1 / 4

CI Define Stage: Line 16

CI Define Stage: Line 16. CI Measure Stage: Line 16. All Products (Mins). Hot 'n' Spicy (Mins). CI Project Plan: Line 16. CI Observations – Line 16. Line 16 – Opportunities Unrealistic run rates in SAP/SKEP Sieve sizes Running speed of screw Tote tipping process

conaway
Download Presentation

CI Define Stage: Line 16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CI Define Stage: Line 16

  2. CI Measure Stage: Line 16 All Products (Mins) Hot 'n' Spicy (Mins)

  3. CI Project Plan: Line 16

  4. CI Observations – Line 16 Line 16 – Opportunities • Unrealistic run rates in SAP/SKEP • Sieve sizes • Running speed of screw • Tote tipping process • Line stopping for breaks • Line stopping for checks • Set-up manuals • Dry cleans - correct tools for the job • Condition of material • Resource for clean downs and changeovers • Availability and speed of MHE • Availability of PC Quick Wins/WIP • 2 PC’s on the line  • Cross training to cover breaks  • A ‘fix it’ manual for all recorded problems  • Run rate analysis  • Resource for changeovers  • New manual with correct set up/run rate info • Gap analysis for all SKU’s for throughput differences between line 16 & 17  • Spending time on the line ( tweaking tipping method, increasing running speed, sieves etc) • Continue weekly measures shown on the line Next Steps • Focus on set ups and dry cleans • Line 17 analysis

More Related