An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3-Dimensional Views Existing spillway construction

  2. 3-Dimensional Views First concrete pour inside spillway (summer 2013)

  3. 3-Dimensional Views New concrete pier extensions (summer 2014) This work takes place “in the dry” behind a sheet pile cofferdam

  4. 3-Dimensional Views Stoplogs are placed between piers & rest on new concrete sills Once stoplogs are in place water levels can be returned to normal

  5. 3-Dimensional Views Construction work taking place between 2015 and 2016 Existing gate and bridge are removed More concrete is poured in the base of the spillway

  6. 3-Dimensional Views Construction work taking place between 2015 and 2016 Concrete rollaway slabs and most of upstream barrel arches are removed

  7. 3-Dimensional Views Construction work taking place between 2015 and 2016 New concrete crest is poured

  8. 3-Dimensional Views Construction work taking place between 2015 and 2016 Concrete overlay is placed over entire pier structure

  9. 3-Dimensional Views Construction work taking place between 2015 and 2016 New bridge is constructed

  10. 3-Dimensional Views Tobacco Spillway to be completed in 2016 New gate is installed and stoplogs are removed

  11. 3-Dimensional Comparison Existing spillway Modified spillway