ROOF REPLACEMENT PROJECT. DOREEN CHRISTIAN La ROCHE OFFICE OF OPERATIONS PROJECT MANAGER. SCOPE OF WORK. Replace Central Section (A) Flat Roof, Whitten Building Replace Moat Area Roof, East & West Wings, Whitten Building Replace Court 5 Center & East Flat Roofs, South Building

carol
Download Presentation

ROOF REPLACEMENT PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROOF REPLACEMENT PROJECT DOREEN CHRISTIAN La ROCHE OFFICE OF OPERATIONS PROJECT MANAGER

  2. SCOPE OF WORK Replace Central Section (A) Flat Roof, Whitten Building Replace Moat Area Roof, East & West Wings, Whitten Building Replace Court 5 Center & East Flat Roofs, South Building Replace Moat Area roof, 6th Floor, South Building

  3. Central Section Roof Whitten Building

  4. Central Section Roof Whitten Building

  5. Court 5 Center Roof

  6. East Flat Roof

  7. South Building Moat Area

  8. Project Schedule & Costs • Award Date: September 30, 2007 • Construction Cost: $1.9 million • Notice to Proceed: October 30, 2007 • Project Completion: July 26, 2008

  9. Minimizing Disruptions • All work producing excessive noise will be done after hours, weekends and holidays. • Work on the Whitten Building’s east & west moat roofs, the contractor will access the roofs through the 4th floor restrooms and/or office space. Restrooms will be closed. • During construction, windows, AC units, and air intake vents will be covered to minimize odor.

  10. Affected Agencies Whitten Building • OC-Central Section Roof • OSEC • OES • OCR-Office of Native American Programs • OIG-East Wing Moats • OCIO-West Wing Moats South Building • OCFO-NFC Training Center-Court 5 Roof • OO-Printing Plant-East Flat Roof • FAS, FSA, RD, and NRCS-6th Floor Moat Area

  11. Environmental Initiatives • Root barriers will be installed allowing for installation of “green roofs”. • Existing roof ballast and concrete pavers will be re-used.

  12. Communications Plan • Briefings will be held with affected parties. • Occupants will be notified via e-mail prior to start of construction. • OO Webpage will be updated. • Signage will be placed in all construction areas. • Regular updates to agencies under construction area.

  13. Project Team • USDA Jodey Barnes-Edwards, Contracting Officer Doreen Christian La Roche, Contracting Officer’s Technical Representative, and Project Manager • Design Firm Setty & Associates • Construction Contractor Verrazano Contracting Co., Inc. • Construction Inspection Services Setty & Associates

  14. FAQ’s How will the contractor get materials to the roof? A crane and freight elevators will be used to move the materials to the construction area after hours, weekends and holidays. A staging area will be designated. Will there be noise/vibration during construction? Yes. However, this work will be done after hours, weekends and on holidays.

  15. FAQ’s Will any areas be off limits to employees during construction? Yes. Two restrooms (men’s) on the Whitten Building’s fourth floor. Some parking spaces may be impacted after hours, weekends, and holidays. Who is the point of contact for construction related matters? Doreen Christian La Roche, Project Manager Office of Operations, Design and Construction Division 202-720-5933.