Pradhan Mantri Swasthya Suraksha Yojana (PMSSY)

Pradhan Mantri Swasthya Suraksha Yojana (PMSSY). 19 th and 20 th August 2019. PMSSY- brief introduction. Launched in 2003 Scheme components:. N ew AIIMS- 21 approved. GMC Up-gradation Projects- 75 projects in 24 States. More projects may be considered in subsequent phases.

blakely
Download Presentation

Pradhan Mantri Swasthya Suraksha Yojana (PMSSY)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pradhan Mantri Swasthya Suraksha Yojana (PMSSY) 19th and 20thAugust 2019

  2. PMSSY- brief introduction • Launched in 2003 • Scheme components: • New AIIMS- 21 approved. • GMC Up-gradation Projects- 75 projects in 24 States. • More projects may be considered in subsequent phases.

  3. New AIIMS • 22 AIIMS • 06 AIIMS fully functional • Phased operationalization in others • MBBS classes- 08 AIIMS (Started in temporary campus) • OPD services- 04 AIIMS • Central Institute Body(CIB) as overarching governance structure • Chief secretary’s association in the IBs of AIIMS • State Level Monitoring committees • under chair of Chief secretary/ Principal Secretary • to review progress and help resolve local issues/ hindrances • to facilitate smooth operation of AIIMS • To tap AIIMS’ resources to address Public Health issues

  4. New AIIMS operations- Progress and plans

  5. New AIIMS -Common Issues and Expectations Re: Construction • Encumbrance free Site- demolitions, shifting of HT lines, FCA clearance, tree cutting, earth-fillings etc. • Facilitating statutory approvals- EIA clearance, Building plan approvals • Ensuring availability of Local material- sand, crushed stone etc. • State level monitoring committee meetings under chair of Chief secretary/ Principal Secretary(ME) • WhatsApp group under Chief Secretary/ Principal secretary(ME)- GoI/ AIIMS officials, Executing agencies will join Re: Operationalization • Phased operation- OPD, MBBS classes • Temporary campus for MBBS classes • Timely planning for Electricity/ Water connection • Planning for Sewage and effluent beyond the AIIMS campus.

  6. Up-gradation of existing GMCs • Up-gradation Projects- Super Specialty Blocks (SSB)/ Trauma Centres (TC) • Facilities (As decided in the Gap Analysis) • No. of Beds (150-250) • 8-10 Super Specialty Departments • Additional PG seats • Cost: 150/ 200 crore • Cost Sharing with States in 60:40 ratio • Operational HR to be arranged by the State

  7. State-wise Coverage Percentage under PMSSY (GMCs covered/ total no of GMCs in the State) Nil Projects 0% 1-20% 20- 40% 40-60% > 60%

  8. GMC Upgradation- Common Issues and Expectations • Release of State share- several projects delayed • Encumbrance free Site • Facilitation for medical equipment • Deputing Nodal officer/ Faculty for supervising testing/ commissioning/ FAC • Power connection- to facilitate commissioning of equipments • Plan for additional water requirement • Assistance in NOC for Fireclearance etc. • Progress review meetings by Principal secretary(ME) • Human Resource for running the facilities • Proposal for additional PG seats

  9. Thank You

  10. Issues pertaining to new AIIMS

  11. Issues pertaining to new AIIMS

  12. Issues pertaining to new AIIMS

  13. Issues pertaining to new AIIMS

  14. Up-gradation Projects At A Glance

  15. Projects under PMSSY

  16. AIIMS AT A GLANCE

  17. New AIIMS Projects • Expenditure (Capital as well as operational) for AIIMS borne by Govt. of India Outcome Framework • Each New AIIMS to add:- • 15-20 Super-Specialty Departments. • 750 Beds (960 Beds in first six AIIMS). • 100 UG (MBBS) seats. • 60 B.Sc. (Nursing ) seats. • Greater Focus on PG and higher education and Research. • Research to also address local Public Health issues.

  18. Completion Plan for New AIIMS

  19. Facilities Envisaged under 75 GMC Projects

  20. Completion Plan of Up-gradation Projects

  21. Mode of Execution and Monitoring systems • Construction works through central Executing Agencies (EAs)- HSCC, HITES, NBCC, CPWD • Procurement of Medical Equipment through Procurement Support Agency(PSA) (M/s HITES) • Online Dashboard to facilitate closer and more effective monitoring. https://dashboard.nhp.gov.in/pmssy • Progress review by the Central Institute Body (CIB) • Progress review structure at the State level • Project Monitoring Group (PMG) meeting under the chair of Chief Secretary to review progress and resolve local State level/ site specific issues. • Committee under Principal Secretary (ME) for expeditious resolutions of local State specific issues.

  22. GMC Up-gradation Projects- Present Coverage

  23. GMC Up-gradation Projects- Present Coverage (Contd.)