MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center. Mission Success Page 2 . Summary. Mission SuccessEven with Fully Redundant S/C buses, the continuing Phase I

doris
Download Presentation

Dick Bolt Code 302 May 13-17, 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    2. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 2 Summary Mission Success Even with Fully Redundant S/C buses, the continuing Phase I & II operation is expected to have low probability of completing the full four (4) Year mission Design Considerations Hub S/C Recommend either redundant Laser ranger devices or Laser beams from at least (2) separate Laser devices of both wide & narrow beam Detector S/C Redundant design looks good Free Flyer S/Cs Redundant design looks good Mission Success Alternatives From a Reliability standpoint, other designs should be considered Two separate Detector S/C (single string) with: Single Hub S/C (Fully Redundant) with Free Flyers or: Two separate Hubs ( single string ) without Free Flyers R&S Support Cost 1 Million $ To support both Reliability & System Safety effort for at least 3 years

    3. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 3 Assumptions Mission Length Phase I Mission length to be 1 Yr with Phase II to follow. Six (6) Months to get in orbit Phase II Mission length to be 3 Yrs / 5 Year Goal Total ( Phase I & II ) Four (4) Years with 5 Year Goal Redundancy Hub S/C –-Put Redundancy into Hub design & not Free Flyer Detector S/C –Fully redundant design needed

    4. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 4 S/C Components Phase I Lens S/C (Hub) Tunable X-Ray Optical System Star Tracker S/C Bus Propulsion System ACS Laser Ranger to Detector S/C Six(6) attached Free Flyers acting as extra X-Ray reflectors Detector S/C RF Com to Earth Propulsion System ACS ############################################## Phase II Lens S/C (Hub) Tunable X-Ray Optical System Star Tracker S/C Bus Propulsion System ACS Laser Ranger Detachable Lens sections ( 6 units ) Release Mech. Tunable X-Ray Optical System Detector S/C Super Star Tracker Cryo Cooler RF Com to Earth Propulsion System ACS

    5. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 5 Reliability Block Diagram Phase I

    6. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 6 Reliability Block Diagram Phase II

    7. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 7 Quick Mission Reliability Estimate Phase I Best Case Est. Mode I ( 2 Yr Mission ) 1? Without LV & Injector Prop. : .9 X.98 X.9 X.98 = 78% @ 1 Yr With LV & Injector Prop.: .78 X .94 X .99 = 72 % @ 1 Yr Phase I & II Best Case Est. Mode I & II ( 4 Yr Mission Total ) Without LV & Injector Prop. : .9 X.95 X.9 X.95 = 63% @ 4 Yrs With LV & Injector Prop.: .63 X .94 X .99 = 58.6% @ 4 Yrs LV=Launch Vehicle

    8. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 8 Launch Vehicle Delta IV 94% Launch success Est. by Mfg. Air Force committed to future launches 1st stage is new design Hydrazine Propulsion L-2 Orbit Injection System No Reliability info, assume similar to S/C Hydrazine propulsion system 99% or better

    9. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 9 Deployments Hub S/C Laser Lens Cap 6 Detachable Free Flyers Detector S/C 2 RF X-Band High Gain (dish) Antennas Free Flyer S/Cs None on S/C Separation Systems Separation of Hydrazine Propulsion Orbit Insertion System Separation of Hub from Detector & attached Free Flyers Separation of Six(6) separate Free Flyer units from the Hub

    10. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 10

    11. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 11 Back-Up Slides See RSDO S/C Bus Reliability Information Graph

    12. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 12

    13. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 13

    14. MAXIM-PF, May 13-17, 2002 Goddard Space Flight Center Mission Success Page 14 RSDO S/C Bus Reliability For Four (4) Year Mission