An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. San Jose Creek - Goleta

  2. Review Structure of the Flood Control District • Review San Jose Creek Process / History • Review Projects in the South Coast • Review work in the Goleta Area San Jose Creek 1995

  3. SOUTH COAST FLOOD ZONE

  4. South Coast Flood Zone RevenueFY 08/09 Taxes $4,506,000 Benefit Assessment $1,766,000 Total* $6,272,000 * Addt’l Interest & Fees

  5. 1996 Flood Control Assessment Ballot

  6. South Coast 1996 Ballot

  7. San Jose Creek Project History • Carry on From Goleta Old Town Infrastructure Plan (GOTIP); • San Jose Creek Capacity Improvements • Ekwell / Fowler Improvements • Hollister Ave, Bridge, roundabout • Landscape / Signals • Project Continued by City of Goleta • Outside Funding Sources • Originally, no outside funding needed

  8. Recent Events • City of Goleta forwards a project to; • Replace Hollister Ave Bridge • Increase Capacity of San Jose Channel Downstream of Hollister • Funding Request to Flood Control District made by City of Goleta • Board Approves CEO / PWD to negotiate MOU for partial funding • Channel modifications to include fish passage

  9. Other Projects – Goleta Area Las Vegas / San Pedro Creeks

  10. Goleta Slough DredgingSediment Basins Tecolotito Carneros San Pedro San Jose Atascadero

  11. Goleta Slough Dredging

  12. Goleta Slough Dredging

  13. Other Maintenance Work Devreaux Creek – Winter 2008

  14. Questions