1 / 13

Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1

Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1 6383 Erpfendorf / AUSTRIA  0043 5352 77007 www.aignerwaerme.com. Austrian Biomass Heating Systems produced and distributed in North America. Biomass heating. Electricity . Boiler . ORC.

faraji
Download Presentation

Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Since 1993 Consultancy firm for renewable energy Sepp Aigner MBA Hundsbichl 1 6383 Erpfendorf / AUSTRIA  0043 5352 77007 www.aignerwaerme.com

  2. Austrian Biomass Heating Systems produced and distributed in North America

  3. Biomass heating Electricity Boiler ORC Fuel

  4. Wood from windbreak – almost worthless for industrial use - but very valuable as heating fuel 1 m³ windbreakage wood = 200 litre heating oil

  5. The motivation for buying a biomass heating is the short pay back time Basic conditions Investment for € 18.000 woodchip heating € 6.000 Consumption 10.000 liter/year of heating oil € 4.000 Costs of heating oil 0,60 € per liter € 2.000 Consumption 125 m³ / year of woodchips Costs of woodchips € 16 / m³ Pay back time ~ 5 years

  6. How is business in Austria ?

  7. Producers ofwoodchip heatings ? ? ~ 5 ~ 30

  8. Production Gap We are heading for a major production gap! Tendency of demand in Europe Capacity Delivery time = several months

  9. Why are Austrian producers hesitating to export to North America? Different standards (ASME, CSA ...) Different law system Even longer delivery times at the home market

  10. How to distribute? What´s the business idea? Bring the Austrian biomass technology to NA and spread it out from there all over the world. Establish a huge network of partners. Who should produce? Use free capacities in automotiv industry.

  11. What am I looking for in Canada? Partners for the network

  12. Thank you for your attention Sepp Aigner MBA

More Related