Smart ShutDown Performance Support (SSPS)

Smart ShutDown Performance Support (SSPS). Kick-Off Meeting. 1300 hrs 12 January 2010 Scibetta Conference Room DAU- South Region. Smart Shut Down Model Construct. Smart Shut Down Performance Support (SSPS). DOD AT&L Rep - Army Rep - Air Force Rep – Navy Rep – Marine Rep - .

bowie
Download Presentation

Smart ShutDown Performance Support (SSPS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Smart ShutDown Performance Support (SSPS) Kick-Off Meeting 1300 hrs 12 January 2010 Scibetta Conference Room DAU- South Region

  2. Smart Shut Down Model Construct Smart Shut Down Performance Support (SSPS) DOD AT&L Rep - Army Rep - Air Force Rep – Navy Rep – Marine Rep - Leadership Team: John Adams Project Lead Mark Unger DAU-S Lead (Deputy Project Lead) Jerry Davis Contractor Lead Hon Claude Bolton Senior Advisor Personnel Realignment Capabilities/ Requirements Realignment Technologies Realignment Contracts Realignment • Reviews • PEIR* • POS** • Lessons • Learned Facilities/HW/SW Realignment Budget/Financial Management Realignment Lead- Lead- Lead- Lead- Lead- Lead- Lead- Navy - DDX 1000 ERGM Marines – VH-71 MDA- KEI Army – Comanche Crusader AF CSAR-X Research/ Lit Search • Lessons Learned • DOD • Industry Lead- Sec - Interview (Live-on-Live) • Service Acquisition Executive • PEO • PM • DPM Lead- Sec - *Programmatic, Engineering & Test, Integration & Logistics, Requirements & Advocacy ** Probability of Success PRODUCT As of 24 Sept 09 1600hrs Endgame Product Definition

  3. Spectrum of endgame product PRODUCT • Termination • Guide • Checklist • “Think Abouts” • “PPLTs” • How-To Class • Termination • Workshop / • w follow-up • Travel Contact • Team • DL • Res Light DAU involvement Extensive DAU involvement Provide the Program Manager with a “toolbox” for Smart Shutdown Action Senior Expert Consultation – ( 14 July) • Sanity Check/Validate Task and Construct • Recommendations: • Endgame Product • Stratification of realignment “Lanes” • Effort Timelines Endgame Product Definition • Key Individuals • Paul Begosian (former Army AVN PEO) • George Williams (former Msl PEO/AAE designee)) • Claude Bolton (former AF PEO/AAE) • Jesse Granone (former SES SMDC)

  4. Spectrum of endgame product PRODUCT Mr Andersons’ Direction • Termination • Guide • Checklist • “Think Abouts” • Action Cards • How-To Class • Termination • Workshop / • w follow-up • Travel Contact • Team • DL • Res Light DAU involvement Extensive DAU involvement Provide the Program Manager with a “toolbox” for Smart Shutdown Action Senior Expert Consultation – ( 14 July) • Sanity Check/Validate Task and Construct • Recommendations: • Endgame Product • Stratification of realignment “Lanes” • Effort Timelines Endgame Product Definition • Key Individuals • Paul Begosian (former Army AVN PEO) • George Williams (former Msl PEO/AAE designee)) • Claude Bolton (former AF PEO/AAE) • Jesse Granone (former SES SMDC)

  5. SSPS Program Managers ToolBox(proposed) • SmartCard - Program Considerations Profile Card (Database) • Profile cards outlining critical program considerations by individual Lanes (Personnel, • Requirements, Technologies, Facilities, Contracts, Budget/Financial Management) . • Smart ShutDown Program Guidebook (Termination Guide) • Guidebook outlining processes and plans to assist in efficient and successful • termination activities. • Smart ShutDown Special Interest Area (SAI) • Collaborative workspace in ACC to facilitate communication and best practices • applications concerning all facets of Program shutdown. • Smart Shutdown Program Plan Generator • Integrated database ( using metataged program considerations) for the automatic • generation and tailoring of Program specific shutdown activites.

  6. Product Timeline Estimate (Revised*) ~ ~ PRODUCT • Termination • Guide • Checklist • “Think Abouts” • Action Cards • How-To Class • Termination • Workshop / • w follow-up • Travel Contact • Team • DL • Res • TT 1st QTR Oct-Dec 4th QTR Jul-Sep Jul Jan Feb Mar Apr May Jun • Develop “initial” Deck (DAU) • Army Centric (hybrid) • No International • Senior Expert Review • “Initial” Deck Construct (DAU) • SSPS Leadership Tm Interviews (DAU) • MILDEPs • Selected PEO/PMs • SSPS ‘Initial” Deck Review (DAU)) • MDAP Lds • Regional SME’s • Develop Expanded Deck (DAU) • Air Force • Navy • International • Senior Expert Ctr Review • Expanded Deck Delivery (DAU) Develop TT Course (DAU) FOLLOW ON ACTIVITY Develop Program Termination Guidebook (DAU) Develop On-line Learning Course/Module(DAU)

  7. Product Timeline Estimate (Revised*) ~ ~ PRODUCT • Termination • Guide • Checklist • “Think Abouts” • Action Cards • How-To Class • Termination • Workshop / • w follow-up • Travel Contact • Team • DL • Res • TT 1st QTR Oct-Dec 4th QTR Jul-Sep Jul Jan Feb Mar Apr May Jun • Develop “initial” Deck (DAU) • Army Centric (hybrid) • No International • Senior Expert Review • “Initial” Deck Construct (DAU) • SSPS Leadership Tm Interviews (DAU) • MILDEPs • Selected PEO/PMs • SSPS ‘Initial” Deck Review (DAU)) • MDAP Lds • Regional SME’s • Develop Expanded Deck (DAU) • Air Force • Navy • International • Senior Expert Ctr Review • Expanded Deck Delivery (DAU) Develop TT Course (DAU) FOLLOW ON ACTIVITY Develop Program Termination Guidebook (DAU) Develop On-line Learning Course/Module(DAU)

  8. Product Timeline Estimate (Revised*) ~ ~ PRODUCT • Termination • Guide • Checklist • “Think Abouts” • Action Cards • How-To Class • Termination • Workshop / • w follow-up • Travel Contact • Team • DL • Res • TT 1st QTR Oct-Dec 4th QTR Jul-Sep Jul Jan Feb Mar Apr May Jun • Develop “initial” Deck (DAU) • Army Centric (hybrid) • No International • Senior Expert Review Senior Leader Interviews/Assessments • “Initial” Deck Construct (DAU) • SSPS Leadership Tm Interviews (DAU) • MILDEPs • Selected PEO/PMs • SSPS ‘Initial” Deck Review (DAU)) • MDAP Lds • Regional SME’s • Develop Expanded Deck (DAU) • Air Force • Navy • International • Senior Expert Ctr Review • Expanded Deck Delivery (DAU) Develop TT Course (DAU) FOLLOW ON ACTIVITY Develop Program Termination Guidebook (DAU) Develop On-line Learning Course/Module(DAU)

  9. Smart Shut Down Model Construct Smart Shut Down Performance Support (SSPS) DOD AT&L Rep - Army Rep - Air Force Rep – Navy Rep – Marine Rep - Leadership Team: John Adams Project Lead Mark Unger DAU-S Lead (Deputy Project Lead) Jerry Davis Contractor Lead Hon Claude Bolton Senior Advisor Personnel Realignment Capabilities/ Requirements Realignment Technologies Realignment Contracts Realignment • Reviews • PEIR* • POS** • Lessons • Learned Facilities/HW/SW Realignment Budget/Financial Management Realignment Lead- Bev Hopkins Karen Stadler Lead- Don Riley Lead- Bill Decker Jeff Craver Lead- Ed Adkins Lead- Lead- Diane Williams Navy - DDX 1000 ERGM Marines – VH-71 MDA- KEI Army – Comanche Crusader AF CSAR-X Research/ Lit Search • Lessons Learned • DOD • Industry Interview (Live-on-Live) • Service Acquisition Executive • PEO • PM • DPM Lead- Mark Unger Sec - Jerry Davis *Programmatic, Engineering & Test, Integration & Logistics, Requirements & Advocacy ** Probability of Success PRODUCT As of 24 Sept 09 1600hrs Endgame Product Definition

  10. SSPS Program Managers ToolBox(proposed) Immediate Product Developed by Lane Leads • SmartCard - Program Considerations Profile Card (Database) • Profile cards outlining critical program considerations by individual Lanes (Personnel, • Requirements, Technologies, Facilities, Contracts, Budget/Financial Management) . • Smart ShutDown Program Guidebook (Termination Guide) • Guidebook outlining processes and plans to assist in efficient and successful • termination activities. • Smart ShutDown Special Interest Area (SAI) • Collaborative workspace in ACC to facilitate communication and best practices • applications concerning all facets of Program shutdown. • Smart Shutdown Program Plan Generator • Integrated database ( using metataged program considerations) for the automatic • generation and tailoring of Program specific shutdown activites.

  11. Smart Shut Down Model Construct (Program Considerations Database Development) Support Tools SSPS Weekly Caucus (Management Process) Tuesdays, Scibetta Conference Room, 1300 hours Lane Focus Open attendance • Product Development Resources • Mission Assistance “RG” Hours • Data Sources Identification • eMTS Charge Number - 59147C • SmartShutDownPS@DAU.MIL Smart ShutDown Special Interest Area (COP)

  12. Smart Shut Down Model Construct (Program Considerations Database Development) SSPS Weekly Caucus (Management Process) Standard Day/Time/Location Lane Focus Open attendance Caucus Data Capture SME Interviews SSC Fellows ARJ Data Call ACC COP Forum Facebook Forum Acq Alumni RFI (e-Blast) LL/Research Review Data Sources Personnel Realignment Cap/Req Realignment Technologies Realignment Facilities Realignment Contracts Realignment BFM Realignment

  13. Program ACAT Service Program Considerations Profile Card “SmartCard” (example) PEO Date Version of Lane Personnel Realignment A-appropriate N-not appropriate Designator Consideration A N POC Information P R T F C B Populate List of Program Considerations POC’s List per Service

  14. Program ACAT Service Program Considerations Profile Card “SmartCard” (example) PEO Date Version of Lane Personnel Realignment A-appropriate N-not appropriate Designator Consideration A N POC Information P R T F C B 1.0.0 GENERAL 1.0.1 Has a personnel drawdown plan been established matching required personnel skillsets with current and future drawdown activities? 1.0.2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 1.0.3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 2.0.0 MILITARY 2.0.1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 2.0.2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 3.0.0 GOVERNMENT Core 3.1.0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 3.1.1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 3.1.2 Matrix 3.2.0 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 3.1.1 3.1.2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 4.0.0 SETAC 4.0.1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 4.0.2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX MS EXCEL Format (To Be Provided)

  15. SSPS Program Guidebook • Contents(Proposed) • Purpose • Historical Perspective • Termination Planning • Program Considerations Checklists • Smart ShutDown Toolkit • Lessons Learned (POS/PEIR) • Annex A – Personnel Realignment Program Considerations • Annex B - Requirements Realignment Program Considerations • Annex C - Technologies Realignment Program Considerations • Annex D - Facilities/ Hardware Realignment Program Considerations • Annex E - Contracts Realignment Program Considerations • Annex F - Budget / Financial Management Program Considerations • Appendix 1- Joint Program Perspectives • Appendix 1 – Army Program Perspectives • Appendix 2 – Air Force Program Perspectives • Appendix 3 - Navy Program Perspectives • Appendix 4 - International Program Perspectives DRAFT

  16. Smart Shutdown Special Interest Area Community of Practice Personnel Realignment Under Construction Capabilities/Requirements Realignment • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned • Discussion Forum • Documents • Best Practices Technologies Realignment Program Review/ Lessons Learned DoD ACAT I/II/III SYSTEMS TERMINATION • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned Budget/Financial Mgt Realignment Facilities/HW/SW Realignment • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned Contracts Realignment • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned • Discussion Forum • Documents • Best Practices • Program Considerations • Lessons Learned

  17. SSPS Lane Leader Task • Understand the “Program Considerations Database” construct and intent • Examine/Review and recommend data source opportunities • Construct your considerations database development “plan of action” • Determine Resource requirements for database task completion by 1 April 2010 Provide plan to John Adams 1200 hrs, 19 January 2010.

  18. Questions / Concerns

  19. Back Up Charts

  20. YEAR CXLD SYSTEM PEO/CENTER DIR PM SERVICE/AGENCY ARMY 2002 Crusader LTG (R) Joseph Yakovak Col Charles Cartwright ARMY 2004 Comanche MG (R) Joseph Bergantz Col (R) Robert Birmingham Mr. Dwayne Marshall 937-255-4790 Dwayne.Marshall@wpafb.af.mil AF 2009 CSAR-X Information incoming RAdm Steve Eastburg 301-757-5376 Steven.eastburg@navy.mil Mr. Dave Wooten 301-757-5782 David.wooten@navy.mil Marines 2009 VH-71r RAdm William Landay III 202-781-2941 Bill.landay@navy.mil CAPT James Syring 202-781-2532 James.syring@navy.mil DDX-1000 (Zumwalt) NAVY 2009 RAdm Terry Benedict 202-781-2964 Terry.benedict@navy.mil CAPT Timothy Batzler 703-872-37006 Timothy.batzler@navy.mil EX-171 (ERGM) NAVY 2008 Brig Gen Terrence Feehan Terrence.Feehan@mda.mil Mr Calrton Brewer Carlton.brewer@mda.mil MDA 2009 KEI