1 / 29

Accelerators COSY and HESR

Accelerators COSY and HESR. March 15, 2013 | Andreas Lehrach. Outline. I ntroduction C ooler S ynchrotron COSY Prototyping and Accelerator Physics Polarized Beams Preparation for Storage Ring EDM H igh- E nergy S torage R ing HESR Beam Dynamics Simulations Design Work

darius
Download Presentation

Accelerators COSY and HESR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Accelerators COSY and HESR March 15, 2013 | Andreas Lehrach

  2. Outline Introduction Cooler Synchrotron COSY Prototyping and Accelerator Physics Polarized Beams Preparation for Storage Ring EDM High-Energy Storage Ring HESR Beam Dynamics Simulations Design Work Summary/Outlook

  3. Cooler Synchrotron COSY Siberian Snake Ions: (pol. & unpol.) p and d Momentum:300/600 to 3700 MeV/c for p/d, respectively Circumference of the ring: 184m Electron Cooling up to 550 MeV/c Stochastic Cooling above 1.5 GeV/c 2MV Electron Cooler  Major Upgrades

  4. Prototyping and Accelerator Physics Siberian Snake (2013) Pellet Target Residual Gas Profile Monitor RF Dipole WASA Barrier Bucket Cavity Stochastic Cooling 2 MeV e-Cooler (2012/13) RF Solenoid

  5. Magnetized High-Energy Electron Cooling: Development Steps HESR: 4.5 MeV COSY: from 0.1 MeV to 2 MeV Upgradable to 8 MeV • Technological challenge • Benchmarking of cooling forces Installation at COSY started

  6. Example: Beam Cooling with WASA Pellet Target • Injected beam • Beam heated by target • + stochastic cooling • d) + barrier bucket

  7. Polarized Beams at COSY Tune-Jump Polarization during acceleration Qy 9-Qy 7-Qy DQy 0+Qy gG=5 2+Qy gG=6 8-Qy gG=4 10-Qy 1+Qy • Length 0.6 m • Max. current ±3100 A • Max gradient 0.45 T/m • Rise time 10 μs Intrinsic resonances  tune jumps Imperfection resonances  vertical orbit excitation P > 75% at 3.3 GeV/c

  8. Physics at COSY using longitudinally polarized beams: Snake Concept • Should allow for flexible use at two locations • Fast ramping <30s • Integral long. field >4.7 T m • Cryogen-free system? ANKE ANKE PAX PAX

  9. Siberian Snake at COSY Superconducting 4.7 Tm solenoid is ordered. Overall length: 1 m Ramping time 30 s Spin dynamics and longitudinal polarized beams for experiments Installation at COSY in summer 2013

  10. Polarization of a Stored Beam by Spin-Filtering COSY Cycle / schematic Experiment with COSY / schematic Spin- flipper Results COSY Cycle • Stacking injection at 45 MeV • Electron cooling on • Acceleration to 49.3 MeV • Start of spin-filter cycleat PAX: 16 000 s • PAX ABS off • ANKE cluster target on • Polarization measurement (2 500 s) at ANKE • Spin flips with RF Solenoid • New cycle: different direction of target polarization

  11. Facility for Antiproton and Ion Research SIS18 SIS100 p-Linac HESR Antiprotonen Production Target Linac: 70MeV protons, 70mA, ≤4Hz SIS 18: 5·1012 protons/cycle SIS 100: 4·1013 protons/cycle 29GeV protons bunch compressed to 50nsec Production target:2·108 antiprotons/cycle 3% momentum spread CR: bunch rotation and stochastic cooling at 3.8GeV/c, 10s RESR: accumulation at 3.8GeV/c CR/RESR

  12. HESR with PANDA and Electron Cooler COSY HESR Jülich is the leading lab of the HESR Consortium: Germany (Jülich (90%), GSI, Mainz), Slovenia and Romania

  13. HESR design driven by the requirements of PANDA: Antiprotons with 1.5 GeV/c ≤ p ≤ 15 GeV/c High luminosity: 2·1032 cm-2s-1 Thick targets: 4·1015 cm-2 High momentum resolution: Δp/p ≤ 4·10-5 Phase space cooling Long beam life time: >30 min Criteria for the Layout of the HESR

  14. Beam Dynamics Simulations • Beam injection and accumulation: stacking injection concept (Simulation codes by T. Katayama and H. Stockhorst) • Dynamic aperture calculations and closed-orbit correction: steering and multipole correction concept (MAD-X, SIMBAD based on ORBIT) • Beam losses at internal targets / luminosity estimations: particle losses (hadronic, single Coulomb, energy straggling, single intra-beam) (Analytic formulas) • Beam-cooling / beam-target interaction / intra-beam scattering: beam equilibria (BetaCool, MOCAC, PTARGET, Jülich stochastic cooling code) • Ring impedance: RF cavities, kicker etc. (SIMBAD based on ORBIT) • Trapped ions: discontinuity of vacuum chamber, clearing electrodes (Analytic codes)

  15. Injection and Accumulation Beam accumulation in HESR required for modularized FAIR start version • Barrier Bucket and stochastic cooling will be used to accumulate antiprotons in HESR • Proof of principle measurement

  16. Future HESR Upgrade Options Polarized Proton-Antiprotons Collider 15 GeV/c – 3.5 GeV/c Spin Filtering Antiproton Polarizer (APR) Asymmetric Collider Polarized Electron-Nucleon Collider ENC Accelerator Working Group:

  17. Summary / Outlook Prototyping and Accelerator Physics at COSY Detector tests for PANDA and CBM Preparation for HESR: High-Energy Electron Cooling and High-Bandwidth Stochastic Cooling Internal Targets, RF Manipulation techniques  COSY is essential to develop and establish these techniques for HESR Polarized beams at COSY Polarizing stored Antiprotons by spin-filtering R&D work for storage ring EDM searches of charged particles First direct EDM measurement, ideal EDM injector  COSY is essential to perform R&D work for PAX and EDM HESR project status New HESR beam accumulation scheme due to modularized start version of FAIR Design work of the HESR is finalized and the construction phase started Main HESR components are ordered (dipoles, quadrupoles, ... )  corresponds to roughly 30% of total project costs

  18. Siberian Snake spin rotation spin- and particle motion χ • Fullsnake:χ= 180° νsp = ½ • Spin tune independent of beam energy • No spin resonances except snake resonances: • νsp = ½ = k ± l∙Qx± m∙Qy • Partial snake:χ< 180° νsp≠ k • Keeps the spin tune away from integer • No imperfection resonances

  19. New 2 MV Electron Cooler at COSY BINP Novosibirsk • Energy Range: 0.025 ... 2 MeV • High-Voltage Stability: < 10-4 • Electron Current: 0.1 ... 3 A • Electron Beam Diameter: 10 ... 30 mm • Cooling section length: 2.694 m • Magnetic field (cooling section): 0.5 ... 2 kG Installation at COSY started

  20. Stochastic Cooling System • Cooling Bandwidth (2 – 4) GHz • Pickup and Kicker Structures: Circular Slot Type Couplers*) • Aperture 90 mm • Length per cell 12.5 mm • 88 pickup cells • Total length: 1100 mm • Zero dispersion at pickup and kicker • Noise temperature pickup plus equivalent amplifier noise: 40 K • Momentum range 1.5 GeV/c to 15 GeV/c • Above 3.8 GeV/c: Filter Cooling • Below 3.8 GeV/c: TOF Cooling R. Stassen, FZJ

  21. Spin Manipulation in COSY • Jump Quadrupole • Air coil, length 0.6 m • Current ±3100 A, gradient 0.45 T/m • Rise time 10 μs, fall time 10 to 40 ms • RF Solenoid • Water-cooled copper coil in a copper box, length 0.6 m • Frequency range roughly 0.6 to 1.6 MHz • Integrated field ∫Brms dl ~ 1 T·mm • RF Dipole • 8-turn water-cooled copper coil in a ferrite box , length 0.6 m • Frequency range roughly 0.12 to 1.6 MHz • Integrated field ∫Brms dl ~ 0.1 T·mm • Siberian Snake (ordered) • Fast-Ramping Superconducting Solenoid, length 0.98m • Ramp time to maximum 30s • Integrated field ∫Brms dl = 0.47 Tm

  22. COSY Upgrade 1. Improved closed-orbit control system for orbit correction in the micrometer range  Increasing the stability of correction-dipole power supplies  Increase number of correction dipoles and beam-position monitors (BPMs)  Improve BPM accuracy, limited by electronic offset and amplifier linearity  Systematic errors of the orbit measurement (e.g., temperature drift) 2. Alignment of Magnets and BPMs  More precise alignment of the quadrupole and sextupole magnets  BPMs have to be aligned with respect to the magnetic axis of these magnets 3. Beam oscillations  Excited by vibrations of magnetic fields induced by the jitter of power supplies  Coherent beam oscillation 4. Longitudinal and transverse wake fields  Ring impedances

  23. HESR Layout Main machine parameter Momentum range 1.5 to 15 GeV/c Circumference 574 m Magnetic bending power 50 Tm Dipole ramp 25 mT/s Acceleration rate 0.2 (GeV/c)/s Geometrical acceptances for βt = 2 m horizontal 4.9 mm mrad vertical 5.7 mm mrad Momentum acceptance ± 2.5×10-3

  24. Dipoles Number 44 Magnetic length 4.2 m Deflection angle 8.182° Max B-field 1.7 T Min B-field 0.17 T Aperture 100 mm Quadrupoles Number 84 Magnetic length 0.6 m Iron length (arc) 0.58 m Max gradient 20 T/m Aperture 100 mm

  25. Luminosity Considerations (Full FAIR version) Antiproton production rate: 2·107 /s Pellet target: nt=4·1015 cm-2 Transverse beam emittance: 1mm·mrad Longitudinal ring acceptance: Δp/p = ±10-3 Betatron amplitude at PANDA: 1m Circulating antiprotons: 1011 Cycle averaged luminosity - Momentum 1.5 GeV/c: 0.3– 0.7 · 1032 cm-2s-1 - Momentum: 15 GeV/c: 1.5– 1.6 · 1032cm-2s-1 (Production rate: 1 – 2 · 107 /s) A. Lehrach et al., NIMA 561 (2006) O. Boine-Frankenheim et al., 560 (2006) F. Hinterberger, Jül-4206 (2006)

  26. Cooled Beam Equilibria Beam cooling, beam-target interactions, intra-beam scattering rms relative momentum spread p/p • Electron cooled beams • HR mode:7.9·10-6(1.5 GeV/c) to 2.7·10-5 (8.9 GeV/c), and 1·10-4 (15 GeV/c) • HL mode:<10-4 • Stochastic cooled beams • HR mode:5.1·10-5 (3.8 GeV/c), 5.4·10-5 (8.9 GeV/c), and 3.9·10-5 (15 GeV/c) • HL mode: ~10-4 • Transverse stochastic cooling can be adjusted independently D. Reistad et al:, Proc. of the Workshop on Beam Cooling and Related Topics COOL2007, MOA2C05, 44 (2007) O. Boine-Frankenheim et al., A 560 (2006) 245–255 H. Stockhorst et al., Proc. of the European Accelerator Conference EPAC2008, THPP055, 3491 (2008).

  27. Expected Pressure Distribution and Neutralization Factor PANDA IP The mean time for residual gas ions in the antiproton beam Tc (clearing time) in relation to the time of ion production Tp: Average distance of clearing electrodes of 10 m, with a clearing voltage of 200 V  Emittance Growth  Incoherent Tune Shift  Beam Instabilities

  28. Coherent Beam Instabilities Resonance frequencies: (8 − Qx) = 0.4005 and (8 − Qy) = 0.3784, (9 − Qx) = 1.4005 and (9 − Qy) = 1.3784 Bounce frequencies of transverse H+2 ion oscillations represented as tune numbers qx,y horizontal vertical Beam momentum p = 15 GeV/c Estimates for beam instabilities F. Hinterberger, Ion Trapping in the High-Energy Storage Ring HESR, JÜL-Report 4343 (2011)

  29. Dynamic Aperture (Optimized) Dynamic Aperture 16 mm mrad Orbit diffusion coefficient D Orbit diffusion coefficient (e.g. after 1000 and 2000 turns):

More Related