Integrated Project
Download
1 / 7

Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads” - PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on

Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads” Tamas Lovas & Arpad Barsi Budapest University of Technology and Economics [email protected], [email protected] SAFESPOT. Editor work in D2.3. 2. Feels like we’ve been slowed down 

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads”' - dionne


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Integrated Project

Co-operative Systems for Road Safety

“Smart Vehicles on Smart Roads”

Tamas Lovas & Arpad Barsi

Budapest University of Technology and Economics

[email protected], [email protected]

SAFESPOT


Editor work in d2 3 2
Editor work in D2.3.2

  • Feels like we’ve been slowed down 

  • Hope to speed up as it happened after Helsinki! 

  • No new materials, no improvement in the final deliverable

  • Strict deadlines: editing needs more time before submission!


Group t2 3 1
Group T2.3.1

  • Participants (responsible persons)

    • BME (task leader)

      • Arpad Barsi, Tamas Lovas

    • VTT (WP3 leader)

      • Matti Kutila, Jukka Laitinen

    • Mizar

      • Angela Spence, Domenico Zagari

    • IBEO

      • Florian Ahlers

    • ISMB

      • Dario Galleano

    • LCPC

      • Nicolas Hautière

    • TeleAtlas

      • Christine Bartels

    • Peek?

      • Siebe Turksma


Actions relevant to t2 3 1
Actions relevant to T2.3.1

Skype conference call on 13 Mar 2007


Work in t2 3 1 after torino 2007
Work in T2.3.1 after Torino 2007

  • Final (revised and modified) Sensor selection

    • Camera (NIR, CCTV); VTT, LCPC, CIDAUT

    • Laserscanner; IBEO

    • RFID; BME

    • WSN; Mizar/ISMB

  • Extended sensor specification

    • New parameters in detailed specification table

      • Required computation power, communication protocol, communication media

      • Height from ground, orientation, distance from roadway, distance of each other (in case of more sensors)

    • Cost issue


Costs
Costs

  • Cost of sensor and additional equipments (computer, communication unit, extra storage, protection etc.)

  • Installation cost (per sensor and per Safespot, thus the number of sensors in a Safespot (e.g. in a junction) have to be decided). Please provide the estimated time and number of people for the installation.

  • Maintenance cost (per year, per event, when? what type of maintenance is expected?)

  • Overall cost of a sample Safespot (e.g. sample junction presented inTorino) with your required sensors


How to proceed in t2 3 1
How to proceed in T2.3.1?

  • Requests from T2.3.2 & T2.3.3?

    • E.g. output data specs

  • Suggestions from sensor providers?

    • What need to be specified?

  • Are all the applications supported by the selected/specified sensors?


ad