CARSON CITY FREEWAY PHASE 2B-1

CARSON CITY FREEWAY PHASE 2B-1. PHASE 2A. PHASE 2. PHASE 2B. CARSON CITY FREEWAY – PHASE 2. PHASE 2A FUN RUN. PHASE 2B-1 MAJOR FEATURES CLEARVIEW TO FAIRVIEW DRIVE. Clearview Drive Bridge Koontz Lane Bridge Resurfacing of Edmonds Drive Intersection Clearview Drive Koontz Lane

Download Presentation

CARSON CITY FREEWAY PHASE 2B-1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CARSON CITY FREEWAY PHASE 2B-1 PHASE 2A PHASE 2 PHASE 2B

  2. CARSON CITY FREEWAY – PHASE 2

  3. PHASE 2A FUN RUN

  4. PHASE 2B-1 MAJOR FEATURESCLEARVIEW TO FAIRVIEW DRIVE • Clearview Drive Bridge • Koontz Lane Bridge • Resurfacing of Edmonds Drive Intersection • Clearview Drive • Koontz Lane • Closure of Valley View Drive • Closure of Colorado Street • Construct Cul-De-Sac • Drainage Facilities • Concrete Lined Channels and Box Culverts • Local Street Drainage • Landscaping – Topsoil and Hydroseeding of Disturbed Areas • Utility Relocations • Carson City Water Lines • Southwest Gas, NV Energy, AT & T and Charter Cable Estimated Construction Cost $15 Million

  5. CLEARVIEWDRIVE KOONTZ LANE VALLEY VIEW DRIVE LINE DRIVE R/W DRAINAGE CHANNEL S. EDMONDS DRIVE R/W

  6. COLORADOSTREET FAIRVIEW DRIVE INTERCHANGE R/W DRAINAGE CHANNEL S. EDMONDS DRIVE R/W

  7. CARSON CANYON AT KOONTZ LANE BRIDGE LANDSCAPING – CARSON CITY ENHANCEMENTS

  8. CARSON CITY FREEWAY – PHASE 2 Typical Section with Channel DRAINAGE CHANNEL EXISTING GROUND

  9. Native Landscaping Treatments

  10. PHASE 2B-1 UTILITIES UTILITY RELOCATIONS

  11. CLEARVIEWDRIVE R/W LINE DRIVE G AT & T TEMP. WATER LINE NV ENERGY DRAINAGE CHANNEL W TEMP. AT & T EDMONDS DRIVE R/W

  12. VALLEY VIEW DRIVE KOONTZ LANE R/W G W TEMP. WATER NV ENERGY TEMP. GAS DRAINAGE CHANNEL S. EDMONDS DRIVE R/W

  13. COLORADO STREET CLOSED VALLEY VIEW DRIVE CLOSED

  14. FAIRVIEW DRIVE US-395 FREEWAY CORRIDOR

  15. Questions & Answers