An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CKOV Status ++ PMT assembly parts at IIT being completed. Magnetic Shields ready. ++ Steele for Light box at U of Iowa. Machining to be completed in June. Some irregularities with the water-jet cutting. 2nd order being set up. Nickel plating work may be in jeopardy. ++ Aerogel compartments and back covers being machined at UM- 2wks. ++ PMTs selection completed at Trieste. Scheduling shipment. ++ PMT base being assembled and tested at FNAL and then at UM. ++ Final bases assembled after sign-off. Waiting for parts. ++ LED pulser and monitor diodes being tested. ++ Elipsoidal mirror prototypes at FNAL for surface deposition uniformity tests. - June 18. ++ Flat aerogel compartment mirrors then to be coated by June 28. + Production Ellipsoidal mirrors being slumped and then shipped to FNAL for coating. Tight schedule here! Scheduled to begin in late June!! ++ Aerogel Shipment expected in June. ++ RAL Shipping plans being formulated. ++TOFO/CKOV beamline stand in preparation. ++ 100% optimistic, +50% optimistic L. Cremaldi, NFMCC Mtg June 8, '07.

  2. LexanMirror Oven PMT Shields PMT Assembly Schott Glass Window Scan Delrin Aerogel Compartment PMT base Design L. Cremaldi, NFMCC Mtg June 8, '07.

  3. TOF0/CKOV1 Support Stand • TOF0/CKOV Stand being designed by Wing L with assistance by Ghislain -CM18 • Ghislain looking in to magnetic field intensity near TOF0/CKOV. - CM18 Quad-triplet 2 L. Cremaldi, NFMCC Mtg June 8, '07.

  4. CKOV Assembly Schedule • Pre- mechanical assembly tests in the US as parts are available. • Aerogel + Parts shipped to RAL in by early July. • Personnel to RAL July 15-Aug1. (Sanders, Cremaldi) • Aerogel box assembled in Safe area at RAL. Completed by July 20. • Mechanical assembly follows. Aerogel + PMTs + Mirrors. • Installation in beamline of CKOV by July 30,31 Jun14 Jun21 Jul1 Jul7 Jul14 Jul21 Aug1 beam Ckov Parts PMTs Cremaldi/Sanders Assembly Mirrors aerogel Install L. Cremaldi, NFMCC Mtg June 8, '07.

  5. L. Cremaldi, NFMCC Mtg June 8, '07.

  6. Summary • US Work Package • PMTs - Trieste • PMT bases- FNAL • PMT Enclosure - IIT • Fe Light Box - U Iowa • Aerogel - IIT • Aerogel compartments -UM Mirrors - UM/FNAL • DAQ/Shaper - Geneva • LED/Pulser - UM • HV Supply/Fanout RAL Infrastructure Assembly Area Support Stand Assembly Stand Cabling Racks&Crates Power Storage Gas Supply User ID’s User Safety Training Stockroom Electronics Pool RAL Shipping Address L. Cremaldi, NFMCC Mtg June 8, '07.