1 / 22

Air Quality and The London Plan

Air Quality and The London Plan. Celeste Giusti Senior Strategic Planner. Introduction. Air quality in London The London Plan Strategic LDF preparation Decisions Design measures Air quality assessments Air quality neutral Emission standards Construction and demolition (SPG)

elam
Download Presentation

Air Quality and The London Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Air Quality and The London Plan Celeste Giusti Senior Strategic Planner

  2. Introduction • Air quality in London • The London Plan • Strategic • LDF preparation • Decisions • Design measures • Air quality assessments • Air quality neutral • Emission standards • Construction and demolition (SPG) • Uncertainty

  3. London in 6 facts London’s population will increase by approximately 1 million in the next 10 years. Global competition for jobs and growth

  4. The Challenge NO2 2010 Annual Mean

  5. The London Plan • Strategic 20 year vision for London • Overarching policy of sustainable development • Identifies growth and associated infrastructure needs • Links partnerships and implementation • Boroughs’ plans are to be in conformity with the London Plan • Guides and sets requirements for development in London

  6. Sustainable Design and ConstructionSupplementary Planning Guidance • Provides additional guidance to the London Plan policies to support implementation • Air quality assessments • Minimising air quality emissions • Air quality neutral • Emission standards for combustion plant • Set out with Mayor’s priorities and Mayor’s best practice

  7. London Plan Policy 7.14 – Air qualityStrategic • Air quality strategy • TfL – controls some roads, cycle hire, congestion charging, low emission zone

  8. Strategic Solutions • Congestion charge • Low Emission Zone • Buses • Since 2003 • Central London • Removed 70,000 vehicles • Reduced PM and NOx emissions by 16% • Covers 98% of London • Standards tightened in 2012 to Euro IV for HGVs, buses and coaches • From 2012 large vans and minibuses included (Euro III) • 450 hybrid buses • 1,600 by 2016 (20% of fleet) • Hydrogen and electric bus trials • SCR retrofit programme for up to 1,000 older buses

  9. Strategic Solutions Cycling Buildings and planning Taxis • From 2012 15 year age limit retiring 2,300 taxis (10% of fleet) • Minimum Euro V standard • Ultra Low Emission taxi from 2020 • Retrofit older buildings • “Air quality neutral” for new developments • CHP/biomass emission standards • Construction machinery and dust • Barclays Cycle Hire • Superhigways • Record near £1bn investment over next 10 years

  10. London Plan Policy 7.14 – Air qualityLDF Preparation

  11. London Plan Policy 7.14 – Air quality • Design measures • Layout • Orientation • Air tightness • Buffer zones • vegetation • Mitigation during construction and demolition • Sustainable transport measures

  12. Internal air quality • specify non-toxic materials (potential use of the Code /BREEAM) • Maintain plant

  13. Air quality assessments • Applies to major developments with some parameters • AQMA • New or exacerbate an air quality exceedence • 150m from sensitive receptors • Sets out the requirements

  14. London Plan Policy 7.14 – Air quality neutral • Major developments • Covers PM10 & NOx • Emission benchmarks for buildings (land uses) and transport • Methodology provided • Mitigation

  15. London Plan Policy 7.14 – Air quality neutral • Mitigation measures • Green planting/walls and screens • Retro-fitting abatement technology to vehicles or flues • Exposure reduction • Contribution to mitigation measures

  16. Emissions standards for combustion plant • Individual gas boilers, communal gas boilers, solid biomass boilers, combined heat and power • Small schemes • Limited scope • Don’t want to be overly onerous • Code for Sustainable Homes / BREEAM credits for low NOx boilers • Standards for solid biomass and CHP plant

  17. Construction and demolition • The Control of Dust and Emissions during construction and demolition SPG • requirement for developers to prepare an Air Quality Statement for construction and demolition activities, including air quality (dust) risk assessments • the Air Quality Statement is to include an air quality (dust) risk assessment for demolition, earthwork, construction stages and trackout (vehicles leaving the site) stages of the works • the identification of the potential scale (large, medium, small) of dust emissions for each stage of work;

  18. Construction and demolition • the identification of the level of risk due to the scale of dust emissions on health, soiling (dirt) and the natural environment, depending on activities, their intensity and the sensitivity of receptors • best practice methods for controlling dust on-site and to prevent trackout • recommendations for monitoring • early notification of new 2015 and 2020 standards for non- road mobile machinery

  19. NRMM From 1 September 2015 • NRMM used on the site of any Major development, as defined in the London Plan, within Greater London will be required to meet Stage IIIA of the Directive as a minimum. • NRMM used on any site within the Central Activity Zone or Canary Wharf will be required to meet Stage IIIB of the Directive as a minimum. From 1 September 2020 • NRMM used on any site within Greater London will be required to meet Stage IIIB of the Directive as a minimum. • NRMM used on any site within the Central Activity Zone or Canary Wharf will be required to meet Stage IV of the Directive as a minimum.

  20. Uncertainty • Government’s Housing standards review • Limits what standards can be specified within housing

  21. Consultations • Sustainable Design and Construction SPG (AQ neutral, CHP/biomass emission standards). Please send in your written response by 6pm 21st October 2013 • SD&C@london.gov.uk with ‘Sustainable Design and Construction SPG’ in the subject box. • Control of Dust and Emissions during Construction and Demolition SPG (including NRMM emission standards). Please send in your written response by 6pm 25th November 2013 • DustandEmissions@london.gov.uk    with ‘The Control of Dust and Emissions during Construction and Demolition’   in the subject box. • www.london.gov.uk- consultations

  22. Thank you

More Related