OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope

OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope. November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair. Agenda for Face-to-Face Meetings. OpenADE Introduction, Review (optional) NAESB Energy Services Provider Interface (ESPI) Introduction

atira
Download Presentation

OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OpenADE:OpenADE, ESPI, OpenADE 2.0 Scope November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair

  2. Agenda for Face-to-Face Meetings • OpenADE Introduction, Review (optional) • NAESB Energy Services Provider Interface (ESPI) Introduction • OpenADE 2.0: Scope, Business and User Requirements • OpenADE Roadmap (four months / twelve months) • OpenADE / ESPI Interoperability and Conformance Testing Authority (ITCA) • Sample implementation of ESPI

  3. Goals for this (Tuesday PM2) Meeting • OpenADE Introduction, Review (optional) • NAESB Energy Services Provider Interface (ESPI) Introduction • OpenADE 2.0: Scope, Business and User Requirements • ESPI deep dive?

  4. OpenADE Roadmap Potential Roadmap Elements Include: • OpenADE 2.0 Requirements • Use Cases • Business Requirements • System Requirements • Initial Service Definition • Testing and Conformance • Versus OpenADE? Versus ESPI? • Sample Implementation of ESPI Standard • Others? • Alignment with other groups, harmonization, etc.

  5. OpenADE 2011 Roadmap (Proposed) • Q1 2011 • Initiate Sample Implementation Project • Formation of Testing Authority / Alliance Entity • Q2 2011 • NAESB: Finalize ESPI specifications, ballot, resolution • Approval of NAESB ESPI 1.0 • Q3 2011 • Certification of first candidate implementation • Begin OpenADE 2.0 Requirements • Q4 2011 • Complete OpenADE 2.0 Requirements • Q1 2012 • NAESB: ESPI 2.0?

  6. OpenADE 2.0 Scope • Existing Proposed Elements • Pricing • Messaging • Additional Elements? • Load Control • Meter Event Data • HAN Device Interaction • Delivery of ADE content directly to consumers