An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NeSSI: An End to the Mythology Rob Dubois CPAC/NeSSI Workshop Seattle, Washington, USA November 9, 2006

  2. Gen III uAnalytical Gen II Electrical Networked & Smart Gen I Fluid Components Where are we? 2008-2012 2004-08 Winston Churchill END USER VALUE 2000-04 "This is not the end. It is not even the beginning of the end. But it is, perhaps, the end of the beginning."

  3. Sample Systems: an anachronism in an ocean of automation. Carbide Plant, Schkopau, Germany c. 1959 (Site now owned by Dow Chemical) What has changed?

  4. Industry Mantra • 80% of process analytical reliability issues are due to the sample system. Why? • Poor understanding of sample integrity • plugged, leaking, fouled, flow stopped? • Poor understanding of sample temperature • condensing, frozen, two-phase? • Poor understanding of sample pressure • vent header influences on analytical results • Low degree of automation

  5. An End to the Mythology • sample systems have to be large • sample system control needs to be done in the DCS • visual flow indicators are required • the need for maintenance “rounds” • an analyzer house is needed

  6. An End to the Mythology • No need for Sample Handling System (S.H.S.) automation • Thermostats are good enough • The inside of an enclosed space carrying flammables is Division/Zone 2 • The use of conduit/seals inside S.H.S. • The continued use of 4-20 mA systems

  7. located very near or on the sample point extractive sampling fully automated (“smart”) environmentally self-contained (no house) tight integration of analytical & sampling uses two orders of magnitude less sample includes a disposal method for used sample By-Line Analysis- a new mini Sampling technique for micro Analyzers Next Step

  8. NeSSI - Score Card • A digital bus (Gen II) tailored to meet the requirements of process analytical • Smart SHS functionality defined • Major NeSSI project(s) on the books • Automation and reliability linked • Generation I proven and accepted • We have set in motion a fundamental and permanent change in how we do process analytical

  9. A Final Thought • “When men got structural steel, they • did not use it to build steel copies • of wooden bridges.” • Ayn Rand. Atlas Shrugged. 1957.