1 / 13

New eagerness for energy efficiency

New eagerness for energy efficiency. Guro Hauge, Lavenergiprogrammet. The Low Energy Programme . Cooperation programme between government agencies and the business associations . Main purpose: increased competence level in the construction industry about energy efficiency . .

essien
Download Presentation

New eagerness for energy efficiency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New eagerness for energyefficiency Guro Hauge, Lavenergiprogrammet

  2. The Low Energy Programme • Cooperationprogrammebetweengovernmentagencies and the business associations. • Main purpose: increasedcompetencelevel in theconstructionindustryaboutenergyefficiency.

  3. Norway - thebigenergy producer • Large exportofoil and gas • Large productionofhydropower • Whyenergyefficiency?

  4. New eagerness for energyefficiency • 40% ofthestationaryenergyconsumption is in buildings • Conflictbetweennewproduction and environmentalconsiderations • New directives from EU • Kyoto agreement

  5. What’s happening in Norway? • New buildingcodes • Pilot projects • Grant schemes • Focusonincreasedcompetence in thebuildingindustry

  6. Building codes • 25 % less total energy demand in all new buildings, including hot water, lightening, equipment etc. • 40 % increase in the specific requirements concerning U-values, glass area, thermal bridges, air tightness etc. • Minimum 40 % ofheatingdemand from newrenewableenergysources

  7. Building codes • The Technical Regulations are revised as a minimum every five years • Passive house as building standard within 2020

  8. Pilot Projects • Mucheffort in building pilot projects – passive houselevel • Many passive houseprojectsarefinished or under planning Many initiativs:

  9. Grant schemes • Pilot projects: Grant up to 40% ofadditionalcost for building passive houseFavourableloan from theHousingBank • Energy efficiency: Grants pr kWh pr m2, projectsthatreduce minimum 100 000 kWh

  10. The structureoftheconstructionindustry • 300 000 thousand employees in the construction industry • 97% of the companies under 20 employees • We need the big companies as locomotives

  11. Increasedcompetencelevel • Development of knowledge • Have made a plan • Dissemination of knowledge • Systematic further education of sector • Incorporate into building sector education system

  12. Challengesahead • How to trigger measures in households? • How to increasecompetencelevel in 40 000 smallcompanies? • Rehabilitationmeasures to passive houselevel

  13. Thankyou for yourattention!

More Related