An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A virtual tour of the CASLab facility Today’s guide : Stéphane Bauguitte

  2. Platform (NW view)

  3. Three ISO containers General Layout

  4. Fire and gas alarm beacons 240 Vac N view

  5. SW view

  6. Access to gas stores and roof NW view Flammables Non-flammables

  7. SE view External gas cylinders storage A/C exhaust Gland Plates 240 Vac WC exhaust

  8. DOAS room gland plates Roof (N view)

  9. Aerosol inlets (SW corner) Low vol isokinetic Cascade impactor (roof mounted) High vol

  10. Gas sampling inlet (SE corner)

  11. Overhead power points (also for LAN, not shown) Gland plates Comp gases Main Lab (S) Main gas Sampling pipe A/C LAN rack A/C control panel Transfo

  12. Gland plates Compressed gases Main Lab (SE) Main gas Sampling pipe A/C

  13. Gland plates Main Lab (E) Compressed gases WC

  14. Gland plates (for LAN and power cables) Main Lab (SW) A/C Laminar Flow Bench (for aerosol filters prep) LAN rack Transfo Fans and compressor

  15. Gas Detectors (O2, flammables, CO, NO) Fire and gas alarm beacons Main Lab (NW) Manual on/off isolation valves A/C Lobby

  16. DOAS Lab (N)

  17. DOAS Lab (E) Removable window for telescope

  18. Compressed gases distribution (1)

  19. Compressed gases distribution (2) E User manifold N

  20. Compressed gases distribution (3) Gas lines to main lab area via gland plates. Also shown gas detectors and safety solenoid valves (regulators not installed) Cylinders racking in non-flammables store

  21. Gland Plates #G1, 2 & 3 (W wall) #G4 & 5 (E wall) #G5 & 6 (S wall) #AP1 & 2 (roof, for DOAS) Can be used for passing inlet lines, power/signal cables and umbilicals

  22. Rack Mounted Instrumentation To free up bench space... Limited by ceiling height 1600 high 1800 high

  23. Thank for your attention, I hope you enjoyed the tour.This tour will be made available by email. Pictures shown here are available in a folder, together with large scale layouts in the poster area. A video tour will be shown at lunchtime.