JTAMS PRE-CDR ANALYSIS

PRACTICUM 2. PM JTAMS / PM JUGGERNAUT. TEAM # ____. JTAMS PRE-CDR ANALYSIS. Each team will develop the assigned practicum solution slide package using the templated slides provided. See the situation and artifacts document and additional information in the Job Aids folder as appropriate.

barna
Download Presentation

JTAMS PRE-CDR ANALYSIS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRACTICUM 2 PM JTAMS / PM JUGGERNAUT TEAM # ____ JTAMS PRE-CDR ANALYSIS • Each team will develop the assigned practicum solution slide package using the templated slides provided. See the situation and artifacts document and additional information in the Job Aids folder as appropriate. • All slides will be submitted to the instructors electronically (Blackboard and Shared Drive) and hard copy (printed 2 slides per page and double sided) • NOTE: See the last slide (slide 14) for information to assist you in preparing your slides. 19 October FY 3 • PRACTICUM 2

  2. JTAMS PDSS Risk Assessment • Conduct a Risk Assessment of the JTAMS software development effort. • Identify three(3) Post Deployment Software Support (PDSS) risks. (NOTE: Identify one for PAMS, one for OBD, and one for Juggernaut) • Risk Statement #1 (PAMS): • Risk Statement #2 (OBD): • Risk Statement #3 (Juggernaut): Risk Analysis Overview for Risk #1 (PAMS) • Risk Mitigation Strategy for Risk 1 (PAMS): I Initial F S P C Final Adjust Risk Matrix Expectation consistent with Mitigation Planning REFERENCES: P2 Situation and Risk lesson

  3. PAMS Risk Burn Down Plan Calendar Months HIGH 1 2 MED-HIGH 3 4 LOW Place actions on Burn Down Chart consistent with Mitigation Planning Cost and schedule implications LOW-MED n TIME NOW P2 Situation and Risk lesson

  4. Program Protection Plan Analysis • Identify the key players in the development and sustainment of the PPP: • What is the final assessment regarding CPI and CF? • CPI • CF PPP documents (2); Artifact (pp 4-7); Cybersecurity lesson

  5. Award Fee Criteria Analysis (JTAMS) Award Fee Weights For Period 2 (16 Nov FY3 After PDR) 6.1 Risk Management = Why? 6.2 Configuration Management = Why?) 6.3 Interface Control = Why? 6.4 Formal Inspections = Why? 6.5? = Why? Award Fee Weights For Period 1 (25 Jun FY2 After SRR) 6.1 Risk Management = .4 Why? Because this must be done up front 6.2 Configuration Management = .2 Why? Because this must be done up front 6.3 Interface Control = .1 Why? We don’t lock in until PDR so not as relevant now 6.4 Formal Inspections = 0 Why? We have nothing to inspect at this time 6.5 End-to-End Requirements Traceability = .3 Why? Controlling Requirements is Key to a Successful Program and has a HUGE impact on overall quality! Note: for Section H.6.5, identify an Award Fee Area based on Government Software Quality Goals situation/Artifacts (pp 13-14) and Job Aids (contract)

  6. Real-time Engine Data Rights Analysis • Which option is the best from a Government perspective and why? • Which option is best from Juggernaut’s perspective and why? • Which option is your recommended option and why? JTAMS contract; Artifact (pp 13-14) and Situation; Contracting

  7. JTAMS Quality ASSESSMENT • Provide an assessment given the key indicators Worksheet #1 Practicum 2 JRATS_JTAMS Measures; Situation; Measures, Design, Quality lessons

  8. JTAMS Quality ASSESSMENT • Summarize your analysis Worksheet #2 Practicum 2 JRATS_JTAMS Measures; Situation; Measures, Design, Quality lessons

  9. Agile Measures Analysis • explain what happened w/ respect to Release 4 • identify the work completed, work in progress and the work remaining on 02/01/03. Work Remaining Explanation Work Complete In-Progress See Job Aids\AMRU Release 4 Status Report

  10. Key Software-Related Questions for CDR Management metrics relevant to life cycle phase: (Latest Cost Estimate)

  11. Software Development Planning • Explain AMRU’s expected benefits or rationale for using Agile development: • What concerns does the V-Robotics have concerning their subcontractor AMRU? • Assess AMRU’s Agile development approach and determine which aspects are in keeping with a lean approach. Recommend areas where AMRU might benefit from using additional Lean concepts.

  12. Summary – Are We Ready for CDR? • Completion of the CDR should provide the following: • (1) An established system initial product baseline • Status: • (2) An updated risk assessment for EMD • Status: • (3) An updated CARD (or CARD-like document) based on the system product baseline • Status: • (4) An updated program development schedule • Status: • (5) An approved Life-cycle Sustainment Plan • Status: Government and Juggernaut Assessment: Are we ready for CDR?

  13. Template / Reference MapTO GUIDE YOU IN YOUR EFFORT, SEE THE FOLLOWING REFERENCE MATRIX