1 / 10

Manufacturing Solutions- Spinning

TexManage. Manufacturing Solutions- Spinning. TexManage. Spinning. Covers all operations of Ring Spinning, Open-End and Knitting. TexManage. Modules. Manufacturing Solutions. Production Planning. Production Management. Product Costing. Manufacturing Modules. Quality Management.

collinj
Download Presentation

Manufacturing Solutions- Spinning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TexManage Manufacturing Solutions- Spinning

  2. TexManage Spinning Covers all operations of Ring Spinning, Open-End and Knitting TexManage

  3. Modules Manufacturing Solutions Production Planning Production Management Product Costing Manufacturing Modules Quality Management Maintenance Management Raw material Management TexManage

  4. Production Planning • Planning Characteristics • Planning based on • Product Characteristics • Process Route • Raw material • InteractiveSpin Plan :selection of right product mix • Rules based allocation for each product (Ratio, fixed machinery, priority based machinery allocation) • Forward and Backward Planning; Planning adjusted to maintenance calendar • Output: Man power required, machinery required and material required • Product Data Base: Product wise, machine wise process details like speed, settings, etc. • Vendor Planning • Integration with Production and Sales Sales Orders Sales Plan Manufacturing Plan Spin Plan Production Program Plan Status TexManage

  5. Product Costing • Target Costing • Target Costing for a Sales plan / Forecast • Detailed basis of costing for Revenue and Expense cost elements • Integration with Planning • “What if Analysis” for Profit optimisation • Quick cost work out for Sale enquiry • Output: Profit per kg; Profit per m; profit per machine day • Actual Costing • Period Specific Actual cost calculation • Comparison of Actual Costing Vs Target Costing • Identification of weak cost elements • Daily Profit/ Loss statement Target Costing Actual Costing Target Vs Actual Department wise Contribution Daily Profit & Loss TexManage

  6. Production Management • Production Functions of • Spinning Preparatory • Spinning (OE & Ring Spinning) • Post Spinning including Yarn Dyeing • Lot/ sub lot concept to track from packed material to raw material for quality analysis including customer complaints • Production Booking of all processes through any input, Kg., hank meters, run hours, etc. • Yarn Realisation and In- Process stock • Operator performance Analysis • Waste Inventory and Analysis • Provision to Link to Automatic data collection systems • Productivity Analysis • Accessories planning for a count change Planning Production Program Produce Material, Men, Machinery, Waste Lot Status TexManage

  7. Raw Material Management Floating of enquiries based on requirement and receiving offers Sample Testing: Testing of material and passing based on standards (sample plan included) Purchase Orders: Raising PO / advice including delivery schedule and quantity Lot Testing: Bulk testing of material and passing based on sample/ standard results (sample plan included) Lot Approval: Based on Quality, acceptance of lots to a mix including reallocation to other mixes than intended Integration with Finance on payment advice and also premium / discount based on quality Mix Issue: Interface with Manufacturing for request and issue of RM including waste addition Inventory Status: Fibre, variety, station, crop year, supplier, station, quality wise, contamination Samples Bulk Inspection & Passing Stock Issue TexManage

  8. Quality Management Scheduling for Quality Control Activities and tracking Maintenance of In- Process study results, process control results (spinning: wrapping) Maintenance of Laboratory experiments and results Statistical Analysis: To conclude process deviations and for interpretation of test results Customer Interface: Requirements & Complaints handling Quality tracking: Lot history Process parameters Data base & Utilisation of manpower & machinery Analysis Tool: Trends and graphs Provision to Link to Automatic data collection system Schedule Lab/ Process/ Wrapping/ Final Analysis Q Action Improve TexManage

  9. Maintenance Management • Budgetary and Tracking of various maintenance activities • Scheduling and monitoring • Preventive • Routine • Contractual • Work Flow based operations • Maintenance based on pre - defined quality ,production parameters and flow meter inputs • Break Down: Reporting, Responsive and Analysis • Machine Bio-Data • Supportive Check list for carrying out all maintenance activities • Consumption Analysis: Machine wise, Yearly per spindle • Utilities- Performance & Schedules Budget Schedule Activity Breakdowns Utilities TexManage

  10. Thank you 40, Thasami Park, Singanallur, Coimbatore -641 005 Ph: +91 422 3233345   Fax: +91 422 4348479 Email: info@indotexnology.com, Thirupathi@indotexnology.com Also: texmanage@indotexnology.com

More Related