1 / 31

Tanzania and Namibia – Golden Opportunities

Tanzania and Namibia – Golden Opportunities. DISCLAIMER.

Download Presentation

Tanzania and Namibia – Golden Opportunities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tanzania and Namibia – Golden Opportunities

  2. DISCLAIMER This presentation may contain forward-looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of Helio to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements may include statements regarding exploration results and budgets, resource estimates, work programmes, strategic plans, market price of precious and / or base metals or other statements that are not statements of fact. Although Helio believes the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Various factors that may affect future results include, but are not limited to, fluctuations in market prices of metals, foreign currency exchange fluctuations, risks relating to exploration, including resource estimation and costs and timing of commercial production, requirements for additional financing, political and regulatory risks, and other risks described in Helio’s management discussions and analyses as filed on SEDAR. Accordingly, undue reliance should not be placed on forward-looking statements. All technical information contained within this presentation has been reviewed and approved for disclosure by Mr. C. MacKenzie, M.Sc., C.Geol, Helio’s COO and Qualified Person as designated by NI 43-101 tsx-v:hrc disclaimer slide 1 www.helioresource.com

  3. PROJECTS tsx-v:hrc projects slide 2 www.helioresource.com

  4. STRATEGY AND FOCUS • Exploration for “World Class” gold deposits • Focus – Tanzania + Namibia • Political and economic stability • Under-explored regions • Excellent geological potential • Strong mining culture • Established legal code • Major mining companies active tsx-v:hrc strategy and focus slide 3 www.helioresource.com

  5. BOARD AND MANAGEMENT MANAGEMENT / DIRECTORS / FOUNDERS Richard Williams CEO Chris MacKenzie COO BOARD OF DIRECTORS Gren Thomas (Chairman) Founder of Aber Resources, Chairman of Strongbow Cliff Davis CEO of Nevsun Resources Stephen Leahy Chairman and CEO of North American Tungsten Corp. Colin Jones Exec. VP Dundee Resources Ltd. tsx-v:hrc board and management slide 4 www.helioresource.com

  6. CORPORATE INFORMATION • Listing TSX.V:HRC • Issued & Outstanding 79,349,349 • Management & Insiders ~12.3% of I&O • Institutional Holdings ~45% of I&O • Warrants 13,053,610@ $0.35-0.81 ~ $8,200,000 to Treasury 6,825,000 @ $0.60 (April 8, 2011) 478,610 @ $0.35 (April 8, 2011) 5,750,000 @ $0.81 (Feb 14, 2013) • Stock Options 4,445,000 • Fully Diluted 96,847,959 • Cash $3,000,000 • no debt tsx-v:hrc corporate information slide 5 www.helioresource.com

  7. TANZANIA – SMP Gold Project • SMP Gold Project • Past mining district • Excellent infrastructure • Close to water source • Road accessible • Large land package • Power into property • No population pressure • Year-round exploration tsx-v:hrc tanzania – smp gold project slide 6 www.helioresource.com

  8. LUPA GOLDFIELDS • Geology • Lupa Block located at triple junction of the Great Rift Valley • Major intrusive complex (gabbro / diorite / granite) - greenschist and lower amphibolite facies Arc – not Ubendian Mobile Belt • Main mineralised structures trend ENE and NW • Free gold occurs in mineralised zones up to 90m+ wide, with individual quartz veins up to 10m thick • New Re - Os date on mineralisation at SMP of ~1.93Ga tsx-v:hrc lupa goldfields slide 7 www.helioresource.com

  9. SMP GOLD PROJECT • 750,000 ounces produced in Lupa Goldfields • New Saza Mine produced 270,000 ounces of gold @ 7.5g/t Au (1939 – 1956) • Project covers 5 licences / 23,800 hectares (238km2) • Option to earn 100% interest subject to royalty • Earn-in completed on 4 out of 5 licences • Control over 35km strike length of Saza Shear Zone tsx-v:hrc smp gold project slide 8 www.helioresource.com

  10. SMP - HISTORIC GOLD MINES • 6 colonial-era gold mines • 60km strike length of prospective auriferous structures tsx-v:hrc smp - historic gold mines slide 9 www.helioresource.com

  11. SMP - PROSPECTS • Numerous Au occurrences and soil anomalies • Widespread historical and current artisanal mining activity tsx-v:hrc smp – prospects slide 10 www.helioresource.com

  12. SMP – DRILLING SUCCESS • Porcupine • 52m @ 3.3 g/t Au • 28m @ 5.1 g/t Au • 53m @ 2.9 g/t Au • Kenge Main • 22m @ 7.0 g/t Au • Kenge SE • 22m @ 3.6 g/t Au • Mbenge • 48m @ 2.1 g/t Au • Mbenge East • 16m @ 3.8 g/t Au • Snakebite • 8m @ 20.8 g/t Au tsx-v:hrc smp – drilling success slide 11 www.helioresource.com

  13. SMP TARGETS DRILL-TESTED • 16 targets tested over a 20 km strike length • (Mbenge and Snakebite now part of Kenge) tsx-v:hrc smp targets drill-tested slide 12 www.helioresource.com

  14. SMP – PORCUPINE DD SECTION tsx-v:hrc smp – porcupine dd section slide 13 www.helioresource.com

  15. SMP – PORCUPINE LONG SECTION tsx-v:hrc smp – porcupine long section slide 14 www.helioresource.com

  16. SMP – PORCUPINE NEW DRILLING tsx-v:hrc smp – porcupine new drilling slide 15 www.helioresource.com

  17. SMP – PORCUPINE NEW DRILLING tsx-v:hrc smp – porcupine new drilling slide 16 www.helioresource.com

  18. SMP – KENGE TARGET • Numerous Au occurrences and soil anomalies • Widespread historical artisanal mining activity tsx-v:hrc smp – kenge target slide 17 www.helioresource.com

  19. SMP – KENGE TARGET tsx-v:hrc smp – kenge target Slide 18 www.helioresource.com

  20. KENGE TARGET – RAZORBACK MINE tsx-v:hrc kenge target – razorback mine slide 19 www.helioresource.com

  21. METALLURGY • Low Cyanide Consumption • No “Preg Robbing” activity • Non acid-generating tailings tsx-v:hrc metallurgy slide 20 www.helioresource.com

  22. SMP – NEW PROSPECTS • Numerous Au occurrences and soil anomalies • Widespread historical artisanal mining activity tsx-v:hrc smp – new prospects slide 21 www.helioresource.com

  23. SMP – TUMBILI TARGET • RC drill programme to test all newly identified targets. tsx-v:hrc smp – tumbili target slide 22 www.helioresource.com

  24. PROJECTS tsx-v:hrc projects slide 23 www.helioresource.com

  25. NAMIBIA – DAMARA GOLD PROJECT 4 licences – 396,000 hectares tsx-v:hrc namibia – damara gold project slide 24 www.helioresource.com

  26. NAMIBIA – DAMARA GOLD PROJECT Same geological terrain as AngloGold’s Navachab Mine tsx-v:hrc namibia – damara gold project slide 25 www.helioresource.com

  27. DGP – GOLD KOP DRILLING tsx-v:hrc dgp – gold kop drilling slide 26 www.helioresource.com

  28. DGP – WILHELMSTAL tsx-v:hrc dgp – wilhelmstal slide 27 www.helioresource.com

  29. PEER COMPARISONS tsx-v:hrc peer comparisons Slide 28 1 www.helioresource.com

  30. RECAP • Tanzania + Namibia – countries with strong track record for investment and mine development • Tanzania - 4th largest gold producer in Africa • Multiple drill targets in Tanzania and Namibia • Initial Resource Estimate by year end from the SMP Gold Project, Tanzania. • Excellent metallurgical results from the SMP Gold Project. tsx-v:hrc recap slide 29 www.helioresource.com

  31. 580 – 625 Howe Street, Vancouver B.C., V6C 2T6 Canada www.helioresource.com +1 604 638 8002

More Related