existing Buildings Hide Erase Lecky Library (Arts Building) Director of Buildings' Office

  11. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:33 Slide number: 11 Number of objects: 7 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions- New Buildings Hide Erase Ussher/Berkeley Library (ramp and lift) Director of Buildings' Office

  12. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:56:46 Slide number: 12 Number of objects: 8 Sizes: Slide total: 1015.0 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesGeneral Facilities Hide Erase UA Toilet Desiginated Parking Bay Director of Buildings' Office

  13. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:03 Slide number: 13 Number of objects: 6 Sizes: Slide total: 2.2 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPermanent solutions- New Buildings Hide Erase Ussher/Berkeley Library (ramp and lift) Director of Buildings' Office

  14. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:34 Slide number: 14 Number of objects: 7 Sizes: Slide total: 2.0 MB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesInterim solutions Hide Erase Portable Ramp Director of Buildings' Office

  15. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:38 Slide number: 15 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesGeneral Requirements • Mobility: ease of access for all • Hearing: Induction loops, strobe alarms • Vision: Tactile clues, lighting, audible alarms Hide Erase Director of Buildings' Office

  16. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:41 Slide number: 16 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Lecture Halls • Accessible for all new buildings • Note: Access to lecture theatres in old buildings to be considered. Hide Erase Director of Buildings' Office

  17. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:44 Slide number: 17 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Goldsmith Hall Residences • All units accessible by lift • All units ‘visitable’ and adaptable when required. • Specifically designed bathrooms available. Hide Erase Director of Buildings' Office

  18. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:47 Slide number: 18 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCompleted Projects – Botany Bay Residences Refurbishment Provision of 9 no places in 3 no. units • Each unit is fully adapted to suit Universal Design requirements • Including specifically designed kitchens and bathrooms • In addition facilities can be provided for both the visually impaired and deaf persons in the remaining units. Hide Erase Director of Buildings' Office

  19. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:49 Slide number: 19 Number of objects: 4 Sizes: Slide total: 106.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesCurrent Programs/Projects - Trinity Hall Residences Each of the three new buildings is fully accessible All apartments are'visitable‘ • 45 of 938 bed spaces are enabled bed spaces with specially designed toilet/showerfacilities with 'nurse call' system centrally monitored and enabled kitchenfacilities. • Each apartment has an 1800 turning circle for wheelchair access. • All switches, door furniture etc are universally accessible-visibility socket switches fitted • Specifically designated parking bays • Provision of facilities for both the visually impaired and deaf occupants. Hide Erase Director of Buildings' Office

  20. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:52 Slide number: 20 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPriority List 1 • GMB: internal lift • The Pavilion Bar: platform lift. • East Theatre: automate entrance door. • Arts Building (Faculty Area): automate doors/platform lift • Chemistry Building: improve access to Large Lecture Theatre. • Physiology/Zoology Building: Access provision. • The Boathouse: provision of UA toilets • Santry Pavilion: provision of UA toilets/changing room Hide Erase Director of Buildings' Office

  21. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:55 Slide number: 21 Number of objects: 4 Sizes: Slide total: 105.0 KB Background: 512 Bytes Notes Page: 0 Bytes Master: 53.5 KB Trinity College Universal Design IssuesPriority List - General • Induction Loop System • Deaf alerter – Fire Alarms. • Cobble reduction. • Improve external/internal circulation routes • Visual/tactile provisions. Hide Erase Director of Buildings' Office

  22. Slide Data Sheet Evaluated: Date: 05/26/2008 Time: 02:57:57 Slide number: 22 Number of objects: 4 Sizes: Slide total: 105.5 KB Background: 512 Bytes Notes Page: 512 Bytes Master: 53.5 KB Trinity College Universal Design IssuesFor Consideration • Front Square: Access provision/automate doors • Provost’s House: Access provision. • New Square: Access provision/automate doors • East End: Improve access to existing buildings. • Islandbridge: improve access/lift installation/UD facilities. • Santry Pavilion: improve access/lift installation/UD facilities. Hide Erase Director of Buildings' Office

More Related