Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh. Project Site. Project Scope Site Assessment & MOM. Key Challenges Remote Site Old Installation Close co-ordination among S&S, Vingiri & NEEPCO

bosworth
Download Presentation

Project Site

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: 33kV Substation RefurbishmentCustomer: NEEPCOSite : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh

  2. Project Site

  3. Project Scope Site Assessment & MOM • Key Challenges • Remote Site • Old Installation • Close co-ordination among S&S, Vingiri & NEEPCO • Technical Requirement Agreement on performance improvement targeted before detailed engineering • Schedule of execution

  4. Key Contacts Site Contact : NEEPCO Mr.Mohan lal kumhar, Sr. Manager(E/M)US &W, Mob.No:09436225093/08730946725 Vingiri Powertech Pvt Ltd Mr.K.A.Singh , Mob.No:09433229494. S&S Power Switchgear Ltd Mr.Manikanda kumaran. Mob.No.08608330332

  5. NEEPCO HYDRO POWERSTATION – SLD

  6. OPPORTUNITY SIZE (Qty)

  7. REPLACEMENT OF EXISTING SF6 WITH NEW OFVP36 OLD SF6 S&S OFVp36

  8. REPLACEMENT OF EXISTING 33kV DISCONNECTOR WITH NEW 33kV DISCONNECTOR OLD DISCONNECTOR S&S DISCONNECTOR

  9. REPLACEMENT OF EXISTING INDOOR CONTROL UNIT PANEL WITH NEW INDOOR CONTROL UNIT PANELS OLD INDOOR CONTROL UNIT PANELS S&S INDOOR CONTROL UNIT PANELS

  10. INTEGRATED REMOTE CONTROL CUBILE FOR 33kV VCB DISCONNECTOR OLD REMOTE PANEL NEW INTEGRATED REMOTE PANEL

  11. Dispatch Erection and Testing and Commissioning ( Load test ) Site visit, Drawing preparation & clarification FEB MAR MAY JUL Drawing , QAP Approval and Manufacturing , Internal Inspection. Customer Inspection

  12. DIVISION OF RESPONSIBILITY

  13. OLD SF6 VS NEW VACUUM BREAKER

  14. MINUTES OF MEETING – AT MMF

  15. MINUTES OF MEETING – AT NEEPCO