An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview: • Introduction/Background • Kevin Allen • Noel Shenoi • Core Basics • Solutions • Additional Literature

  2. Core Basics Trustworthy Solutions Reliable Value Knowledgeable

  3. High Vacuum Dual Phase Extraction & Groundwater Treatment Systems Saving the Environment One Drop At A Time

  4. Your Remediation One Stop Shop CalClean has a working relationship with numerous consultants and contractors throughout the US to assist with the assessment, cleanup, and case closure of your site(s). We manage the remediation project from beginning to end. No lengthy reports to review and submit to the Agency. We handle that burden for you and provide short executive summaries. CalClean is interested in Performance Based Contract (PBC) projects anywhere in the US. With truck mounted extraction systems and water treatment systems located in numerous areas throughout the US, we can mobilize anywhere. We handle your money like it is our own. There are no hidden mark-ups. We get your location to closure much faster.

  5. Service Equipment Petroleum Hydrocarbons: Fleet of Mobile Trucks mounted with 450-CFM High Vacuum Systems and 25 hp Liquid Ring Pumps (LRP); and Fleet of Mobile Trailer mounted systems with 10-20 hp LRPs. Onsite Groundwater Treatment: Fleet of Mobile Trailers mounted with 20-GPM Carbon Systems (Patented System) • Fleet of 20-hp Chlorinated Solvent Systems (Carbon)

  6. Report Card THIRTEEN (13) YEARS OVER 300 CASE CLOSURES & 60 SITES IN 5 STATES NOW IN FINAL CLOSURE MONITORING

  7. Advantages • Most Cost Effective (Lowest $ / lb. Hydrocarbon Removed) • No Capital Or Maintenance Cost Outlays • Can Mobilize Quickly • No Shutdown Of Operations Do To Installation Of Trenching • Low Noise For 24-Hour Operations In Neighborhoods • Occupies Less Space At Station • High Capacity Equipment (SCFM and GPM) • Various Permitting Already Obtained • 100% Guaranteed Up Time • Quality Technical Expertise And Supervision • Mobile Fleet Of Truck And Trailer Mounted Extraction Systems • Faster Clean-up = Quicker Release Of Long Term Liability

  8. Enhanced Remediation Techniques • Use Air Sparging to enhance HVDPE • Use HVDPE to remove diesel free product • Clean up contaminated vadose only sites quickly with high vacuum systems • New well box and underground piping design for HVDPE operations • Use periodic extractions (w/interruptible pricing) to address interim rebound • Can extract from depths of >270 feet

  9. Examples of HVDPE w/Air Sparging ConcentrationConcentration Locationw/o Air Spargingw/Air Sparging Gardena 600 ppmv10,000 ppmv Diamond Tire 500 ppmv11,000 ppmv Glen Avon 200 ppmv6,000 ppmv

  10. End of Presentation Remaining slides for information purposes only

  11. Extraction Process HIGH VACUUM VAPOR EXTRACTION TANK TANK PLUME IN VADOSE ZONE PLUME IN SATURATED ZONE DUAL PHASE EXTRACTION

  12. Flow Diagram

  13. Vapor and Groundwater Extraction 8hr.* 24hr.* 5 days* 20 days* Cone of Depression 1 month* * TIMING FOR ILLUSTRATIVE PURPOSES ONLY ( Longer Events usually increase Cone of Depression and expose more saturated zone for vapor extraction)

  14. Systems Comparison Pump & Treat CalClean HVDPE Standard S.V.E. Fixed Based Systems (Few Mobile Systems) Typical System is 250 CFM But Cannot Extract Water Typical System can Destroy up to 40 pounds per hour of hydrocarbons Typically Extracts up to 10” Hg (136” H2O) i.e.. Smaller Radius of Influence, More Wells Required, Greater Costs Extract Vapor Only Cannot Extract Groundwater Truck-Mounted Mobile Systems High Capacity 450 CFM Systems Can Extract 5-50 GPM Water Can Extract & Destroy up to 130 pounds of Hydrocarbons per hour Can Extract up to 29” Hg (394” H2O) i.e.. Large Radius of Influence, Less Extraction Wells Required for Site Extract Vapor & Groundwater Can Lower Groundwater Table to Address Vadose, Capillary Fringe & Saturated Zones Fixed Based Systems (Few Mobile Systems) Typical System is 2-20 GPM But Cannot Extract Vapors Cannot Destroy Hydrocarbon Vapors. Not Applicable For Vapors Extract Groundwater Only Can Only Remove Groundwater, No Vapor

  15. Comparisons ($$) CalClean HVDPE Standard S.V.E. Pump & Treat System Manned At All Times To Adjust Stinger Depths to Maximize Recovery No Capital Cost Outlay Closures Can Be attained Earlier (possibly in less than 1 year) No Trenching Needed No Shutdown Of Station No Long Time Commitment Needed For Use At A Site No Cost Of Decommissioning No Weekly O&M Cost(s) Faster Closures = Quicker Release of Liability System Unmanned, Cannot Adjust Depths In Extraction Wells High Capital Cost Closures Typically Take 5 to 30 Years Trenching Required Shutdown Station for 2 - 4 Weeks - Loss of earnings Long Term Commitment is Needed High Cost Of Decommissioning And Loss Of Value Of System High Weekly O&M Cost(s) Slower Closures = Long Term Liability System Unmanned, Cannot Adjust Depths in Extraction Wells High Capital Cost Closures Typically Take 3 to 10 Years Trenching Required Shutdown Station for 2 - 4 Weeks - Loss of earnings Long Term Commitment is Needed High Cost Of Decommissioning And Loss Of Value Of System Highly Weekly O&M Cost(s) Slower Closures = Long Time Liability

  16. Comparisons (misc.) CalClean HVDPE Standard S.V.E. Pump & Treat Can Mobilize to a Site Within Hours of a Call. Can Attack Source Immediately Can Startup At A Site Quickly Can pull offsite when concentrations Drop Off To Allow For Rebound Can Adjust Number of Days of Operation To Maximize Recovery Constant Onsite Monitoring of Influent Vapor Concentrations Occupies Space At Station Only During Onsite Operation Low Noise Operation (Great For Residential Areas) Typically Takes 9-15 Months To Install System - Allows Plume Size To Increase Takes Many Months Before Startup Cannot Pull Offsite since fixed Cannot Adjust Days of operation No Onsite Monitoring of Influent Vapor Concentrations Occupies Full-Time Space On Small Station Property High Noise Systems (Complaints From Neighbors) Typically Takes 6-15 Months to Install System - Allows Plume Size to Increase Takes Many Months Before Startup Cannot Pull Offsite since fixed Cannot Adjust Days of operation Not Applicable Occupies Full-Time Space On Small Station Property. Low Noise