An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms UCSB HEP Group CMS 4-Hybrid Test System Sam Burke EE

  2. Status • UCSB 4-Hybrid Thermal Test system is operational • ARCS and ACDC software integrated so that test is a “one button” operation CMS 4-Hybrid Test System Sam Burke EE

  3. Setup in UCSB Clean Room CMS 4-Hybrid Test System Sam Burke EE

  4. UCSB Cold Box CMS 4-Hybrid Test System Sam Burke EE

  5. Installing Hybrid/PA’s CMS 4-Hybrid Test System Sam Burke EE

  6. Pulser: Functional • Pulser had been triggering on noise. Needs to be synchronized with ARC Clock . • Twisted cable from ARC Controller card used • Eliminated noise in UCSB LVDS/CMOS Converter • No LVDS signals from ARC Controller Card CMS 4-Hybrid Test System Sam Burke EE

  7. LVDS Signal? • ARC Boards with functioning External Bus • Ser 29 • Ser 31 • ARC Boards with non-functioning External Bus • Ser 56 • Ser 57 • Ser 59 LVDS Signal Noise CMS 4-Hybrid Test System Sam Burke EE

  8. ARC Controller Problem • Bad Batch of ARC BOARDS: LVDS Driver and LVDS Receiver U32 and U33 were switched during board assembly. Problem was never discovered. • External Buss connector and associated IC’s on lower left of photo. U32 CMS 4-Hybrid Test System Sam Burke EE

  9. With Pulser Operational… • Opens detectable in “Scope Mode” Intentionally Plucked Bonds Show up in Pedestal Profile CMS 4-Hybrid Test System Sam Burke EE

  10. With Pulser Operational…. • Opens are also detectable in Pedestal & Noise Test Plucked Bonds CMS 4-Hybrid Test System Sam Burke EE

  11. Grounding Issues Huge spikes in noise at APV edges Same Problem CERN was having…. CMS 4-Hybrid Test System Sam Burke EE

  12. Using their same method… Ground lines connected to Support plate by silver strip Problem Solved: No more spikes CMS 4-Hybrid Test System Sam Burke EE

  13. Thermal Cycle Test Test Time: ~42 min. Three Sets of Tests: • Pedestal & Noise • Pulser • Short Detection CMS 4-Hybrid Test System Sam Burke EE

  14. Automated Test Results Final Report After Thermal Cycle Test: Lists -Shorts -Opens -Noisy Channels CMS 4-Hybrid Test System Sam Burke EE

  15. So Far At UCSB 6 Hybrids Bonded and Thermal Cycled Serial # Shorts Opens Failure at -20 30216711300712 30216711600699 30216711500720 30216711500730 30216711500732 30216711500733 No 0 0 No 0 0 No 0 0 No 0 0 0 0 No 0 No 0 CMS 4-Hybrid Test System Sam Burke EE

  16. And Now… • Building a new peltier plate in order to bring test time down • Goal: Loading + Testing + Unloading in ~50 minutes Nevertheless, ready to thermal test on mass scale CMS 4-Hybrid Test System Sam Burke EE