Tevatron Status - July 10, 2009: Houses Fixed, Spool Replaced, RF Water Leaks, and More

This update provides the status of Tevatron repairs including house fixes, spool replacement, RF water leaks, and other ongoing tasks. It also mentions the installation of a new crystal collimator and plans for realignment and elevation changes.

bedwin
Download Presentation

Tevatron Status - July 10, 2009: Houses Fixed, Spool Replaced, RF Water Leaks, and More

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tevatron Status July 10 2009 J Volk

  2. Six Houses to fixA3, E3, D3, A1, D1, E1 A1 A3 replaced spool D A0 4 1 F0 B0 E3 3 6 E0 C0 OK E1 D1 Working on 2 5 D0 To do D3

  3. Other Items Un Roll Tev magnet 50% complete Tev RF water leaks Fix leak on RF 5 this week RF 2 later Horizontal Crystal collimator installed at E-0 Repairing HLS systems around Tevatron Re align A side low beta quads Mid August Re align D0 low beta ??

  4. Change in elevation of CDF South aka toward center of ring CDF South East B sector West A sector

  5. Change in elevation of CDF South aka toward center of ring In October of 08 beam pipe East side was moved up 6 mm CDF South East B sector West A sector 0.012” 0.3 mm -0.018” -0.46 mm +0.013” +0.3 mm -0.020”-0.5 mm