130 likes | 134 Views
POINT8 – NEW BUILDING FOR LHCb (Upgrade ). SX8. SX8 (B). SUX8. POINT 8. 1 st Iteration. New building with 1 floor ( sous -sol + Rez -de- Chauss ée +1 étage. ~ 8 m. ~ 24 m max. ~ 9 m. Volume : 24 x 9 x 8 m3 (2 levels). DRAFT. PX84. CREATION NEW SURFACES
E N D
POINT8 – NEW BUILDING FOR LHCb (Upgrade) SX8 SX8 (B) SUX8 POINT 8 D.LACARRERE
1stIteration • New building with 1 floor • (sous-sol + Rez-de-Chaussée +1 étage D.LACARRERE
~ 8 m ~ 24 m max ~ 9 m Volume : 24 x 9 x 8 m3 (2 levels) DRAFT D.LACARRERE
PX84 CREATION NEW SURFACES AT THE GROUND (1st iteration) A : OFFICE 49 m2 (7x7) B : NEW CONTROL ROOM 136 m2 (17 x 8) SHM8 12 m SX8 3 7 m 2869 WORKSHOP 3 m 10 m 15 m 5 m SZ8 TECHNICAL GALLERY 11 m PZ85 B 24 m SUX8 LHCb CONTROL ROOM 10 m NEW POWER CONVERTER 2MVA 2 16 m 7 A EMERGENCY STAIRCASE 9 m 15 m 18 m 6 m SCHEMATIC TOP VIEW - GROUND NO SCALE D.LACARRERE
TOTAL NEW SURFACES at Pit 8 A + B + C + D + E = 360 m2 COST ESTIMATES (mid-2011) BUILDING (1 floor) : 2000 CHF/ m2 ~ 1.0 MCHF SERVICES : ~ 1.0 MCHF Grand TOTAL = 2.0 – 2.2 MCHF PX84 CREATION NEW SURFACES AT THE 1st LEVEL C : OFFICE 35 m2 (7x5) D : OFFICE 40 m2 (8 x5) E : CONFERENCE ROOM 112 m2 (14 x 8) SHM8 12 m SX8 3 7 m 2869 WORKSHOP 3 m 10 m 15 m 5 m SZ8 11 m PZ85 E 24 m SUX8 LHCb CONTROL ROOM 10 m D 2 16 m 7 EMERGENCY STAIRCASE C 15 m 18 m 6 m 9 m SCHEMATIC TOP VIEW – 1st LEVEL NO SCALE D.LACARRERE
SCHEMATIC EAST SIDE D.LACARRERE
TECHNICAL REQUIREMENTS & ESTIMATES(1st approach) Power Converter : 2 MVA Cooling Power : 2 MW Air Conditioning : to be specified New building ~ 432 m2 - 360 m2 available (2 x 180 m2) - 2 levels (RCH + 1floor) Ground : A = Offices ~ 6 x 7 = 42 m2 B = New Control Room ~ 17 x 8 = 136 m2 (current LHCb CR ~ 115 m2) First Level : C = Offices ~ 6 x 5 = 30 m2 D = Offices ~ 8 x 5 = 40 m2 E = Conference Room ~ 14 x 8 = 112 m2 Cost estimates – Infrastructure & Services Building : ~ 2000 CHF/m2 built (*) - total 432 m2 (~ 360 m2 available only) 0.9 – 1.0 MCHF Services : ~ 1 MCHF Grand Total : about 2.0 – 2.2 MCHF + installation of the new servers (*) metallic structure REMARK The new servers (~ 100 racks) will be installed inside the old LHCb Control Room (?) D.LACARRERE
2 nd Iteration New building with 2 floors D.LACARRERE
PX84 SHM8 10 m SX8 3 2869 7 m WORKSHOP 3 m 10 m 15 m 5 m SZ8 TECHNICAL GALLERY 11 m PZ85 NEW SERVERS 24 m LHCb SHOW ROOM GROUND SUX8 10 m NEW POWER CONVERTER 2MVA 16 m EMERGENCY STAIRCASE 15 m 18 m 11 m 4 m NO SCALE SCHEMATIC TOP VIEW - GROUND Sept. 2011 D.LACARRERE D.LACARRERE 9
PX84 SHM8 10 m SX8 3 7 m SERVICE WC1 WORKSHOP 10 m 15 m 5 m SZ8 TECHNICAL GALLERY 11 m PZ85 LHCb CONTROL ROOM 24 m LHCbLABS 1st FLOOR SUX8 10 m NEW POWER CONVERTER 2MVA 16 m EMERGENCY STAIRCASE 15 m 18 m 11 m 4 m NO SCALE SCHEMATIC TOP VIEW – 1st FLOOR D.LACARRERE
PX84 SHM8 10 m SX8 3 WC2 7 m SERVICE WORKSHOP 10 m 15 m STAIRS - LIFT 5 m SZ8 TECHNICAL GALLERY OFFICES 11 m PZ85 24 m LHCbTEST LAB 2nd FLOOR SUX8 10 m MEETING ROOM NEW POWER CONVERTER 2MVA 16 m EMERGENCY STAIRCASE STAIRS 15 m 18 m 11 m 4 m NO SCALE SCHEMATIC TOP VIEW – 2nd FLOOR D.LACARRERE
SCHEMATIC EAST SIDE D.LACARRERE
TECHNICAL REQUIREMENTS & ESTIMATES(2nd approach) Power Converter : 2 MVA • Cooling Power : 2 MW • Air Conditioning : to be specified • Main Characteristics of new building • Dimensions : Length = ~ 31 m Width = ~ 11 m Height = ~ 9 m • Surface (sous –sol) = 150 m2 + technical galleries • Total surface / level = 396 m2 3 levels = 1188 m3 • Total built surface = 1400 m2 – ~ 1000 m2 available Ground : Servers = 24 x 10 = 240 m2 First Level : New Control room ~ 25x10 = 250 m2 Second Level Meeting room 10 x15 = 150 m2 = offices ~ 100 m2 Cost estimates – Infrastructure & Services Building : ~ 2000 CHF/m2 built (*) - total 1400 m2 2.5 – 3.0 MCHF Services : ~ 1.5 MCHF Grand Total : about 4.0– 4.5 MCHF (*) metallic structure REMARK The old LHCb room will be dedicated to the LHCb show room (115 m2) D.LACARRERE