An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2008 IOWA TSI PIPELINE SAFETY CONFERENCE DIMP Panel August 20, 2008 Jim House

  2. Cousin Eddie

  3. Barn Fires

  4. Serving Without Comprehension? com·pre·hen·sion • Pronunciation:\ˌkäm-pri-ˈhen(t)-shən, -prē • Function: noun • Etymology:Middle French & Latin; Middle French, from Latin comprehension-, comprehensio, from comprehendere to understand, comprise • Date: 15th century • 1 a: the act or action of grasping with the intellect :understandingb: knowledge gained by comprehendingc: the capacity for understanding fully <mysteries that are beyond our comprehension>

  5. DIMP Plan Elements • Knowledge of system • Identify threats • Measure Performance • Monitor results • Evaluate Effectiveness • Prioritize risk

  6. Geographical Information System (GIS) • Mapping system stores pipe and system attributes: • Operating Pressure • Material Type • Cathodic Protection zones • Age of Material • Emergency Shut Down Zones • As-Built process that in conjunction with work management system captures field data for entry into GIS.

  7. GIMMS • Gas Maintenance Management System • Tied to GIS system & CIS system • Collects Maintenance Information • Leak Data • CP reads • Facility Condition Information • Steel Pipe Inspection Information • Assists with scheduling

  8. Latest CP Reading View

  9. Leaks View Close Up

  10. Database ranks each system element Grades the system on: Age Reliability Cathodics Leak History Pressure Issues Inside Meter Sets Analyzes Projects GAP

  11. CP Project • Community to Community • CP Zone verification • Test Point Review • Confirm Isolated Mains and Services. • Faulty Insulators • Consultant Analyze Results • Update GIS system & GIMMS System

  12. CP Zone ID

  13. RUMS (Report of Unsatisfactory Material ) • Database to track material issues. • Train field employees to utilize this process • Engineering Department works with labs and consultants to analyze defects.

  14. Emergency Flow Valve Installation • Excavation Damage most significant threat to gas systems. • Alliant Energy voluntarily installs EFVs. • No change to current practices is foreseen.

  15. Periodic Inspection Deviation ? • Operator may propose to reduce the frequency of periodic inspections based on Engineering analysis and risk assessment. • Submit proposal • State decides