1 / 10

LDA, CCC, Mars-Modul

LDA, CCC, Mars-Modul. ATCalMZ Montagsmeeting. 08.04.2013. Passive PCB: 1. Wing with 32 HDMI c onnectors ( almost finished ) :. LDA Layout. 99mm. 367,5mm. 1. Passive PCB: 2. Central module with 32 HDMI connectors (almost finished):. LDA Layout. 99mm. 365mm. 2. LDA Layout.

beau-berry
Download Presentation

LDA, CCC, Mars-Modul

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LDA, CCC, Mars-Modul ATCalMZ Montagsmeeting 08.04.2013

  2. Passive PCB: 1. Wing with 32 HDMI connectors (almostfinished): LDA Layout 99mm 367,5mm 1

  3. Passive PCB: 2. Central module with 32 HDMI connectors (almost finished): LDA Layout 99mm 365mm 2

  4. LDA Layout Active PCB: 3. Daughter module: FPGA FPGA FPGA FPGA RJ45 80mm MARS SD HDMI-CCC 300mm 3

  5. LDA Layout Artix vs. Kintex 7: FPGA FPGA FPGA FPGA RJ45 MARS SD HDMI-CCC High-Performance Artix 7 FGG676-1 182€ Kintex 7 FBG676-1 266€ 4

  6. Mars-Modul • Problems: (until Wednesday, we hope) • Doesn’t work (debugging too) • Enclustra will helpusthisweek • First non engineeringsamplesat May • Programm Interface Configurater, almostfinished FPGA FPGA FPGA RJ45 4

  7. Processing Instruction Configurator (piconf) (by RouvenSpreckels) • Configures all devices • Configurationproceduresareautomated • Everythingstored in oneor multiple XML files • Self-explanatory, predefined XML tags • Interface independent: • implemented: TCP/IP CCC (and LDA) Configuration 5

  8. piconfexample 6

  9. Vidyo-Meeting: • 11th April 10:30 o’clock • About the CCC and TLU upgrades • David Cussans will give us the TLU VHDL code, so “easy” implementing • Two possibilities: • Baseline software or fallback hardware(or switched) • Timeline July 2013 AIDA Meeting 7

  10. Rouven and I / Sascha? • Flight to DESY will bepaidifitisimportant • In 2 weeks? CCC DESY Support 5

More Related