Propositions de consolidation Logique ADS QSRB AirLiquide

Propositions de consolidation Logique ADS QSRB AirLiquide. E.Duret /T. Peutin/ K.Brodzinski / P.Durand 15-06-2012. INTRODUCTION.

bijan
Download Presentation

Propositions de consolidation Logique ADS QSRB AirLiquide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Propositions de consolidation Logique ADS QSRB AirLiquide E.Duret/T. Peutin/K.Brodzinski/P.Durand 15-06-2012

  2. INTRODUCTION • Suite au probleme de connexion de 2ADS en parallelesur la QSRB P4 le 28 mai dernier, plusieurs consolidations sontproposees pour eviterque les problemesrencontresce jour la ne se reproduisent • Nous ne parleronsicique des consolidations software (Le hardware sera traite a part) • L’ analysedetaillee de tous les problemesrencontresdurantcette regeneration/connexiond’ADSest reprise par un autre document :

  3. PROBLEMES RENCONTRES • 1-Probleme de DeltaP>0.3bar sur 3PV332 empechant de lancer la circulation dans ADS3. • 2-Pas de circulation=>TT336>280K. Lancementdes pompages a froid (xTT220<280K) risque de casse du materiel et regeneration inefficace • 3-Premier pompage a duré 27h !!! • 4-Mise en froidparallele de ADS1 et ADS3 puisconnexion des 2 ADS simultanement au bout de 10min seulement de cool-down avec ADS1 vers 280K  bouchagefiltre turbine avec risque de casse de materiel

  4. PROPOSITIONS

  5. 1-ProblemeDeltaPsur xPV332 • Situation au STEP315 lorsque ADS depressurise a 5bar: Adsorbeur Process Process xPV229 xCV220 xPT220: 5bar xPV332 xPV337 xPV336 Enceinte a vide TT336 Vers MP Atmosphere PT331: 6.5bar PT338: 5bar PV330 PV338 PV339 CV333 CV336 PV334 atm HP 9P339 1.5bar 1.4bar circulateur

  6. A la fin du STEP 315, xPV337 est OPEN et PT331>xPT220-0.3 • Mais PT331=6.5bar car xPV332 fuyarde en ligne • En Step 320, impossible d’ ouvrir xPV332 car deltaP > 0.3bar

  7. Solution proposee: En Step 315 : a/ ajuster PT338 avec CV333/CV336 pour avoir ABS(PT338-xPT220)<0.3barb/Ouvrir xPV337 c/Lorsque xPV337 On status, ajuster PT338 avec CV333/CV336 pour avoir ABS(PT331-xPT220)<0.3bar d/Ouvrir xPV332 e/Modifier condition de sortie du STEP315 par:“xPV337 AND xPV332 Open” f/Modifier titreGrafcet STEP315 par “ADS connexion to ADScommon circuit”

  8. 2-Pas de circulation pour rechauffage • En Step 320, aucune action ne commence car xPV332 CLOSED (delta P>0.3bar) • La logiqueregarde TT336 qui estsuperieure a 280K. • A la fin du timer de 15min, la condition de sortie du STEP320 estvalidee et on passe au STEP330  pompages a froid !!!

  9. Solution proposee En step 320 a/Modifier condition de sortie du Step par:xTT220>275K AND (TT336>280K AND timer>=15min)On eviteainsi en cas de defaillance du circulateurou d’un autreequipementque le Warm-up ne soit pas lance. b/Enlever la demande d’ ouverture de xPV332 car dejaeffectue au STEP315

  10. 3-Premierpompage a duré 25h ! • Problemesur 9PT338 durant le premier pompagefaisantque les conditions pour regonflerl’adssont venues au bout de 25h !

  11. Solutions proposées 1-Evidemment changement du capteur…(hardware) 2-Implémenter un timer (20h) lorsque ADS en regen pour avertirl’operateur avec un Beep Warning si timer dépassé. 3- Timer à implémentersurtoutes les logiques ADS QSKA/QSRB

  12. 3-Cool-down des ADS1 et ADS3 en parallele • A la fin du STEP370, lorsque GT336<10%  “CV336 Closed” et condition de sortie validee pour aller en STEP1 • Demande de connexion ADS3 active maisaussi ADS1 (timeout arrive justeavant) • Tempo de 3sec sur DI ADSCavail=1 avantd’avoir ADS1ConnectionReq • En STEP1, la DI ADSCavailpasse a 1 et la logiquedemande “All objects in fail safe position” • DO pour fermer xPV337 Off mais 3GL337 arrive troptard et la logiquerecoit le ADS1ConnectionReq • A la transition, le 3GL337 =1 et les ADS1 et 3 sontconnectes en meme temps et en 10min a chaud !!!

  13. La logiqueactuelle • Si TT229>80KADS3_ConnectionReq=0 Dans la pratique : • Si 30K<TT229<80K Operateur decide d’isoler ADS3-3CV225 en MAN/FORCE ON-Lancementregen ADS3 puis-3CV220 et 3PV229 en MAN/FORCE OFFD’apres la logique, sivannes en Man/ForceModeADS3Avail=0  ADS3_ConnectionReq=0 • Si TT229<30K : a) Adsorbeurconnecte au process ADS3_ConnectionReq=0 b)Regeneration request par operateurou timeout ADSa la fin de la regen de ADS3ADS3_ConnectionReq=1

  14. Solution proposee pour Ads1 et pour Ads2 A ajouter CB_ADS Ads3 Connection Req

  15. Et pour LN2 • Pour l’ouverture de 5PV332 appliquer la meme logiqueque pour les adsorbeurs.