1 / 8

Japan-US Research Budget 2007 & SciBooNE Upgrade

SciBooNE Meeting @January 16, 2007. Japan-US Research Budget 2007 & SciBooNE Upgrade. T. Nakaya (Kyoto). Japan-US status. 2006 (the last year) 30Myen (~US$250k) for equipments 37Myen (2006), 6.9Myen (2007), 8Myen (2008) were requested at the beginning of SciBooNE.

brinda
Download Presentation

Japan-US Research Budget 2007 & SciBooNE Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SciBooNE Meeting @January 16, 2007 Japan-US Research Budget 2007& SciBooNE Upgrade T. Nakaya (Kyoto)

  2. Japan-US status • 2006 (the last year) • 30Myen (~US$250k) for equipments • 37Myen (2006), 6.9Myen (2007), 8Myen (2008) were requested at the beginning of SciBooNE. • 5.6Myen (~$50k) for travel • 6.5Myen was requested • 2007 (Proposal deadline is January 31st, 2007) • (37-30)M +6.9M + a = (~14 + a=10) Myen will be requested for equipments. • ~8Myen (6.0 Myen expect) for off-line computing w/ RAID disks. • ~8Myen (6.0 Myen expect) for upgrade. • ~3Myen (2.0 Myen expect) for others (rental car, etc..) • (~5Myen for T2K Muon monitor test at the NuMI beam line.) • 5 Myen will be requested for travel. • Additional 2.5 Myen from JSPS for travel [approved]

  3. Japan-US Budget Status (in confidential?) • In 2007, MEXT (A Japanese funding agency) reduces the preliminary plan of budget for Japan-US because the agreement for energy research between Japan and US was expired in 2005. • 873Myen (2006) → 442Myen (2007) • KEK director is under negotiation with MEXT. We do not know the final outcome yet. • IPNS director recognizes the importance of SciBooNE, and I guess that the impact to SciBooNE is not large (my guess).

  4. 1. Off-Line Computing (and spares for online equipments) • We will request 8Myen (~$65k) for offline CPU, RAID disks and some of online spares, and will get ~6Myen (~$50k) in my guess. • ~$20k for Off-line CPUs • ~$20k for RAID disks. • ~$10k for spares? • If you think that it is not large enough, I will increase the request to Japan-US. Let me known by the end of this week.

  5. 2. SciBooNE Upgrade • Install the new photo-sensor, HPK MPPC, in the outer parts of SciBar scintillators. • Increase the fiducial [total] volume. • 260260 [280 280] cm2 (X-Y) ➪ 270270 [290290] cm2 (X-Y):~8% increase • Test for T2K-ND280 • HPK MPPC will be used for T2K-ND280 2ch64 layers 4(2X+2Y) =512 channels are now empty.

  6. HPK MPPC (Multi-Pixel Photon Counter). 100 and 400 pixels 6mm • Multi-Pixel Giger Mode APD • High Gain: ~106 • Compact • Low Voltage operation: ~70V • High QE for a WLS fiber readout. • 2~3 times higher than MAPMT • Cheaper than MAPMT per channel. • Available from Nov. 2006. • 150 MPPCs in Kyoto now • High single photon noise rate • O(100kHz) Yokoyama-san is the leader of the T2K-ND280 photo-sensor group. • You can ask details to Yokoyama-san. 1mm Microstructure of 100 pixel device 100mm 1PE 2PE, … 0PE ADC distributions for LED light.

  7. What are necessary for upgrade w/ MPPC? • Scintillators: Exist in SciBar • WLS fibers: will be purchased or we have them at KEK. • 600ch  3m = 1.8km {~$5k} • MPPC: will be purchased by J-US in June. • I cannot show the price yet. It is within our budget. • Readout Electronics • Will be supplied by UK which develops the proto-type electronics for T2K-ND280. • Installation • During Summer shutdown.

  8. SciBooNE J-US budget 2007 • Don’t I miss some important items? • If you have a proposal to improve SciBooNE, please inform me by the end of this week (1/20). We may have a chance to include your proposal. • Slow monitor Upgrade? • …..