Magellan technical updates, Pasadena April 2006 – September 2006. Instrument Development. Meetings with instrument teams catch interface problems Telescope Guiders Computing Logistics Observatory learns about design, construction, and maintenance requirements. Instrument Development.

cora
Download Presentation

Magellan technical updates, Pasadena April 2006 – September 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Magellan technical updates, PasadenaApril 2006 – September 2006

  2. Instrument Development • Meetings with instrument teams catch interface problems • Telescope • Guiders • Computing • Logistics • Observatory learns about design, construction, and maintenance requirements

  3. Instrument Development • PISCO (Parallel Imager for Southern Cosmology Obsv’ns) • Chris Stubbs, Tony Stark, Will High • In design • PFS (Planet Finding Spectrograph) • Paul Butler, Steve Shectman, Jeff Crane • Halfway thorough construction

  4. Instrument Development • MagE (Magellan Echellette) • Scott Burles, Ian Thompson, Steve Shectman • Early construction • FIRE (Folded port Infrared Echellette) • Rob Simcoe, Adam Burgasser • PDR soon

  5. Instrument Development • FourStar (4K IR imager) • Eric Persson, David Murphy, JHU/IDG • CDR soon • Mosaic2 (second CCD dewar for IMACS) • Alan Dressler, Ian Thompson, Pat McCarthy, Alan Uomoto • CCDs ordered; construction starting soon

  6. Instrument Development • WFC (Wide Field Corrector for f/5) • Andy Szentgyorgyi • Construction almost finished

  7. Instrument deployments • MMTF (Maryland-Magellan Tunable Filter) • Sylvain Veilleux, Ben Weiner, Alan Dressler, OCIW engineering • Successful installation and testing • Further engineering this semester • http://www.astro.umd.edu/~bjw/mmtf/

  8. MMTF N4945 Hα, 20Å, 15 min exp

  9. Instrument deployments • POETS (Portable Occultation Eclipse and Transit System) • Jim Elliot, Alycia Weinberger, Mercedes López-Morales, David Osip • Successful speckle tests LLL mode (Weinberger) • Successful photometric transit observations (López-Morales )

  10. F/5 secondary mirror • Mirror is being integrated onto the polishing cell at SOML • Approximate finish date is mid-2007 • Expect 2007B engineering on Clay (baffles, testing)

  11. Guider upgrades • Charlie Hull, Jose Soto • New lead screws for finer position control • Modifications to improve reliability • New motion actuator designs • Better cable routing and strain relief • Testing this year

  12. Bibliography • 186 refereed publications total