WRWSA Water Supply Plan Update Progress Report – (February-March 2013)

Project Tasks Water Demand Estimates Availability of Ground- and Surface Water Conservation and Reclaimed Water Strategies Water Supply Project Options Water Supply Project Configurations Facility Integration Plan Governance Facilitation of Technical Advisory Committee.

Download Presentation

WRWSA Water Supply Plan Update Progress Report – (February-March 2013)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Tasks • Water Demand Estimates • Availability of Ground- and Surface Water • Conservation and Reclaimed Water Strategies • Water Supply Project Options • Water Supply Project Configurations • Facility Integration Plan • Governance • Facilitation of Technical Advisory Committee WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)

  2. Project Tasks • Water Demand Estimates • Availability of Ground- and Surface Water • Conservation and Reclaimed Water Strategies • Water Supply Project Options • Water Supply Project Configurations • Facility Integration Plan • Governance • Facilitation of Technical Advisory Committee WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)

  3. Project Tasks • Water Demand Estimates • Met with representatives of SWFWMD and SJRWMD to coordinate demand projections methodologies • Worked with Districts to acquire all data necessary to complete projections • Completed summary of tables and graphs for TAC review • Completed entire Chapter for insertion into report WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)

  4. Project Tasks • Availability of Ground- and Surface Water • Met with staff from the Districts to determine how they will use regional groundwater models during the next year to evaluate groundwater availability. • Determined that the Districts will provide Cardno with the regional model to determine impacts of proposed wellfieldson water resources and MFL waterbodies. WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)

  5. Project Tasks • Conservation and Reclaimed Water Strategies • Evaluated Florida’s EZ Guide Water Conservation Model and determined which data would be required to run the model to evaluate conservation potential for each utility • Obtained comprehensive reclaimed water data from the SWFWMD to begin the process of projecting the quantity of reclaimed water that will be available to offset demand through 2035. WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)

  6. Project Tasks • Facilitation of Technical Advisory Committee • Constituted the membership of the TAC • Determined how the meetings will be structured, dates of meetings, and discussion topics. • Scheduled first meeting for April 24th. WRWSA Water Supply Plan UpdateProgress Report – (February-March 2013)