BRTS LAHORE

BRTS LAHORE. 28.7 km ( Shahdra to Gajjumatta ). 27 stations (54 platforms). 8 at grade intersections. Depot Chungi Ghazi Qainchi Gulab Devi Kama Chowk Azadi Timber. Elevated Portion – 8.5 km (Muslim Town to Azadi Chowk ) – 9 stations. Planning and Execution.

ciro
Download Presentation

BRTS LAHORE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRTS LAHORE

  2. 28.7 km (Shahdra to Gajjumatta)

  3. 27 stations (54 platforms)

  4. 8 at grade intersections Depot Chungi Ghazi Qainchi Gulab Devi Kama Chowk Azadi Timber

  5. Elevated Portion – 8.5 km (Muslim Town to AzadiChowk) – 9 stations

  6. Planning and Execution • 9 PC-Is (Package 1 to Package 9) • Housing Department – Executing Department through TEPA (LDA) • Other Agencies involved – Urban Unit, Transport Planning Unit, NESPAK etc • Completed in Record Time – about 11 months • Total Cost – Over 30 billion PKR

  7. Technical Proposal STOP Financial Proposal Technical Proposal Technical Financial Proposal Financial Financial Bidding Process (Single-Stage: Two-Envelope) Approval Approval Deadline Preparation Evaluation 1 Evaluation 2

  8. Private Contractors • NLC • NESPAK • HABIB CONSTRUCTION • IKAN • SKB • ZKB • PGE • And others

  9. 45 Articulated Buses – operated by Albayrak (Turkish Firm)

  10. Fenced Corridor

  11. E-ticketing (Automated Fare Collection)

  12. Signal Priority System – Monotubes, Mast Arm Poles

  13. Pedestrian Push Buttons

  14. ITS (Intelligent Transportation System) • SIGNAL PRIORITY SYSTEM • COMMAND AND CONTROL CENTRE • SCATS – AUSTRALIAN SYSTEM

  15. System Overview Command & Control Center Video Walls PTZ =20 Core Network Intersections =08 Public Address System Stations =27 PTZ = 4 BOX = 6 Video Recorders, Servers, Storages Stations =27 Workstations

  16. CCTV/ PAS/ ITS Connectivity Command & Control Center Station Station Station Intersections Station GPON-Fiber (SMF) Station Station Station Station Station Station

  17. Communication Network(GPON) • Primary: • 48 core single mode • Secondary • 12 core single mode • Communication network • Primary communication • Gigabit Passive Optical Network (GPON) • Secondary communication • Any service provider e.g. PTCL etc. • An RJ-45 node will be provided at each Intersections/Stations

  18. Cameras

  19. PTZ & Box Camera (Outdoor) Heavy Duty • 1-1.3Mega Pixel • IP Based • IP-66 compliant

  20. Ethernet Switch • Remotely manageable at Command & Control Center • 10/100BaseT • 10/100/1000BaseT (combo) for uplink • Operating Temperature -10oC to +60oC

  21. Video Wall • Projection of all PTZ & Box cameras • MBS Stations, corridor • ITS Intersections • 55”(8 x3) Matrix

  22. Screen Management Console • Video wall management • Input / output screen management • Decode IP to VGA/DVI/HDMI • Video projection of cameras.

  23. Installations at station • Cameras (PTZ & Box): • Installation of station cameras using foiled twisted pair cable (FTP) CAT-6 • Station Cabinets: • Installation of station cabinets for data network communication. • Installation of high environmental temperature resistant Ethernet switches for communication

  24. Public Address System • Installation of Public Address System : • Voice amplification system at each platform. • Outdoor speakers at each platform & pedestrian bridges • Provision to playback Pre-Recorded Voice for public • Provision for custom announcement through MBS staff for general purpose as well as in case of emergency etc.

  25. Power at (Intersection / Stations) • Power at stations through: • National power grid • Standby power generator • At each station • UPS • 15 kVA for IT & other equipments • Power at intersections • Power supply from nearby MBS station / lines • UPS at intersection for ITS

  26. Cabinets • At Intersections • ITS cabinets will be used for the installation of Ethernet switches, camera termination etc. • At Stations • IT communication cabinets at each MBS station for Ethernet switches, camera termination, etc.

  27. Drawings • Stations • Intersections

  28. CCTV / Public Address System for MBS Station Drawings

  29. Inauguration – 10 Feb 2013

  30. Command and Control System

  31. Ridership – 125000 pax per day

  32. Political Will – The real motive