Riverside Overpass Master Planning

Riverside Overpass Master Planning. Riverside Elementary School West Contra Costa Unified School District. Presenters: Sally Swanson & Magdy Abdalla June 11, 2013. SALLY SWANSON ARCHITECTS, INC . 220 Sansome Street, Suite 1100, San Francisco CA 94104 | T: 415-445-3045 | www.swanarch.com.

felcia
Download Presentation

Riverside Overpass Master Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Riverside Overpass Master Planning Riverside Elementary School West Contra Costa Unified School District Presenters: Sally Swanson & Magdy Abdalla June 11, 2013 SALLY SWANSON ARCHITECTS, INC. 220 Sansome Street, Suite 1100, San Francisco CA 94104 | T: 415-445-3045 | www.swanarch.com

  2. Agenda • Existing School Site • Master Plan Objectives • Caltrans Proposed Solution • Alternative Locations • Desired District Outcomes • Conclusion • Questions and Answers

  3. Existing School Site

  4. Master Plan Objectives The School’s Master Plan focuses on three elements

  5. Master Plan Objectives • Open Space • Designate open spaces and create policies to ensure preservation and maintenance • Identify safe areas and pleasant open spaces • Landscape elements • Incorporate accessibility • Design standards that will increase safety and comfort

  6. Master Plan Objectives Transportation & Circulation • Minimal conflicts between pedestrians and vehicles • Increase parking facilities- visitor and disabled parking • Clearly identify entries into school- including signage and security 2

  7. 3 Master Plan Objectives • Buildings • High quality architecture and open space • In harmony with immediate surroundings • Facilitate accessibility and pedestrian circulation • Environmentally sustainable landscape • Economically feasible and functional • Support green and sustainable techniques

  8. Master Plan Limitations

  9. Caltrans Proposed Solution

  10. Caltrans Proposed Solution at I-80 and San Pablo Dam Road

  11. Caltrans Proposed Solution Parking Lots and Spaces • Design not to ADA codes: • Path of Travel • In vehicular way • No designated path • Location to Administrative Entrance – 380 feet • Accessible space not compliant • Not Van accessible • Aisle not on passenger side • Reconfiguration of parking necessary

  12. Caltrans Proposed Solution Design Security Concerns • 4- story structure • Creates danger zone • Parking - Pedestrian movement in conflict • Location hides parking Danger Zone Fire Lane

  13. Caltrans Proposed Solution Space Concerns • Four- story structure • reduces site square footage • Reduces available parking The scale of the overpass is not compatible with the height and design of Riverside Elementary

  14. Caltrans Proposed Solution Compromised Community • Cars, copper piping, & Computers • Disabled access in conflict with vehicular traffic • Lack of site control

  15. Caltrans Proposed Solution Noise Concerns • Landscaping removed • Does not improve site acoustics • Overpass traffic on school site cannot be controlled

  16. Caltrans Solution Analysis Caltrans Design

  17. ALTERNATIVE LOCATIONS

  18. Alternative Locations Alternative #1: West side of Amador on Caltrans property

  19. Conceptual Alternative Analysis Alternate #1

  20. Alternative Locations Alternative #2: Corner property at Riverside Avenue

  21. Conceptual Alternative Analysis Alternate #2

  22. Desired District Outcomes

  23. Conclusion • Decision needs to be made due to cost constraints • Save Overpass Funding • Construct Overpass • Finalize Master Plan • Provide Best Development Outcomes

  24. QUESTIONS AND ANSWERS

  25. Alternate 3 Alternative #3: Acoustic barrier adjacent to Amador Street

  26. Alternate 4 Alternative #4: Acoustic barrier adjacent to Amador Street