An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unit Standard 24379 Building Consent Process

  2. Building Act Building Regulations Building Code Construction Process District Scheme Resource Management Act Process Overview Government CPIT Unit Standard 24379

  3. Flow Chart CPIT Unit Standard 13003

  4. Chart Headings 1/ To begin the Construction Process 2/ Residential 3/ Project Planning 4/ Government CPIT Unit Standard 13003

  5. 4/Government http://www.govt.nz/ 5/ Building Act 2004 6/ Defines Roles Responsibilities Legal requirements for safe buildings CPIT Unit Standard 13003

  6. 7/ Department Building Housing 8/ Manage TA’s & Building Consent Authorities Write / Building Code & Approved Documents CPIT Unit Standard 13003

  7. 9/ NZ Building Code and approved Documents 10/ Requirements to achieve what is set out in the Building Act 2004 CPIT Unit Standard 13003

  8. Section for sale 10/ Requirements to achieve what is set out in the building act 11/ Ways to comply with the NZ Building Code NZ Standards Acceptable Solutions Producer Statements 12/ Proposed Land Purchase CPIT Unit Standard 13003

  9. 12/ Proposed Land Purchase 13/ LIM Report • 14/ • Soils • Consents • RC Issues • CT • Easements • Flooding • Road developments • Any developments • within 100m radius • Rates LIM Application form 15/ Purchase Land SOLD CPIT Unit Standard 13003

  10. 15/ Purchase Land 16/ Design Project Documentation Site plan, Elevations, Floor plan Sections 17/ Consider District / City Plan LIM Report Personal Requirements 18/ Break / Stretch CPIT Unit Standard 13003

  11. 20/ Recession planes Site coverage Set backs Height Removal of trees Building up land Traffic issues Specific to CCC eg / Log burners 18/ Break- Complete 19/ Non compliances with the District / City Plan 23/ Apply for Resource Consent CPIT Unit Standard 13003

  12. 23/ Apply for Resource Consent • 22/ Project info returned. • Earth quake • Wind zones • Snow loading • Reduced Levels • Flood zones • Soils • Site coverage • Traffic Issues • Non compliances found • by T.A. (District / City Plan) 21/ T.A.only / Apply for PIM. 24/ Approvals From Neighbours CPIT Unit Standard 13003

  13. CPIT Unit Standard 13003

  14. 24/ Approvals Neighbours 25/ Land use. Simple Application T.A. Hearings 26/ Granted Declined CPIT Unit Standard 13003

  15. 26/ Granted Declined 27/ Appeal – Notified R.C. More involved hearing, newspaper etc 28/ PIM returned in 20 Working days 29/ Complete Construction Working Drawing & specifications CPIT Unit Standard 13003

  16. 29/ Complete Construction Working Drawing & specifications 30/ Apply for a Building Consent Documents – PIM, CT, Plans & Specification, Truss design, Producer Statement, Resource Consent 31/ Check for compliance against NZ Building Code by Territorial Authority or Building Consent Authority CPIT Unit Standard 13003

  17. 31/ Check for compliance against NZ Building Code by Territorial Authority or Building Consent Authority 32/ Building Consent issues within 20 working days 33/ Commercial Buildings Meets requirements of NZBC & relevant NZS CPIT Unit Standard 13003

  18. 33/ Commercial Buildings Meets requirements of NZBC a & relevant NZS 34/ Builder begins / Identify site, by means of 35/ CT D.P. & Site plan CPIT Unit Standard 13003

  19. 35/ CT D.P. & Site plan 36/ Set up site Access, water Phone, power Accommodation Fencing Ablutions Security Storage areas CPIT Unit Standard 13003

  20. 36/ Set up site Access, Water, Phone, Power, Accommodation Fencing, Ablutions, Security, Storage areas 37/Required Site Inspections Soils, Plumbing, Foundations, Drainage, Floor – DPC, Brickwork, Pre-wrap, Block-work, Pre line, Pre stop 38/ Any Breach of the Building Act 2004 Notice to Fix CPIT Unit Standard 13003

  21. 38/ Any Breach of the Building Act 2004 Notice to Fix 39/ Final Inspection Code Compliance Certificate (residential) Warrant of Fitness & Compliance Schedule (commercial) CPIT Unit Standard 13003

  22. 39/ Final Inspection Code Compliance Certificate (residential) Warrant of Fitness & Compliance Schedule (commercial) 40/ Fences under 2.0m Sheds under 10m/2 Low retaining walls up to 1.5m high Decks under 0.8m high No Code Compliance Required CPIT Unit Standard 13003

  23. 40/ Fences under 2.0m Sheds under 10m/2 Low retaining walls up to 1.5m high Decks under 0.8m high No Code Compliance Required • 41/ To Help Organize • Time Activity Programme • Forward planning • Monitor Progress • Time allocation • Historical Information CPIT Unit Standard 13003